Industry Wins
Arizona Pump-Service Company Wins Two Federal Irrigation Well-Rehabilitation Contracts
Hydro Solutions Pump and Well Service secured more than $275,000 in federal contracts to rehabilitate two irrigation wells in Arizona.

A Mesa, Arizona-based pump and well service company has secured two federal contracts totaling more than $275,000 to rehabilitate irrigation wells at the San Carlos Irrigation Project.
The Bureau of Indian Affairs (BIA) awarded Hydro Solutions Pump and Well Service LLC $147,046.58 on October 27 for work on Well No. 119, followed by a $128,463 contract on October 30 for Well No. 80. Both projects are expected to be completed in February 2027.
Keeping Arizona's Irrigation Wells Running
For farmers who rely on groundwater, a productive irrigation well is essential, especially during the hottest, driest parts of the growing season. Keeping that water flowing year after year takes regular maintenance, much like any other piece of equipment.
The San Carlos Irrigation Project has been supplying water to Arizona agricultural operations for more than a century. Authorized by Congress in 1924, the project serves farmland on the Gila River Indian Reservation and surrounding areas.
Its infrastructure includes a network of irrigation wells that help deliver groundwater to farmers who depend on a reliable water supply.
Over time, however, wells can lose production capacity. Pumps wear out, motors need repairs, and sediment or mineral deposits can restrict the flow of water into the well.
In a typical irrigation well, groundwater enters through a screened section near the bottom of the borehole. Many wells also have a gravel pack surrounding the screen, which helps keep fine sand and other formation material from entering the well while allowing groundwater to flow through.
As wells age, sediment buildup and mineral deposits can clog screen openings and reduce production. Depending on the condition of the well, contractors may be able to restore performance through cleaning, redevelopment or replacement of worn pumping equipment.
Exactly what Hydro Solutions will be doing at Wells No. 119 and No. 80 remains unclear. The federal award notices don't provide details about the wells' current conditions, what prompted the rehabilitation work or which methods the contractor plans to use.
Another Round of Work for Hydro Solutions
The two October contracts aren't the company's first jobs at the San Carlos Irrigation Project.
Federal records show Hydro Solutions also received a contract worth approximately $220,590 in June 2026 for repair and rehabilitation work involving Well No. 2A. An earlier award in September 2025 covered evaluation and repair work on that same well.
The latest awards add to the company's federal contracting work and highlight the ongoing demand for contractors who specialize in maintaining existing groundwater infrastructure.
For irrigation operators, a well that isn't producing as much water as it should can quickly become a headache. Reduced capacity can affect water deliveries, while taking a well offline for repairs may put additional pressure on other parts of the system.
For contractors, rehabilitation jobs come with their own challenges. Working on an existing well means dealing with equipment that may have been in service for decades, sometimes with limited information about its condition until inspections begin.
The decision to repair, redevelop or replace a well also depends on whether the work can restore enough production to justify the cost.
For now, the specific challenges awaiting Hydro Solutions at the two wells haven't been made public.
But the contracts highlight a part of the drilling business that doesn't always get much attention. New wells may get the headlines, but keeping existing ones working is just as important, particularly in agricultural regions where reliable groundwater production matters every day.
Looking for a reprint of this article?
From high-res PDFs to custom plaques, order your copy today!







