Tariffs, grid strain and supply chain risks are testing North American geothermal as industry leaders push manufacturing, policy and cross-border collaboration forward.
North American geothermal is entering a critical growth phase, but tariffs, strained electrical grids and concentrated manufacturing could slow momentum. OGA President Paul Frith explains how stronger supply chains, smarter policy and expanded geothermal deployment can position the industry for 2027 and beyond.
Geothermal’s biggest obstacle isn’t technology—it’s getting thermal infrastructure in place before building owners are forced to replace aging HVAC systems.
Thermal energy networks could ease grid strain and accelerate building decarbonization, but deployment must move faster. Industry leaders say utilities, policymakers and contractors need committed infrastructure pipelines before critical replacement windows close.
The former Secretary of Interior and New Mexico gubernatorial candidate talks all things water and its conservation in an exclusive sitdown with The Driller
The former Secretary of Interior and New Mexico gubernatorial candidate talks all things water and its conservation in an exclusive sitdown with The Driller.
What happens when engineers, scientists and GCs step into the natural habitat of Homo Sapiens Drillerus? Mud flies, field instincts take over and engineered plans meet what the ground is actually willing to give you. Take a humorous trip inside drill crew culture and discover why respecting the experience at the controls can help keep projects moving.