Trimble’s DPS900 Piling System aims to cut costs and increase efficiency for building foundations, retaining walls, coffer dams and solar or wind farm installations. The land-based 3-D machine control system works with a variety of piling machine models. It cuts surveying costs and increases safety by reducing the number of people around construction sites. Its accurate positioning decreases navigation time between piles, which can increase production.
Built-in, automated quality assurance and quality control reporting are also featured. The reporting includes start and end positions, time and elevation, actual embedment depth, blow count reporting, and inclination and orientation control. Unique system logins filter reports by operator so managers can better evaluate workers.
Exclusive Insights:Gain access to in-depth insights and best practices for safety, water wells, geothermal, environmental monitoring, newscast, and much more.
Comprehensive Coverage: Stay informed with the latest news and trends through our videos, podcasts, eNewsletters, webinars, and continuing education resources.
Networking Opportunities: Connect with other industry professionals and leaders through our webinars and online platforms.