The Driller
  • Sign In
  • Create Account
  • Sign Out
  • My Account
  • NEWS
  • CLASSIFIEDS
  • EQUIPMENT
  • SAFETY
  • VIDEOS
  • EDUCATION
  • SOURCEBOOK
  • EVENTS
  • SUBMIT
  • ABOUT
  • SIGN UP
cart
facebook twitter linkedin youtube
  • NEWS
  • Water
  • Geothermal
  • Construction
  • Environmental
  • Mining
  • All Industry News
  • EQUIPMENT
  • Rigs & Heavy Equipment
  • Consumables
  • Pumps
  • Featured Products
  • VIDEOS
  • Newscast
  • Drill Talks
  • Ask Brock
  • Emerging Drillers
  • EDUCATION
  • Drilling Business Insights
  • Reference Desk
  • Sponsored Insights
  • EVENTS
  • Conferences & Demo Days
  • Newscast LIVE
  • SUBMIT
  • Drillers @Work
  • ABOUT
  • Contact
  • Advertise
The Driller
search
cart
facebook twitter linkedin youtube
  • Sign In
  • Create Account
  • Sign Out
  • My Account
The Driller
  • NEWS
    • Water
    • Geothermal
    • Construction
    • Environmental
    • Mining
    • All Industry News
  • CLASSIFIEDS
  • EQUIPMENT
    • Rigs & Heavy Equipment
    • Consumables
    • Pumps
    • Featured Products
  • SAFETY
  • VIDEOS
    • Newscast
    • Drill Talks
    • Ask Brock
    • Emerging Drillers
  • EDUCATION
    • Drilling Business Insights
    • Reference Desk
    • Sponsored Insights
  • SOURCEBOOK
  • EVENTS
    • Conferences & Demo Days
    • Newscast LIVE
  • SUBMIT
    • Drillers @Work
  • ABOUT
    • Contact
    • Advertise
  • SIGN UP
MarketsEquipmentConstruction DrillingIndustrial DrillingFoundation DrillingDrill Rigs & Heavy Equipment

Drilling Contractor Relies on Data to Optimize Blasthole Jobs

By Joe Bradfield
Design Blasting Services

Design Blasting Services does a lot of urban work, like this job involving a vibration buffer around the perimeter of what was to become a basement for an office building. Source: Atlas Copco

Driller Steve Majors

“In 30 feet of dirt, another drill would get hung up, but not this drill,” says driller Steve Majors. Source: Atlas Copco

FlexiROC T45's boom

The FlexiROC T45’s boom allows it to drill multiple holes without relocation, saving setup time on the jobsite. Source: Atlas Copco

Design Blasting Services
Driller Steve Majors
FlexiROC T45's boom
September 2, 2015

Design Blasting Services LLC, based in Murfreesboro, Tenn., often finds itself operating in urban settings. So, the precision — and the safety — of Atlas Copco’s FlexiROC and SmartROC top hammer rigs appeal to owner Brent Coleman and his crew.

“Our credibility is linked to safety,” Coleman said, “and our equipment, experience and quality establish that.”

The fuel efficiency of the FlexiROC T45 reduces costs and keeps rigs drilling instead of refueling — another reason Atlas Copco has earned its place on Coleman’s fleet. Design Blasting Services owns a SmartROC T40 and two FlexiROC T45 rigs, and they are renting a third FlexiROC T45.

Along with the safety advantages and fuel savings, Coleman also appreciates the rigs’ ability to record, track and document performance. “I can tell you at least 50 ways you can get in trouble on a job. There are just so many ways to lose money. But if you know your costs and data you’re in good shape.”

Each of their FlexiROC T45 drill rigs was at work on this particular day near Nashville. One was at a quarry opening a new section, and the other was with a SmartROC T40 line drilling a vibration buffer around the perimeter of what was to become a basement for an office building.

Design Blasting Services has moved up to higher-tech top hammer packages based on Atlas Copco’s Rig Control System (RCS) computerized “smart” rigs. The fifth generation RCS was launched in 2014.

“With an RCS-based rig you have a computer giving you data every day on each drill,” Coleman said. “That’s better than 15 people taking information, each recording it differently, and giving it to you whenever you happen to see them. Now, I just look at a computer and I get everything I need.”

It took just two days for the drillers to become familiar with the sounds, feel and high-tech processes of a smart rig.

Data tracking keeps Design’s fleet in optimum working condition, Coleman said. “We don’t overwork our rigs. It’s not just all about footage bonuses for us. It’s about the big picture. Overworking a rig causes downtime. Instead, we operate under a bonus structure with eight indicators, which prioritize things like maintaining the drill in addition to meeting drilling goals. Our guys see what we’re doing here.”

The rigs don’t just drill smarter but use much less fuel, a savings that Coleman can pass on to his customers. It is especially beneficial to a quarry client who supplies Design’s fuel as part of the drilling contract. “With other drills, we were drilling at about 35 cents per foot,” Coleman said. “But with these RCS-based FlexiROC and SmartROC rigs, we do the same work for less than 10 cents a foot.”

Driller Steve Majors pointed to drill history indicated on his display while working at the quarry. He was drilling shot patterns with a FlexiROC T45-11 to open a new section. “For example, this day I got 1,606 feet on 76.2 gallons, and on this one I got 2,201 with 70.0 gallons. It’s all right here in the computer. I can go back and look at the screen when I come back to this quarry.”

At a cost-per-foot comparison, Design Blasting Services saves the quarry about $1,500 a month. And the rigs spend more time drilling and less time refueling, so productivity is higher. “With other drills I’d need fuel after 1,200 feet with the air turned up,” Coleman said. “On average, now I can get 800 feet more with same air on the FlexiROC T45.”

“This modern T45 can drill two full days on a single fill,” Coleman explained. “Each time you have to tram off a bench, you lose about four hours’ drilling time. Being able to drill up to an additional 500 feet per day is a big difference.”

“We’ve got an Atlas Copco service location very close, but even so, rig dependability is still important,” Majors said. “For five drill jobs in a row now, all on different formations in different parts of the state, I’ve had zero downtime. Not one minute. Those jobs included 30- to 75-foot holes at 4 to 5½ inches, sandstone and limestone, on T51 steel.”

The T45 rig’s boom extends to drill multiple holes without moving on the pattern, which means less time is spent relocating to set up on holes, more on drilling them. Patterns and hole size vary according to location and formation, so the drill adapts better than others in this application.

In soft formations this drill has completely outperformed other drills. “Formations like clay and dirt are tough on a drill,” Majors said. “Before six months was up on a previous drill, I lost count how many steels I broke — at least 24. But in more than twice that time — 13 months — I’ve only had three broken steels with this drill. And the other guys we’ve got running Atlas Copco rigs report the same. We can’t all be that good.”

The drill compensates for a bad formation, according to Majors. “Most drills will plug up the bit — too much air and automated control on the down pressure. In 30 feet of dirt, another drill would get hung up, but not this drill. This drill will get the same footage over time on any given pattern, regardless of formation changes, no matter what. Autodrill is a handy feature. The rig drills well without it, but this machine will do all the work for you, when you let it.”

“This is absolutely the best drill I’ve ever run,” Majors said. “There just aren’t any comparisons, and that’s the truth.”

His 20 years of drilling kept him from being easily won over. He pointed out several features that impressed him. “The anti-jam feature is great. You don’t have to feather through. It knows when you’re on a fracture or moving though incompetent formations. By instantly slowing down, it not only prevents dry-firing on the hammer and steel but also keeps the hammer from pushing too fast, which could cause the bit to get stuck or cave in a borehole.”

Working back on the construction site on the vibration buffer, the task had taken about two weeks, progressing at a rate of about 2,000 drill feet per day. The 4-inch-diameter buffer holes were spaced 1 foot apart to a depth of 47 feet. Water encountered at 20 feet was filling the holes under pressure by 40 feet but did not present a problem while drilling.

The plan required removal of 130,000 yards of material, creating a hole whose floor was approximately 50 feet below street level. After the first 5 feet of overburden had been removed, three 15-foot lifts were drilled and blasted to remove the rest of the material.

The main area blasthole pattern consisted of 3-inch-diameter holes with 6-by-6-foot spacing. The perimeter pattern was 1½-inch holes in 3-by-3-foot spacing.

Ten seismographic sensors were placed around the project to document impact of the blast on the surrounding environment. One of the sensors was in a nearby bank. Two more were placed in an office building close to the worksite.

A 300-foot stretch of road surrounded the project. Thirteen locations on the project were close enough to it to require blockading the road, preventing traffic and passers-by from coming too close to a blast. Blasting could take place at 6 a.m., 10 a.m. or 2 p.m. The earliest time was preferred since it was less congested at that time of day and nearby businesses had not yet opened.

Design Blasting Services appreciates concerns about blasting in urban settings. The company’s professionalism and state-of-the-art equipment helped to reassure residents.

“This is our specialty,” Coleman said. “We do jobs like this all over. It may look extreme performing blast operations in a city like this, but we are very particular about what we do. It’s all very planned out.”

Coleman said his choice in manufacturer didn’t just give Design Blasting Services drills with more capabilities. “We like Atlas Copco because they look at how they can make us successful. When we need something, they are there. Kenneth Long, service manager, and all the service technicians at the Nashville Branch are phenomenal. For training and service on these smart rigs, Atlas Copco made the learning curve a lot shorter.”


This story originally appeared in Mining & Construction USA magazine.

KEYWORDS: Atlas Copco blasthole drilling well drilling

Share This Story

Looking for a reprint of this article?
From high-res PDFs to custom plaques, order your copy today!

Joe Bradfield is senior writer for Ellenbecker Communications, an international communications firm specializing in the drilling, mining and construction industries.

Recommended Content

JOIN TODAY
to unlock your recommendations.

Already have an account? Sign In

  • geotechnical drilling rig

    6 Onsite Phrases Environmental Drillers Hate

    Here are six phrases that highlight common frustrations...
    Markets
    By: Jeff Garby
  • Wayne Nash

    Pipe Stuck? Common Causes and Solutions for Drillers

    If you have drilled for any length of time, sooner or...
    Oil & Gas Drilling
    By: Wayne Nash
  • submersible pumps, water well pumps

    Selecting and Sizing Submersible Pump Cable

    This article helps pump installers and servicers decide...
    Pumps
    By: Bob Pelikan
You must login or register in order to post a comment.

Report Abusive Comment

Subscribe For Free!
  • eNewsletters
  • Online Registration
  • Subscription Customer Service
  • Manage My Preferences

The Driller Newscast, Episode 147: Global Geothermal Collaboration at NY-GEO 2025

The Driller Newscast, Episode 147: Global Geothermal Collaboration at NY-GEO 2025

The Driller Newscast: 21st Century Drillers | Part 1 DEMAND

The Driller Newscast: 21st Century Drillers | Part 1 DEMAND

The Driller Newscast: New York Geo Talks 2025 Conference with Hands-on Driller Education

The Driller Newscast: New York Geo Talks 2025 Conference with Hands-on Driller Education

The Driller Newscast: Coiled Tubing Drilling and the Future of Geothermal

The Driller Newscast: Coiled Tubing Drilling and the Future of Geothermal

More Videos

Sponsored Content

Sponsored Content is a special paid section where industry companies provide high quality, objective, non-commercial content around topics of interest to the The Driller audience. All Sponsored Content is supplied by the advertising company and any opinions expressed in this article are those of the author and not necessarily reflect the views of The Driller or its parent company, BNP Media. Interested in participating in our Sponsored Content section? Contact your local rep!

close
  • demo of a DM450 drilling rig during a customer factory visit
    Sponsored byGeoprobe

    Built for You: Smarter Drill Rigs, Stronger Support, Bigger Opportunities

Popular Stories

MainPhotoTwoBrothers.jpg

Two Brothers' Journey Through the Drilling Industry

Tariffs

Tariffs Shake Up the Drilling Industry

AI and Drought Concerns

AI’s Growing Thirst for Water and Power

The Driller Classifieds

COMPRESSORS

EAST WEST MACHINERY & DRILLING IS BUYING AND SELLING AIR COMPRESSORS, AIR BOOSTERS, AIR ENDS & PARTS
Company: East West Machinery

DRILL RIGS

LOOKING FOR LATE MODEL TOPHEADS & DRILLTECH D25'S
Company: Spikes’s Rig Sales

DRILL RIG PARTS

MEETING DRILLERS NEEDS AROUND THE WORLD
Company: East West Machinery

ELEVATORS

SEMCO INC. PIPE ELEVATORS
Company: Semco Inc.

GROUTERS

GROUTING EQUIPMENT - GROUT PUMPS & GROUT HOSE REELS
Company: Geo-Loop Inc.

PUMP HOISTS

SEMCO INC. - BASIC PUMP HOISTS
Company: Semco Inc.

WELL PACKERS

LANSAS PRODUCTS - INFLATABLE WELL PACKERS
Company: Vanderlans Lansas Products

WELL SCREENS

WELL SCREENS & SLOTTED PIPE
Company: Alloy Screen Works

Products

Water Quality Engineering: Physical / Chemical Treatment Processes

Water Quality Engineering: Physical / Chemical Treatment Processes

By carefully explaining both the underlying theory and the underlying mathematics, this text enables readers to fully grasp the fundamentals of physical and chemical treatment processes for water and wastewater.

See More Products

Subscribe to The Driller Newscast

Related Articles

  • Layne Bencor uses noax touchscreen systems to allow operators to monitor a variety of drilling-related data on the jobsite.

    Rugged Computers Deliver Real-Time Data on Drilling Jobs

    See More
  • Mike Beinborn

    Drilling Contractor Finds Solutions for Tough Karst Formations

    See More
  • Efficient Blasthole Production

    See More

Related Products

See More Products
  • 1119083621.jpg

    Formulas and Calculations for Drilling Operations, 2nd Edition

  • 9780128034170.jpg

    Formulas and Calculations for Drilling, Production, and Workover, 4th Edition

  • 9780128231456.jpg

    Seismic While Drilling

See More Products

Related Directories

  • Geoprobe Systems

    Launched in 1987, Geoprobe Systems® manufactures innovative drilling rigs and tooling - engineered to simplify fieldwork - empowering drilling companies around the globe to succeed as productive and profitable industry leaders. We incorporate customer feedback to continuously develop solutions to make drillers' jobs faster, easier, and safer, across water well, geothermal, cathodic protection, geotechnical, environmental, exploration and construction drilling industries. Recognized for providing superior service support, Geoprobe® keeps you in the field via live phone support by our expert service technicians and a network of service centers around the country.
  • Numa Hammers & Bits

    For forty years, Numa has built a strong legacy of high quality, Made in the USA rock drilling hammers, bits, and accessories for drilling DTH, HDD, and reverse circulation holes 3½ to 50½ inches (89 - 1283 mm) in diameter. Our long history of innovation and expertise has resulted in a wide range of reliable DTH and HDD products perfectly suited for hard rock, overburden, or loose strata formations. Numa provides some of the industry’s top rock drilling experts providing a wide array of insight on drilling methods, tooling, fluids, bits, reamers, rock tools, swivels, and more.
  • Little Beaver Inc. | Lone Star Drills

    Little Beaver is a manufacturer of safe and productive drilling equipment and accessories, including augers, trenchers, extensions, points and blades. Lone Star Drills are an innovative addition to the Little Beaver product family, designed to be convenient, powerful solutions for soil sampling, geotechnical testing and auger drilling.
×
Design Blasting Services does a lot of urban work, like this job involving a vibration buffer around the perimeter of what was to become a basement for an office building. Source: Atlas Copco
“In 30 feet of dirt, another drill would get hung up, but not this drill,” says driller Steve Majors. Source: Atlas Copco
The FlexiROC T45’s boom allows it to drill multiple holes without relocation, saving setup time on the jobsite. Source: Atlas Copco

Dig deeper into the drilling and water supply industry!

Build your knowledge with The Driller, covering the people, equipment and technologies across drilling markets.

SIGN UP NOW
  • RESOURCES
    • Advertise
    • Contact Us
    • Directories
    • Store
    • Want More
    • Classifieds
  • SIGN UP TODAY
    • Create Account
    • eNewsletters
    • Customer Service
    • Manage Preferences
  • SERVICES
    • Marketing Services
    • Reprints
    • Market Research
    • List Rental
    • Survey/Respondent Access
  • STAY CONNECTED
    • LinkedIn
    • Facebook
    • YouTube
    • X (Twitter)
  • PRIVACY
    • PRIVACY POLICY
    • TERMS & CONDITIONS
    • DO NOT SELL MY PERSONAL INFORMATION
    • PRIVACY REQUEST
    • ACCESSIBILITY

Copyright ©2025. All Rights Reserved BNP Media.

Design, CMS, Hosting & Web Development :: ePublishing

The Driller
search
cart
facebook twitter linkedin youtube
  • Sign In
  • Create Account
  • Sign Out
  • My Account
The Driller
  • NEWS
    • Water
    • Geothermal
    • Construction
    • Environmental
    • Mining
    • All Industry News
  • CLASSIFIEDS
  • EQUIPMENT
    • Rigs & Heavy Equipment
    • Consumables
    • Pumps
    • Featured Products
  • SAFETY
  • VIDEOS
    • Newscast
    • Drill Talks
    • Ask Brock
    • Emerging Drillers
  • EDUCATION
    • Drilling Business Insights
    • Reference Desk
    • Sponsored Insights
  • SOURCEBOOK
  • EVENTS
    • Conferences & Demo Days
    • Newscast LIVE
  • SUBMIT
    • Drillers @Work
  • ABOUT
    • Contact
    • Advertise
  • SIGN UP