The Driller
  • Sign In
  • Create Account
  • Sign Out
  • My Account
  • NEWS
  • CLASSIFIEDS
  • EQUIPMENT
  • SAFETY
  • VIDEOS
  • EDUCATION
  • SOURCEBOOK
  • EVENTS
  • SUBMIT
  • ABOUT
  • SIGN UP
cart
facebook twitter linkedin youtube
  • NEWS
  • Water
  • Geothermal
  • Construction
  • Environmental
  • Mining
  • All Industry News
  • EQUIPMENT
  • Rigs & Heavy Equipment
  • Consumables
  • Pumps
  • Featured Products
  • VIDEOS
  • Newscast
  • Drill Talks
  • Ask Brock
  • Emerging Drillers
  • EDUCATION
  • Drilling Business Insights
  • Reference Desk
  • Sponsored Insights
  • EVENTS
  • Conferences & Demo Days
  • Newscast LIVE
  • SUBMIT
  • Drillers @Work
  • ABOUT
  • Contact
  • Advertise
The Driller
search
cart
facebook twitter linkedin youtube
  • Sign In
  • Create Account
  • Sign Out
  • My Account
The Driller
  • NEWS
    • Water
    • Geothermal
    • Construction
    • Environmental
    • Mining
    • All Industry News
  • CLASSIFIEDS
  • EQUIPMENT
    • Rigs & Heavy Equipment
    • Consumables
    • Pumps
    • Featured Products
  • SAFETY
  • VIDEOS
    • Newscast
    • Drill Talks
    • Ask Brock
    • Emerging Drillers
  • EDUCATION
    • Drilling Business Insights
    • Reference Desk
    • Sponsored Insights
  • SOURCEBOOK
  • EVENTS
    • Conferences & Demo Days
    • Newscast LIVE
  • SUBMIT
    • Drillers @Work
  • ABOUT
    • Contact
    • Advertise
  • SIGN UP

Rehabilitation of Injection and Extraction Wells

November 1, 2008
When performance monitoring data suggest decreases in injection or extraction well efficiency below acceptable levels, the well will require rehabilitation to return it to optimal flow rates.



When performance monitoring data suggest decreases in injection or extraction well efficiency below acceptable levels, the well will require rehabilitation by chemical and/or mechanical means to return it to optimal flow rates.

The injection or extraction well should be shut down a minimum 24 hours prior to the removal of equipment in order to allow the well to return to a static condition. Power to the pumps should be secured using lock-out and tag-out procedures to prevent shock or electrocution. Injection well valves should be turned off to prevent water from leaking into the well vault. The electrical wires connecting the transducer or pump should be disconnected. The wellhead equipment will need to be disconnected from the well casing. Once completed, this equipment needs to be hoisted from the well using the development rig.

Following removal, the field crew should document any discoloration on the piping, biological deposition or encrustation, mineral growth and/or deterioration to the downwell equipment in the field notebook, and take pictures as necessary. The removed equipment should be staged near the well site on plastic sheeting to minimize the potential for surface contamination.

Ideally, a video log will be taken in order to determine the well condition. The extent of biofouling, sedimentation and encrustation will be documented. Notes will be taken, noting the depth to water, percentage of screen blockage (include depths, color and type of material), overall water quality, and damage to casing or screen.

Data Comparison

After the completion of the video log, physicochemical and biological assay data analyses will be collected. The results of these analyses will be compared to the baseline data collected during initial development of the well, and used to determine the nature of the problems and the countermeasures. Based on these data, rehabilitation and maintenance measures can be fine-tuned, based on observed changes.

The physicochemical (inorganic) data analyses include phenolphthalein alkalinity, pH, chlorides, total dissolved solids, total hardness, carbonate hardness, non-carbonate hardness, calcium, magnesium, phosphate, iron, copper, nitrate, tannin/lignin, sulfate, silica as SiO2, manganese, saturation index, and redox potential. The iron, manganese and sulfur are analyzed in order to predict the clogging potential, presence of biofouling, and redox potential shifts. The analyses of pH indicate acidity or basicity, which predicts corrosion or encrustation. In addition, pH is combined with redox potential to determine the likely metallic mineral states present. Conductivity is used to indicate the total dissolved solids content, and is a component of the corrosivity assessment.

The biological assay is used to determine the presence of biofouling, the types of organisms that are present, and if the well has increased or decreased in biofouling over time (based on long-term monitoring). The biological assay analyses will include assessment of the total bacterial count per milliliter, the anaerobic bacterial load on the system, the presence of sulfur-reducing bacteria, the presence of iron oxidizing bacteria, branching or filamentous bacteria, protozoans, and the identification of the two largest populations of bacteria present. Ground water samples will be collected from the injection water stream, screened zone (aquifer), and the extraction water stream prior to rehabilitation. The injection and extraction samples should be collected from the sampling ports, and the aquifer sample should be collected using a submersible pump. Biological assay samples do not require refrigeration if they are received by the laboratory within 24 hours of sampling. In addition, no preservatives are to be used in the sampling bottles. 

Bailing and Brushing

During the bailing process, a suction bailer is lowered into the well until it fills with water and sediment. It then is pulled to the surface and emptied. Water from the aquifer then will flow toward the well, and bring in more drilling fluid. The bailer’s up and down motion causes a surging action, which initiates development in the area around the screen. Prior to initiating the bailing procedure, the water level and total depth of well will be measured, noting the amount of sediment in the well. Next, the sediment will be removed from the bottom of the well using the suction bailer, and the contents will be emptied into a 55-gallon drum. The color, clarity and smell of the water will be noted in the field notebook. After the sediment has been removed from the bottom of the well, the total well depth will be measured again. Throughout this process, purge water present in the 55-gallon drum will be decanted to a water storage container, and the amount of material (i.e. sand/silt, etc.) present in the bottom of the drum will be noted (i.e., the amount of sediment removed from the well). The amount of accumulated sediment in the well should progressively decline following successive rehabilitation events.

Brushing simply involves running a hard bristle brush up and down the length of the well screen to remove sediment encrusted on the well casing and screen. Similar to bailing, the up-and-down movement of the brush produces a surging effect, continuing the development process.

Biofouling Treatment

Following the completion of brushing and bailing, a chemical solution is applied to the well to facilitate the breakdown of biofilm, and to disperse mineral salts that are present in the well screen and the filter pack. The chemical treatment will be applied following the manufacturer’s recommendations.

To ensure the proper distribution of the chemical treatment in the screened zone, the treatment mixture will be tremied into the upper, middle and bottom thirds of the well screen. To improve the effectiveness of the chemical treatment, the well will be swabbed every two hours. The agitation caused by swabbing ensures the distribution of the chemical treatment through the screened zone and filter-pack. The solution should remain in the well between 18 hours and 48 hours, depending on the severity of the biofouling and/or encrustation. In addition, it’s important that the pH of the treatment solution stay below 2.0. If the chemical mixture is left in the well overnight, a water and acid mixture should be added to the well to ensure that the pH remains below 2.0.

The following morning, the pH should be tested, and if it is greater than 2.0, it should be lowered with the acid and water mixture. After this has been completed, the well should be swabbed for at least one hour. Next, an airlift pump system will be lowered into the bottom of the well to remove the chemicals, biofilm and mineral salts. During the airlift pumping process, the pH of the discharge water will be monitored, and the airlifting will continue until the pH of the discharge water is less than 5.0. Upon completion of the airlifting, a second chemical treatment will be performed.

Mud Dispersant

In contrast to initial well development, during well rehabilitation, only one mud dispersant treatment will be performed (however, in some cases [e.g., excessive drilling mud present in the well], a second treatment will be necessary). In theory, the mud dispersant treatment will follow the completion of the initial rehabilitation steps of brushing, sediment removal and biofouling treatment. In order for the mud dispersant to penetrate into the filter pack and beyond, fouling materials (i.e. biological growth, mineral encrustations, etc.) need to be removed, and the available flow paths restored.

Dual-swab Airlifting

During well rehabilitation, dual-swab airlifting will be utilized after the mud dispersant treatment application to remove accumulated sediment and ground water containing the treatment chemicals. Ground water containing the treatment chemicals will be removed to the extent practical to minimize potential impacts to the treatment system (e.g., downgradient extraction).

Initially, the dual-swab tool will be inserted into the well and set at the top 10 feet of the screened zone. Airlift pumping will occur at the maximum rate possible for a period of approximately 40 minutes. Due to the turbidity of the airlifted water, the initial water will be pumped into a settlement tank before being transferred to a containment tank. The dual-swab airlift equipment will be raised and lowered throughout the entire screened zone. During the airlift pumping, the air supply will be periodically shut off, allowing the water column to flow back through the screen. The combination of swabbing, pumping and surging enhances the removal of trapped material in the screened zone and filter-pack. Upon completion of dual-swab airlifting, a second mud dispersant treatment/dual-swab airlifting process may follow.

Conventional Surge Pumping

This stage of rehabilitation involves pumping and surging the wells at a variety of rates until no further sand, turbidity and drawdown declines are observed.

Equipment Re-installation

Using the development rig, the PVC casing (injection well) and steel casing and pump (extraction well) will be reset into the well. Once the equipment is lowered into place, the wellhead flange plates will be bolted, and associated piping reconnected to the injection or extraction line. The electrical wires connecting the transducer or pump should be re-connected, and tested. Finally, the equipment should be leak tested and injection and extraction rates tested. 
ND



This article is provided through the courtesy of NASA’s Jet Propulsion Laboratory at the California Institute of Technology.

Share This Story

Looking for a reprint of this article?
From high-res PDFs to custom plaques, order your copy today!

Recommended Content

JOIN TODAY
to unlock your recommendations.

Already have an account? Sign In

  • geotechnical drilling rig

    6 Onsite Phrases Environmental Drillers Hate

    Here are six phrases that highlight common frustrations...
    Opinions
    By: Jeff Garby
  • Wayne Nash

    Pipe Stuck? Common Causes and Solutions for Drillers

    If you have drilled for any length of time, sooner or...
    Markets
    By: Wayne Nash
  • submersible pumps, water well pumps

    Selecting and Sizing Submersible Pump Cable

    This article helps pump installers and servicers decide...
    Pumps
    By: Bob Pelikan
You must login or register in order to post a comment.

Report Abusive Comment

Subscribe For Free!
  • eNewsletters
  • Online Registration
  • Subscription Customer Service
  • Manage My Preferences

The Driller Newscast: Coiled Tubing Drilling and the Future of Geothermal

The Driller Newscast: Coiled Tubing Drilling and the Future of Geothermal

The Driller Newscast: 21st Century Drillers | Part 1 DEMAND

The Driller Newscast: 21st Century Drillers | Part 1 DEMAND

The Driller Newscast, Episode 147: Global Geothermal Collaboration at NY-GEO 2025

The Driller Newscast, Episode 147: Global Geothermal Collaboration at NY-GEO 2025

The Driller Newscast: New York Geo Talks 2025 Conference with Hands-on Driller Education

The Driller Newscast: New York Geo Talks 2025 Conference with Hands-on Driller Education

More Videos

Sponsored Content

Sponsored Content is a special paid section where industry companies provide high quality, objective, non-commercial content around topics of interest to the The Driller audience. All Sponsored Content is supplied by the advertising company and any opinions expressed in this article are those of the author and not necessarily reflect the views of The Driller or its parent company, BNP Media. Interested in participating in our Sponsored Content section? Contact your local rep!

close
  • demo of a DM450 drilling rig during a customer factory visit
    Sponsored byGeoprobe

    Built for You: Smarter Drill Rigs, Stronger Support, Bigger Opportunities

Popular Stories

MainPhotoTwoBrothers.jpg

Two Brothers' Journey Through the Drilling Industry

AI and Drought Concerns

AI’s Growing Thirst for Water and Power

demo of a DM450 drilling rig during a customer factory visit

Built for You: Smarter Drill Rigs, Stronger Support, Bigger Opportunities

The Driller Classifieds

COMPRESSORS

EAST WEST MACHINERY & DRILLING IS BUYING AND SELLING AIR COMPRESSORS, AIR BOOSTERS, AIR ENDS & PARTS
Company: East West Machinery

DRILL RIGS

LOOKING FOR LATE MODEL TOPHEADS & DRILLTECH D25'S
Company: Spikes’s Rig Sales

DRILL RIG PARTS

MEETING DRILLERS NEEDS AROUND THE WORLD
Company: East West Machinery

ELEVATORS

SEMCO INC. PIPE ELEVATORS
Company: Semco Inc.

GROUTERS

GROUTING EQUIPMENT - GROUT PUMPS & GROUT HOSE REELS
Company: Geo-Loop Inc.

PUMP HOISTS

SEMCO INC. - BASIC PUMP HOISTS
Company: Semco Inc.

WELL PACKERS

LANSAS PRODUCTS - INFLATABLE WELL PACKERS
Company: Vanderlans Lansas Products

WELL SCREENS

WELL SCREENS & SLOTTED PIPE
Company: Alloy Screen Works

Products

Water Quality Engineering: Physical / Chemical Treatment Processes

Water Quality Engineering: Physical / Chemical Treatment Processes

By carefully explaining both the underlying theory and the underlying mathematics, this text enables readers to fully grasp the fundamentals of physical and chemical treatment processes for water and wastewater.

See More Products

Subscribe to The Driller Newscast

Related Articles

  • Rehabilitation of Relief Wells

    See More
  • Economics of Water Well Rehabilitation

    See More
  • Well Rehabilitation Issues

    See More
×

Dig deeper into the drilling and water supply industry!

Build your knowledge with The Driller, covering the people, equipment and technologies across drilling markets.

SIGN UP NOW
  • RESOURCES
    • Advertise
    • Contact Us
    • Directories
    • Store
    • Want More
    • Classifieds
  • SIGN UP TODAY
    • Create Account
    • eNewsletters
    • Customer Service
    • Manage Preferences
  • SERVICES
    • Marketing Services
    • Reprints
    • Market Research
    • List Rental
    • Survey/Respondent Access
  • STAY CONNECTED
    • LinkedIn
    • Facebook
    • YouTube
    • X (Twitter)
  • PRIVACY
    • PRIVACY POLICY
    • TERMS & CONDITIONS
    • DO NOT SELL MY PERSONAL INFORMATION
    • PRIVACY REQUEST
    • ACCESSIBILITY

Copyright ©2025. All Rights Reserved BNP Media.

Design, CMS, Hosting & Web Development :: ePublishing

The Driller
search
cart
facebook twitter linkedin youtube
  • Sign In
  • Create Account
  • Sign Out
  • My Account
The Driller
  • NEWS
    • Water
    • Geothermal
    • Construction
    • Environmental
    • Mining
    • All Industry News
  • CLASSIFIEDS
  • EQUIPMENT
    • Rigs & Heavy Equipment
    • Consumables
    • Pumps
    • Featured Products
  • SAFETY
  • VIDEOS
    • Newscast
    • Drill Talks
    • Ask Brock
    • Emerging Drillers
  • EDUCATION
    • Drilling Business Insights
    • Reference Desk
    • Sponsored Insights
  • SOURCEBOOK
  • EVENTS
    • Conferences & Demo Days
    • Newscast LIVE
  • SUBMIT
    • Drillers @Work
  • ABOUT
    • Contact
    • Advertise
  • SIGN UP