The Driller
  • Sign In
  • Create Account
  • Sign Out
  • My Account
  • NEWS
  • CLASSIFIEDS
  • EQUIPMENT
  • SAFETY
  • VIDEOS
  • EDUCATION
  • SOURCEBOOK
  • EVENTS
  • SUBMIT
  • ABOUT
  • SIGN UP
cart
facebook twitter linkedin youtube
  • NEWS
  • Water
  • Geothermal
  • Construction
  • Environmental
  • Mining
  • All Industry News
  • EQUIPMENT
  • Rigs & Heavy Equipment
  • Consumables
  • Pumps
  • Featured Products
  • VIDEOS
  • Newscast
  • Drill Talks
  • Ask Brock
  • Emerging Drillers
  • EDUCATION
  • Drilling Business Insights
  • Reference Desk
  • Sponsored Insights
  • EVENTS
  • Conferences & Demo Days
  • Newscast LIVE
  • SUBMIT
  • Drillers @Work
  • ABOUT
  • Contact
  • Advertise
The Driller
search
cart
facebook twitter linkedin youtube
  • Sign In
  • Create Account
  • Sign Out
  • My Account
The Driller
  • NEWS
    • Water
    • Geothermal
    • Construction
    • Environmental
    • Mining
    • All Industry News
  • CLASSIFIEDS
  • EQUIPMENT
    • Rigs & Heavy Equipment
    • Consumables
    • Pumps
    • Featured Products
  • SAFETY
  • VIDEOS
    • Newscast
    • Drill Talks
    • Ask Brock
    • Emerging Drillers
  • EDUCATION
    • Drilling Business Insights
    • Reference Desk
    • Sponsored Insights
  • SOURCEBOOK
  • EVENTS
    • Conferences & Demo Days
    • Newscast LIVE
  • SUBMIT
    • Drillers @Work
  • ABOUT
    • Contact
    • Advertise
  • SIGN UP

The Profit's in the Production

November 1, 2010
Jackson Geothermal sets impressive footage record.



It can’t be stressed enough that, although geothermal drilling is done with all the same equipment and tooling as water well drilling, geothermal drilling requires a different mindset. Drillers who have done quarry work know what it means to punch holes in the ground to meet the footage demands of the customer. Geothermal work follows the same production drilling philosophy.

Mansfield, Ohio-based Jackson & Sons Drilling has gone so far to emphasize the difference in its business that the company has changed its marketing name to reflect the nature of its work – Jackson Geothermal.

The company currently operates 15 drills, with the bulk of its work on geothermal projects. For the first six months of the year, the company logged 508,000 drilled feet. The crew works within an eight-hour drive of Mansfield, focusing mainly on large projects, but will take on smaller geothermal projects. Geothermal manager Mark Southward says, “Seventy to 80 percent of our jobs are commercial geothermal projects.”

It was on a recent 92,110-foot project at the Green County Career Center in Xenia, Ohio, that the company raised the bar on productivity by setting a footage record using an Atlas Copco T3W. In a single day, driller Nick Sprowls and his helper, Josh Crawford, drilled 3,050 feet.

The 17-man crew operated seven rigs on the job to complete the project in 10 days, averaging 1,309 feet per rig each day. But the performance of individual drills on certain days helped them overall. For example, on two different days, two 20-year-old Atlas Copco TH55s each completed 2,440 feet of drilling in a shift.

The company doesn’t consider a hole completed until it is drilled and the loop is grouted in place. On this project, each well required setting the loop, then pulling the 20-foot surface casing for each 305-foot hole. Bedrock began at approximately 18 feet.

The day Sprowls completed 3,050 feet, his day began just after 7 a.m., logging his first rod at 7:30 a.m., and signing off on his last hole at 7:45 p.m. Sprowls averaged 2,064 feet a day for 10,320 feet in each five-day week. This is not uncommon for him. Year to date, Sprowls has logged 75,000 drilled feet on five different rigs with 25,455 feet from June alone.

Southward emphasizes that all his men work as a team, with no one standing alone. Owner Jim Jackson has gone to the extent of printing the name “Team Jackson” on uniforms worn by crew members to highlight the team effort needed for everyone to keep these numbers up.

Dave Tingley was the site foreman on the Green County project, and was a major reason for its overall success. Southward says, “Dave breaks in all the new rigs and keeps things moving smoothly. He may have been the driller setting the record that day if he hadn’t been supporting the crew on another task.”

Southward points out that all his drills use the Atlas Copco Secoroc TD40 down-the-hole hammer with the Rocket Bit. “We did 302 holes in 10 days, and that hammer is what got us there.” Citing the bit’s aggressive button structure and air channels, he says, “It is the perfect bit for us because it cleans away from the face so well.”

Jackson used another manufacturer’s hammer in the past, but found rebuilding the Atlas Copco hammers was a better value. “Our other hammers were cheaper, throwaway hammers. Now we work with our distributor, Stockdale Mine Supply, to service the hammers.” Each rig has multiple hammers on site and changes out when necessary. “We don’t mess around with a slow hammer. If it’s slowing down, we change it out and call Randy.”

Randy Neff is Jackson’s Stockdale contact. He says that he put Jackson on a hammer contract for rebuilding hammers. Neff says, “An efficient hammer drills a hole faster, Jackson doesn’t waste time with hammers, and we know what to look for when pulling it apart.”

Jackson also drills 5-inch holes when the rock formation requires it, but not in limestone. For 5-inch work, they use the Atlas Copco Secoroc TD50 hammer.

Cutting back on air also allows them to be more fuel-efficient. “With the 4-inch hammer, you only need 560 cfm; the 5-inch requires 900 cfm. This is production drilling, and it’s all about knowing and managing physical costs,” explains Southward.

For example, the company’s two TH55 drill rigs do not have on-board air, so the crew drills using airpower from an 1,170-cfm, 350-psi auxiliary compressor supplying air to both rigs. Sharing air from one compressor allows them to use less fuel. Each rig drags a hose, drilling five holes before the compressor needs to be pulled forward with a dozer. The newer T3W with Atlas Copco’s electronic air regulation system (EARS) allows the air compressor’s volume and pressure to be dialed back, saving on fuel to supply the necessary air.

Years of experience has given the Jackson crew members a chance to understand where they need to make adjustments and outfit a fleet while being cost conscious. Southward reiterates, “We know what each rig will do. First, it’s about knowing your physical costs. Then it’s all about the production.”
ND 

Share This Story

Looking for a reprint of this article?
From high-res PDFs to custom plaques, order your copy today!

Recommended Content

JOIN TODAY
to unlock your recommendations.

Already have an account? Sign In

  • geotechnical drilling rig

    6 Onsite Phrases Environmental Drillers Hate

    Here are six phrases that highlight common frustrations...
    Geotechnical Investigation
    By: Jeff Garby
  • Wayne Nash

    Pipe Stuck? Common Causes and Solutions for Drillers

    If you have drilled for any length of time, sooner or...
    Markets
    By: Wayne Nash
  • submersible pumps, water well pumps

    Selecting and Sizing Submersible Pump Cable

    This article helps pump installers and servicers decide...
    Pumps
    By: Bob Pelikan
You must login or register in order to post a comment.

Report Abusive Comment

Subscribe For Free!
  • eNewsletters
  • Online Registration
  • Subscription Customer Service
  • Manage My Preferences

The Driller Newscast: Coiled Tubing Drilling and the Future of Geothermal

The Driller Newscast: Coiled Tubing Drilling and the Future of Geothermal

The Driller Newscast: 21st Century Drillers | Part 1 DEMAND

The Driller Newscast: 21st Century Drillers | Part 1 DEMAND

The Driller Newscast, Episode 147: Global Geothermal Collaboration at NY-GEO 2025

The Driller Newscast, Episode 147: Global Geothermal Collaboration at NY-GEO 2025

The Driller Newscast: New York Geo Talks 2025 Conference with Hands-on Driller Education

The Driller Newscast: New York Geo Talks 2025 Conference with Hands-on Driller Education

More Videos

Sponsored Content

Sponsored Content is a special paid section where industry companies provide high quality, objective, non-commercial content around topics of interest to the The Driller audience. All Sponsored Content is supplied by the advertising company and any opinions expressed in this article are those of the author and not necessarily reflect the views of The Driller or its parent company, BNP Media. Interested in participating in our Sponsored Content section? Contact your local rep!

close
  • demo of a DM450 drilling rig during a customer factory visit
    Sponsored byGeoprobe

    Built for You: Smarter Drill Rigs, Stronger Support, Bigger Opportunities

Popular Stories

MainPhotoTwoBrothers.jpg

Two Brothers' Journey Through the Drilling Industry

demo of a DM450 drilling rig during a customer factory visit

Built for You: Smarter Drill Rigs, Stronger Support, Bigger Opportunities

AI and Drought Concerns

AI’s Growing Thirst for Water and Power

The Driller Classifieds

COMPRESSORS

EAST WEST MACHINERY & DRILLING IS BUYING AND SELLING AIR COMPRESSORS, AIR BOOSTERS, AIR ENDS & PARTS
Company: East West Machinery

DRILL RIGS

LOOKING FOR LATE MODEL TOPHEADS & DRILLTECH D25'S
Company: Spikes’s Rig Sales

DRILL RIG PARTS

MEETING DRILLERS NEEDS AROUND THE WORLD
Company: East West Machinery

ELEVATORS

SEMCO INC. PIPE ELEVATORS
Company: Semco Inc.

GROUTERS

GROUTING EQUIPMENT - GROUT PUMPS & GROUT HOSE REELS
Company: Geo-Loop Inc.

PUMP HOISTS

SEMCO INC. - BASIC PUMP HOISTS
Company: Semco Inc.

WELL PACKERS

LANSAS PRODUCTS - INFLATABLE WELL PACKERS
Company: Vanderlans Lansas Products

WELL SCREENS

WELL SCREENS & SLOTTED PIPE
Company: Alloy Screen Works

Products

Water Quality Engineering: Physical / Chemical Treatment Processes

Water Quality Engineering: Physical / Chemical Treatment Processes

By carefully explaining both the underlying theory and the underlying mathematics, this text enables readers to fully grasp the fundamentals of physical and chemical treatment processes for water and wastewater.

See More Products

Subscribe to The Driller Newscast

Related Articles

  • Getting The Most Production Out Of Screened Recovery Wells

    See More
  • Boosting the Gas Production From Low-permeability Wells

    See More
  • The World According to Wayne: A Game Changer for World Energy Production

    See More
×

Dig deeper into the drilling and water supply industry!

Build your knowledge with The Driller, covering the people, equipment and technologies across drilling markets.

SIGN UP NOW
  • RESOURCES
    • Advertise
    • Contact Us
    • Directories
    • Store
    • Want More
    • Classifieds
  • SIGN UP TODAY
    • Create Account
    • eNewsletters
    • Customer Service
    • Manage Preferences
  • SERVICES
    • Marketing Services
    • Reprints
    • Market Research
    • List Rental
    • Survey/Respondent Access
  • STAY CONNECTED
    • LinkedIn
    • Facebook
    • YouTube
    • X (Twitter)
  • PRIVACY
    • PRIVACY POLICY
    • TERMS & CONDITIONS
    • DO NOT SELL MY PERSONAL INFORMATION
    • PRIVACY REQUEST
    • ACCESSIBILITY

Copyright ©2025. All Rights Reserved BNP Media.

Design, CMS, Hosting & Web Development :: ePublishing

The Driller
search
cart
facebook twitter linkedin youtube
  • Sign In
  • Create Account
  • Sign Out
  • My Account
The Driller
  • NEWS
    • Water
    • Geothermal
    • Construction
    • Environmental
    • Mining
    • All Industry News
  • CLASSIFIEDS
  • EQUIPMENT
    • Rigs & Heavy Equipment
    • Consumables
    • Pumps
    • Featured Products
  • SAFETY
  • VIDEOS
    • Newscast
    • Drill Talks
    • Ask Brock
    • Emerging Drillers
  • EDUCATION
    • Drilling Business Insights
    • Reference Desk
    • Sponsored Insights
  • SOURCEBOOK
  • EVENTS
    • Conferences & Demo Days
    • Newscast LIVE
  • SUBMIT
    • Drillers @Work
  • ABOUT
    • Contact
    • Advertise
  • SIGN UP