The Driller
  • Sign In
  • Create Account
  • Sign Out
  • My Account
  • NEWS
  • CLASSIFIEDS
  • EQUIPMENT
  • SAFETY
  • VIDEOS
  • EDUCATION
  • SOURCEBOOK
  • EVENTS
  • SUBMIT
  • ABOUT
  • SIGN UP
cart
facebook twitter linkedin youtube
  • NEWS
  • Water
  • Geothermal
  • Construction
  • Environmental
  • Mining
  • All Industry News
  • EQUIPMENT
  • Rigs & Heavy Equipment
  • Consumables
  • Pumps
  • Featured Products
  • VIDEOS
  • Newscast
  • Drill Talks
  • Ask Brock
  • Emerging Drillers
  • EDUCATION
  • Drilling Business Insights
  • Reference Desk
  • Sponsored Insights
  • EVENTS
  • Conferences & Demo Days
  • Newscast LIVE
  • SUBMIT
  • Drillers @Work
  • ABOUT
  • Contact
  • Advertise
The Driller
search
cart
facebook twitter linkedin youtube
  • Sign In
  • Create Account
  • Sign Out
  • My Account
The Driller
  • NEWS
    • Water
    • Geothermal
    • Construction
    • Environmental
    • Mining
    • All Industry News
  • CLASSIFIEDS
  • EQUIPMENT
    • Rigs & Heavy Equipment
    • Consumables
    • Pumps
    • Featured Products
  • SAFETY
  • VIDEOS
    • Newscast
    • Drill Talks
    • Ask Brock
    • Emerging Drillers
  • EDUCATION
    • Drilling Business Insights
    • Reference Desk
    • Sponsored Insights
  • SOURCEBOOK
  • EVENTS
    • Conferences & Demo Days
    • Newscast LIVE
  • SUBMIT
    • Drillers @Work
  • ABOUT
    • Contact
    • Advertise
  • SIGN UP

Post-construction Evaluation of HDD Installations - Part 3

By Samuel Ariaratnam and Ivan Beljan
October 1, 2007


Field-testing of HDD installations was performed at two different locations in order to evaluate the annular space region in both a cohesive and a non-cohesive soil medium. This involved the installation of 200-foot bore lengths of 4-inch, 8-inch and 12-inch high-density polyethylene (HDPE) pipe in two different soil mediums – clay and sand. The depth of each installation was based on pipe diameter. Two feet for the 4-inch diameter pipes; 3 feet for the 8-inch diameter pipes; and 4 feet for the 12-inch diameter pipes.

Field locations were chosen based on the homogeneous consistency of the soil, the topography of the site, and the ability to leave the pipe in the ground for a period of one year to conduct long-term analysis. The two locations used for this research were the University of Alberta farms in Edmonton, Alberta, and the Sil Silica sand pit in Bruderheim, Alberta.

The University of Alberta Farm site was chosen because it provided the cohesive soil medium for this research. The upper 12 feet of the soil at this site consists of uniform homogeneous lacustrine Lake Edmonton clay with a moisture content of approximately 27 percent. The sand site was not completely level; however, it contained a homogeneous medium of consistently fine sand, satisfying the non-cohesiveness requirement, from the surface to beyond the testing depths. The classification of the soils is medium-grained sand to silty sand. Laboratory testing revealed a moisture content of approximately 5 percent.

Installation Process

The installations were conducted over a two-day period, using generally accepted drilling practices to ensure that the data collected reflected not only good drilling practice, but also captured the methods and techniques utilized by the majority of drilling contractors. To this extent, fluted-type reamers were used in both the clay and sand soils. Reamers were sized according to the rule of thumb practice of having reamers 1.5 times the diameter of the product pipe being installed. Subsequently, on the 4-inch pipe installation, a 6-inch reamer was used in a one-pass operation; a 12-inch reamer was used for the 8-inch product pipe with a one-pass installation; and an 18-inch reamer was used for the 12-inch pipe, with a pre-ream using the 12-inch reamer.

Post-installation

Both the clay and sand installations were excavated at sections along the bore path in intervals of one day, one week, two weeks, four weeks and one year after installation to visually assess the integrity of the annular space. The analysis of the annular space region commenced once the installations of the HDPE pipes were completed. These observations were imperative to obtain a better understanding of the annular space region over time.

Once the installation of a pipe is achieved, it remains untouched until the next day. Because the 4- and 8-inch pipes were installed in one day, they both were excavated the following day after the installation of the 12-inch pipe. It was decided that the day one excavation of the 12-inch pipe was not necessary, because an indication of the state of the annular space could be observed sufficiently enough through the 4-inch and 8-inch installations. After the initial day one excavation, the pipes were excavated collectively one week, two weeks, four weeks and one year post-installation. The cross-section excavations were conducted along the horizontal section of the bore path near the exit pit side, and continued toward the entry pit on subsequent excavations. All the excavations were done using a backhoe, with hand-digging employed around the perimeter of the pipes. The backhoe excavated to about 1 foot below the depth of installation, and then the hand shovel was used to expose the pipe. Once the area was excavated, a saw was used to cut through the exposed pipe, leaving an open cross section to analyze.

People have hypothesized about the short-term and long-term post-installation state of the annular space, yet very few have actually conducted research in this area. This project involved the evaluation and assessment of:

  • The placement of the pipe in relation to the annular space;

  • Any existence of voids in the annular space; and

  • The state of the annular space in terms of strength, texture and composition.

During the visual examination of the annular space, a geotechnical in-situ test was performed to assess the unconfined shear strength of the annular space and native soil. It should be noted that shear strength tests were only performed at the clay site, as this property never is evaluated in non-cohesive soils such as sand. The in-situ tests were preferred over the laboratory tests, due to the fact that a change in environmental conditions and disturbance of the samples, when extracted, handled and subsequently tested can greatly influence the test results.

In-situ tests and visual assessments validate the hypothesis that all of the pipes that were installed would remain secure, with no evidence of any potential movement. Surface monitoring points placed along the installations revealed that no ground settlement occurred at the surface during installation. Additionally, no ground settlement was observed over time.

ND

Share This Story

Looking for a reprint of this article?
From high-res PDFs to custom plaques, order your copy today!

Samuel Ariaratnam is an engineering professor at Arizona State University; and Ivan Beljan is a project coordinator for PCL Constructors Inc., Edmonton, Alberta.

Recommended Content

JOIN TODAY
to unlock your recommendations.

Already have an account? Sign In

  • geotechnical drilling rig

    6 Onsite Phrases Environmental Drillers Hate

    Here are six phrases that highlight common frustrations...
    The Underground Network
    By: Jeff Garby
  • Wayne Nash

    Pipe Stuck? Common Causes and Solutions for Drillers

    If you have drilled for any length of time, sooner or...
    Oil & Gas Drilling
    By: Wayne Nash
  • submersible pumps, water well pumps

    Selecting and Sizing Submersible Pump Cable

    This article helps pump installers and servicers decide...
    Pumps
    By: Bob Pelikan
You must login or register in order to post a comment.

Report Abusive Comment

Subscribe For Free!
  • eNewsletters
  • Online Registration
  • Subscription Customer Service
  • Manage My Preferences

The Driller Newscast: New York Geo Talks 2025 Conference with Hands-on Driller Education

The Driller Newscast: New York Geo Talks 2025 Conference with Hands-on Driller Education

The Driller Newscast, Episode 147: Global Geothermal Collaboration at NY-GEO 2025

The Driller Newscast, Episode 147: Global Geothermal Collaboration at NY-GEO 2025

The Driller Newscast: 21st Century Drillers | Part 1 DEMAND

The Driller Newscast: 21st Century Drillers | Part 1 DEMAND

The Driller Newscast: Coiled Tubing Drilling and the Future of Geothermal

The Driller Newscast: Coiled Tubing Drilling and the Future of Geothermal

More Videos

Sponsored Content

Sponsored Content is a special paid section where industry companies provide high quality, objective, non-commercial content around topics of interest to the The Driller audience. All Sponsored Content is supplied by the advertising company and any opinions expressed in this article are those of the author and not necessarily reflect the views of The Driller or its parent company, BNP Media. Interested in participating in our Sponsored Content section? Contact your local rep!

close
  • demo of a DM450 drilling rig during a customer factory visit
    Sponsored byGeoprobe

    Built for You: Smarter Drill Rigs, Stronger Support, Bigger Opportunities

Popular Stories

MainPhotoTwoBrothers.jpg

Two Brothers' Journey Through the Drilling Industry

Tariffs

Tariffs Shake Up the Drilling Industry

AI and Drought Concerns

AI’s Growing Thirst for Water and Power

The Driller Classifieds

COMPRESSORS

EAST WEST MACHINERY & DRILLING IS BUYING AND SELLING AIR COMPRESSORS, AIR BOOSTERS, AIR ENDS & PARTS
Company: East West Machinery

DRILL RIGS

LOOKING FOR LATE MODEL TOPHEADS & DRILLTECH D25'S
Company: Spikes’s Rig Sales

DRILL RIG PARTS

MEETING DRILLERS NEEDS AROUND THE WORLD
Company: East West Machinery

ELEVATORS

SEMCO INC. PIPE ELEVATORS
Company: Semco Inc.

GROUTERS

GROUTING EQUIPMENT - GROUT PUMPS & GROUT HOSE REELS
Company: Geo-Loop Inc.

PUMP HOISTS

SEMCO INC. - BASIC PUMP HOISTS
Company: Semco Inc.

WELL PACKERS

LANSAS PRODUCTS - INFLATABLE WELL PACKERS
Company: Vanderlans Lansas Products

WELL SCREENS

WELL SCREENS & SLOTTED PIPE
Company: Alloy Screen Works

Products

Water Quality Engineering: Physical / Chemical Treatment Processes

Water Quality Engineering: Physical / Chemical Treatment Processes

By carefully explaining both the underlying theory and the underlying mathematics, this text enables readers to fully grasp the fundamentals of physical and chemical treatment processes for water and wastewater.

See More Products

Subscribe to The Driller Newscast

Related Articles

  • Post-construction Evaluation of HDD Installations - Part 2

    See More
  • Post-construction Evaluation of HDD Installations - Part 4

    See More
×

Dig deeper into the drilling and water supply industry!

Build your knowledge with The Driller, covering the people, equipment and technologies across drilling markets.

SIGN UP NOW
  • RESOURCES
    • Advertise
    • Contact Us
    • Directories
    • Store
    • Want More
    • Classifieds
  • SIGN UP TODAY
    • Create Account
    • eNewsletters
    • Customer Service
    • Manage Preferences
  • SERVICES
    • Marketing Services
    • Reprints
    • Market Research
    • List Rental
    • Survey/Respondent Access
  • STAY CONNECTED
    • LinkedIn
    • Facebook
    • YouTube
    • X (Twitter)
  • PRIVACY
    • PRIVACY POLICY
    • TERMS & CONDITIONS
    • DO NOT SELL MY PERSONAL INFORMATION
    • PRIVACY REQUEST
    • ACCESSIBILITY

Copyright ©2025. All Rights Reserved BNP Media.

Design, CMS, Hosting & Web Development :: ePublishing

The Driller
search
cart
facebook twitter linkedin youtube
  • Sign In
  • Create Account
  • Sign Out
  • My Account
The Driller
  • NEWS
    • Water
    • Geothermal
    • Construction
    • Environmental
    • Mining
    • All Industry News
  • CLASSIFIEDS
  • EQUIPMENT
    • Rigs & Heavy Equipment
    • Consumables
    • Pumps
    • Featured Products
  • SAFETY
  • VIDEOS
    • Newscast
    • Drill Talks
    • Ask Brock
    • Emerging Drillers
  • EDUCATION
    • Drilling Business Insights
    • Reference Desk
    • Sponsored Insights
  • SOURCEBOOK
  • EVENTS
    • Conferences & Demo Days
    • Newscast LIVE
  • SUBMIT
    • Drillers @Work
  • ABOUT
    • Contact
    • Advertise
  • SIGN UP