The Driller
search
cart
facebook twitter linkedin youtube
  • Sign In
  • Create Account
  • Sign Out
  • My Account
The Driller
  • NEWS
    • Water
    • Geothermal
    • Construction
    • Environmental
    • Mining
    • All Industry News
  • CLASSIFIEDS
  • EQUIPMENT
    • Rigs & Heavy Equipment
    • Consumables
    • Pumps
    • Featured Products
  • SAFETY
  • VIDEOS
    • Newscast
    • Drill Talks
    • Ask Brock
    • Emerging Drillers
  • PODCASTS
    • The Newscast
    • The DRILLERcast
  • EDUCATION
    • Drilling Business Insights
    • Reference Desk
  • SOURCEBOOK
  • EVENTS
    • Ground2Grid
    • Conferences & Demo Days
  • ABOUT
    • Contact
    • Advertise
  • SIGN UP
Drilling Industry NewsEnvironmental MonitoringWater

An Alabama Mayor Signed an NDA With a Data Center Developer

Read It Here...

By Lee Hedgepeth
An image of the Alabama Flag with a data center background
Getty Images

Image via Bennian from Getty Images

February 4, 2026

This story is courtesy of Inside Climate News, written by Lee Hedgepeth.

At first, no one knew about the non-disclosure agreement. 

Columbiana’s then-mayor, David Mitchell, had signed the secrecy agreement with DigiPowerX, a data center developer, without consulting City Council members or the public. 

The undated agreement, obtained by Inside Climate News through a public records request, prohibited Mitchell from disclosing any information the developer deemed confidential “whether in oral, written, graphic, electronic, or any other form.” Such information, the agreement outlined, was to be held “in strictest confidence for the sole and exclusive benefit” of the developer. 

Mitchell did not respond to a request for comment. 

The NDA, published here for the first time, would later become a major point of contention for residents of Columbiana, the small town seat of Alabama’s richest county, just south of Birmingham. But once word of the NDA surfaced, it was already too late to stop the expansion.

Now, despite a resounding August 2025 electoral defeat of the mayor who signed the agreement, the city’s new administration, led by Mayor Lisa Davis—the first woman to serve in the role—has been hamstrung by the former mayor’s action. DigiPowerX, a former cryptomining operation that has now pivoted to AI data center, will soon expand its footprint in the small town, and city officials say there’s not much they can do given the former administration’s approval of the project. 

“It’s apparent that this was some behind-the-scenes bullshit,” a lifelong resident of Columbiana, Cody Holliman, said at Thursday’s town hall meeting. “Is there anything that can be done to stop this?”

Mayor Davis was frank in her reply. 

“I appreciate your comment,” she said before answering. “No.” 

Holliman grabbed his coat and headed for the exit. 

“Well, that’s what everybody wants to know,” he said. “Y’all have a good night.”

As he exited, half a dozen other residents followed, some shouting as they left. 

“You can’t be transparent now,” one resident yelled from the exit as police approached. “It’s already happening.”

The crowd applauded. 

Davis quickly apologized. 

“I’m very sorry about that,” Davis said. “Those things were not my decision. So I’m very sorry. I am doing this community town hall to try and bridge a gap in communication so that a business that’s coming in that was already approved by a prior administration, so that we can try to make the best out of the situation.”

According to representatives of the company, DigiPowerX’s phase one expansion is set to be completed in February or March this year. The expansion of the company’s existing business, which had focused on bitcoin mining, will include a pivot to serving AI customers, though the company’s representative refused to disclose who the end user may be. 

Under phase one, the company’s new footprint will include 17 modular structures that will house glycol-cooled servers at the site of a former foundry in the city’s industrial park, though the location is less than 2,000 feet from Columbiana Middle School. 

During the meeting, Council member Karen Lilly had strong words for representatives of DigiPowerX. 

“Have you visited Columbiana Middle School? We have a lot of citizens that stay right by the data center. Have you visited the neighborhood?” she asked. 

“We’ve driven past,” said DigiPowerX vice president of operations Daniel Rotunno.

Lilly asked if company representatives had introduced themselves to the school’s principal or neighbors who live near the site. 

“We’ve just been talking to the city council right now,” a representative said.  

After the meeting, Lilly said the company’s answers were infuriating. 

“They need to know firsthand from the people what their concerns are,” Lilly said. 

For her, a major concern is air pollution caused by backup diesel generators that will be located on site, particularly given the facility’s proximity to a school.

“A lot of kids have asthma,” she said. “We have a lot of kids that have other health problems. I don’t want them to go through having more issues with their health because of this.”

Rotunno said that the facility will use up to 22 megawatts of electricity during phase one—enough energy to power all the residences in Columbiana many times over. Backing up that amount of power could require around seven diesel generators, though a firm number has not yet been determined, he said. 

Exposure to diesel exhaust can lead to “serious health conditions,” according to the EPA. Diesel fumes are “likely to be carcinogenic to humans,” according to the federal agency. The International Agency for Research on Cancer also labels diesel exhaust as “carcinogenic to humans.”

A report produced by researchers from the University of California, Riverside, and published by the think tank Next 10 in 2025, found that emissions from onsite backup diesel generators at data centers have a significant and growing impact on public health. The generators “emit nitrogen oxides and fine particulate matter that worsen respiratory and cardiovascular disease,” the report concluded. 

Rotunno said that the company’s phase two plans will increase the facility’s energy consumption to as much as 70 megawatts. That’s enough energy to power between 28,000 and 63,000 homes, depending on usage. 

Davis said that though she’s had a healthy skepticism of the data center developer, she feels they have made some concessions given the realities on the ground in Columbiana. 

DigiPowerX agreed to switch to a glycol-cooled, closed-loop system after the new administration made clear that the town of around 4,500 did not have the capacity to supply the company with industrial amounts of water.

Davis said she’s also in communication with the mayor of North Tonawanda, New York, the site of another data center operated by the same company. There, noise complaints led city officials to institute a temporary ban on similar facilities. 

“We are interested in finding solutions, but we are making sure that we’re following proper procedures because it is such a sensitive topic,” Austin Tylec, mayor of North Tonawanda, told Noah Wortham of the Shelby County Reporter. “Currently, we are still under a moratorium with data mining centers, or data centers, specifically the creation of new ones or expanding them.”

Davis said she’ll continue to push for meaningful engagement between the company and residents and that her administration will do whatever it can to ensure the expanded facility will have as little impact as possible on residents. 

One resident said he’s not only concerned about data centers’ impact in his town. 

“How many Columbianas will there be in the state of Alabama?” he asked. 

While there’s no official count of data center projects across the Yellowhammer State, cities large and small have begun to reckon with the prospect of data centers of all sizes aiming to move into residents’ back yards. Almost universally, residents have opposed the developments, citing concerns over energy and water usage, noise, air and light pollution, as well as the possibility of rising electricity bills, of which Alabamians already pay the highest in the nation. 

The lack of transparency around such projects, too, has been a major sticking point for residents. In Bessemer, a Birmingham suburb located about 25 miles northwest of Columbiana, Mayor Kenneth Gulley, the city attorney and at least one economic development officer signed NDAs related to a massive, 4.5 million square foot data center development called Project Marvel. Bessemer officials have refused to publicly release copies of the agreement and have greenlit the project over the near-universal opposition of residents. 

Requiring local officials to sign NDAs has become standard operating procedure for data center developers across the country, who are in fierce competition with one another to produce the computational power required by the tech giants to win the race to develop artificial intelligence, or AI, systems. 

And while Columbiana’s new mayor pledged not to sign an NDA related to the proposed data center expansion, others involved in the project may still be subject to secrecy agreements. 

Amy Sturdivant, president and CEO of Shelby County’s economic development organization, was quick to respond when asked at Thursday’s town hall meeting whether she or staffers had signed NDAs related to the DigiPowerX expansion. 

Mayor Davis handed Sturdivant, who was seated in the audience, a microphone to respond. Sturdivant wouldn’t need it long.

“No comment,” she said. More than a hundred attendants groaned in unison. 

“Well there you go,” one resident yelled. 

KEYWORDS: water industry water management

Share This Story

Looking for a reprint of this article?
From high-res PDFs to custom plaques, order your copy today!

Recommended Content

JOIN TODAY
to unlock your recommendations.

Already have an account? Sign In

  • geotechnical drilling rig

    6 Onsite Phrases Environmental Drillers Hate

    Here are six phrases that highlight common frustrations...
    Environmental Monitoring
    By: Jeff Garby
  • Pipe Stuck? Common Causes and Solutions for Drillers

    If you have drilled for any length of time, sooner or...
    World According to Wayne
  • deep water well

    Selecting and Sizing Submersible Pump Cable

    This article helps pump installers and servicers decide...
    Pumps
    By: Bob Pelikan
You must login or register in order to post a comment.

Report Abusive Comment

Manage My Account
  • Newsletters
  • Online Registration
  • Subscription Customer Service
  • Manage My Preferences

More Videos

Sponsored Content

Sponsored Content is a special paid section where industry companies provide high quality, objective, non-commercial content around topics of interest to the The Driller audience. All Sponsored Content is supplied by the advertising company and any opinions expressed in this article are those of the author and not necessarily reflect the views of The Driller or its parent company, BNP Media. Interested in participating in our Sponsored Content section? Contact your local rep!

close
  • truck-mounted 3100GT drilling rig
    Sponsored byGeoprobe

    Equipment That Helps Solve Your Workforce Problem

  • demo of a 8150LS drilling rig during a customer factory visit
    Sponsored byGeoprobe

    Built for You: Smarter Drill Rigs, Stronger Support, Bigger Opportunities

Popular Stories

The Driller Newscast episode 156: From Textbooks to the Boreholes

From Textbooks to the Boreholes

An image of a steering wheel

Drilling Safety Starts Behind the Wheel

An image of a marshy area in Michigan

Michigan’s Other Water Crisis: PFAS’s Prevalence in Private Wells

The DRILLER logo CLASSIFIEDS

COMPRESSORS

EAST WEST MACHINERY & DRILLING IS BUYING AND SELLING AIR COMPRESSORS, AIR BOOSTERS, AIR ENDS & PARTS
Company: East West Machinery

DRILL RIGS

LOOKING FOR LATE MODEL TOPHEADS & DRILLTECH D25'S
Company: Spikes’s Rig Sales

DRILL RIG PARTS

MEETING DRILLERS NEEDS AROUND THE WORLD
Company: East West Machinery

ELEVATORS

SEMCO INC. PIPE ELEVATORS
Company: Semco Inc.

GROUTERS

GROUTING EQUIPMENT - GROUT PUMPS & GROUT HOSE REELS
Company: Geo-Loop Inc.

PUMP HOISTS

SEMCO INC. - BASIC PUMP HOISTS
Company: Semco Inc.

WELL PACKERS

LANSAS PRODUCTS - INFLATABLE WELL PACKERS
Company: Vanderlans Lansas Products

WELL SCREENS

WELL SCREENS & SLOTTED PIPE
Company: Alloy Screen Works

Events

June 15, 2027

Ground2Grid Thermal Energy Summit

Ground2Grid logoGround2Grid is a new, national event where the full lifecycle of Thermal Energy Resources comes together. From the subsurface to the final system connection, this summit brings builders, policymakers, engineers, and investors into one collaborative space to accelerate the future of carbon-neutral heating and cooling.
View All Submit An Event

Products

Water Quality Engineering: Physical / Chemical Treatment Processes

By carefully explaining both the underlying theory and the underlying mathematics, this text enables readers to fully grasp the fundamentals of physical and chemical treatment processes for water and wastewater.

See More Products

The Driller EGO award - Tell Us Who's Making An Impact in the Field

Related Articles

  • An image of Epiroc's new rig

    An Autonomous Drill Rig… in a Quarry? Yep, That Just Happened

    See More
  • water right jesse richardson.jpg

    Water Rights and Industry Challenges at the 2024 Jubilee: An Interview with Jesse Richardson

    See More
  • An Explanation of Fishing Tools for a Cable-Tool Drill Rig

    See More

Related Products

See More Products
  • drilling engineering.jpg

    Drilling Engineering Problems and Solutions: A Field Guide for Engineers and Students

  • Water and Wastewater Treatment: A Guide for the Nonengineering Professional, Second Edition

  • Audel Water Well Pumps and Systems Mini-Ref

See More Products

Related Directories

  • Gicon Pumps & Equipment

    Always Industry Leaders. Since 1979, Gicon Pumps & Equipment has become an industry leader in water-handling and water-processing products. We service our customers in many industries related to the movement of water and all our company locations are equipped and stocked to offer our customers innovative solutions for any application need.
  • Western Hydro

    Serving the Western region of the United States since 1977, Western Hydro is a wholesale supplier of drilling supplies, well service equipment, water pumps and accessories, and water treatment and wastewater handling equipment. Western Hydro aims to serve contractors with the highest quality, most competitively priced products, coupled with support and service second to none.
  • Mobile Drill Intl.

    Mobile Drill Intl supplies a full line of new & used drill rigs along with parts & tooling for the Geotechnical & Environmental industries. MDI is structured to not only be a supplier for our customers, but also a resource to assist you with the growth of your business.
×

Dig deeper into the drilling and water supply industry!

Build your knowledge with The Driller, covering the people, equipment and technologies across drilling markets.

SIGN UP NOW
  • RESOURCES
    • Advertise
    • Contact Us
    • Directories
    • Store
    • Want More
    • Classifieds
  • SIGN UP TODAY
    • Create Account
    • Newsletters
    • Customer Service
    • Manage Preferences
  • SERVICES
    • Marketing Services
    • Reprints
    • Market Research
    • List Rental
    • Survey/Respondent Access
  • STAY CONNECTED
    • LinkedIn
    • Facebook
    • YouTube
    • X (Twitter)
  • PRIVACY
    • PRIVACY POLICY
    • TERMS & CONDITIONS
    • DO NOT SELL MY PERSONAL INFORMATION
    • PRIVACY REQUEST
    • ACCESSIBILITY

Copyright ©2026. All Rights Reserved BNP Media.

Design, CMS, Hosting & Web Development :: ePublishing