The Driller
  • Sign In
  • Create Account
  • Sign Out
  • My Account
  • NEWS
  • CLASSIFIEDS
  • EQUIPMENT
  • SAFETY
  • VIDEOS
  • EDUCATION
  • SOURCEBOOK
  • EVENTS
  • SUBMIT
  • ABOUT
  • SIGN UP
cart
facebook twitter linkedin youtube
  • NEWS
  • Water
  • Geothermal
  • Construction
  • Environmental
  • Mining
  • All Industry News
  • EQUIPMENT
  • Rigs & Heavy Equipment
  • Consumables
  • Pumps
  • Featured Products
  • VIDEOS
  • Newscast
  • Drill Talks
  • Ask Brock
  • Emerging Drillers
  • EDUCATION
  • Drilling Business Insights
  • Reference Desk
  • Sponsored Insights
  • EVENTS
  • Conferences & Demo Days
  • Newscast LIVE
  • SUBMIT
  • Drillers @Work
  • ABOUT
  • Contact
  • Advertise
The Driller
search
cart
facebook twitter linkedin youtube
  • Sign In
  • Create Account
  • Sign Out
  • My Account
The Driller
  • NEWS
    • Water
    • Geothermal
    • Construction
    • Environmental
    • Mining
    • All Industry News
  • CLASSIFIEDS
  • EQUIPMENT
    • Rigs & Heavy Equipment
    • Consumables
    • Pumps
    • Featured Products
  • SAFETY
  • VIDEOS
    • Newscast
    • Drill Talks
    • Ask Brock
    • Emerging Drillers
  • EDUCATION
    • Drilling Business Insights
    • Reference Desk
    • Sponsored Insights
  • SOURCEBOOK
  • EVENTS
    • Conferences & Demo Days
    • Newscast LIVE
  • SUBMIT
    • Drillers @Work
  • ABOUT
    • Contact
    • Advertise
  • SIGN UP

Hardfacing of Conventional and Hollow-stem Augers - Part 2

December 1, 2003
Proper maintenance will ensure maximum efficiency.

Last month, in part one of this series, we covered auger flight wear and the application of the surfacing electrode. In this issue, we'll look at maintenance, checking and cutterheads.

Hardfacing is a process by which weld materials, with superior wear properties to those of the substrate, are applied to the substrate.

Planned Periodic Maintenance

There are a number of different situations that will be encountered - the drilling contractor who has one set of augers, used very occasionally, to the contractor who has multiple auger rigs constantly in use. Remember that the cutterhead must be sharp and have the correct diameter in relation to the flights. If it is under-gauge, abused, damaged or has dull inserts, then it will not do much good to worry about the augers.

Set up an auger maintenance and rotation schedule. The first down day of each month is a workable schedule for most; it is the easy to remember and easy to implement. On the scheduled day, check the diameter, condition and wear on the cutterhead and the lead auger. Assuming the lead auger is not damaged or in really bad shape, hardface it, and it is ready to go. The second month, hardface another auger, put the cutterhead on it and use it as the lead auger. Move the one you just took the cutterhead off of to the second position in the auger string and so on for a year. Try to do an extra one every time you have a slow period or an extra welder. Spend a little extra time to qualify another welder or two on the hardfacing process.

If you have more than an average number of augers, do one a week instead. Or, if you have many augers and the personnel to do the hardfacing, do one a day until you know where you are at. One big factor in a hardfacing program is that, if possible, it should be done at a time when the weather is inclement or the rig is down for some reason, etc. If it can be done under those conditions, it is money in the bank.

After one year, you will have at least a dozen augers hardfaced and by then, spending a couple of hours inspecting the augers and using your gauge(s), you easily will be able to figure if you should do one auger a month or one a year in the future. Depending on how often, and in what formations the augers are used, after you have all

the augers hardfaced, you may find out that checking and maintaining the cutterhead once a year and hardfacing the lead auger may be enough.

Checking

Checking is not uncommon with some electrodes and often it is desirable.

Checking helps reduce residual stress. Sometimes, if the deposit does not check, the residual (locked in) stresses can become so high that deep cracks or spalling result. If this occurs, there is a problem, and it may be desirable to force checking by spraying the hot deposit with a fine water mist or sponging the deposit with a wet cloth. Checking also may be promoted during the cooling period by lightly striking the deposit with a chipping hammer. In every case, consult the product information about the specific electrode being used - before you start hardfacing - so you will know the proper procedures and what to expect.

Cutterheads

The cutterhead, not included within the scope of this article, is nevertheless so important to the overall performance of an auger rig that it must be mentioned. The correct size of the major O.D. of a cutter head should be 5 percent to 15 percent larger than the major O.D. of the flights. Acker Drill, a leading manufacturer of augers, recommends 10 percent. It goes without saying that cutterheads must be sharp to secure maximum efficiency.

If the cutterhead is smaller than the auger flights, accelerated flight wear, particularly on the leading edge of the leading auger, will result and the bore cannot be advanced more than 10 or 20 feet. The reason is that the oversize flights shear the excess wall material off into the undersize hole made by the cutterhead. Once the excess material is at the bottom of the hole, it continues to be compacted by the downward pressure of the oversize flights until early refusal is reached.

If the cutterhead is too large, material will fall off of the flights and have to be lifted again. The larger the cutterhead in relation to the flight size, the higher the percentage of material that will fall off the flights. The bottom of the hole never can be cleaned completely in this situation. However, these factors will vary considerably depending on the composition and the degree of consolidation of the formation.

The best tradeoff will be realized if the cutterhead is 5 percent to 10 percent larger than the flights. This initial relationship probably won't remain constant because the major O.D. of the cutterhead can wear faster than the flights. Therefore, both must be measured occasionally to make sure that relationship between the two always is within tolerance.

ND

Share This Story

Looking for a reprint of this article?
From high-res PDFs to custom plaques, order your copy today!

Recommended Content

JOIN TODAY
to unlock your recommendations.

Already have an account? Sign In

  • geotechnical drilling rig

    6 Onsite Phrases Environmental Drillers Hate

    Here are six phrases that highlight common frustrations...
    Geotechnical Investigation
    By: Jeff Garby
  • Wayne Nash

    Pipe Stuck? Common Causes and Solutions for Drillers

    If you have drilled for any length of time, sooner or...
    World According to Wayne
    By: Wayne Nash
  • deep water well

    Selecting and Sizing Submersible Pump Cable

    This article helps pump installers and servicers decide...
    Markets
    By: Bob Pelikan
You must login or register in order to post a comment.

Report Abusive Comment

Manage My Account
  • eNewsletters
  • Online Registration
  • Subscription Customer Service
  • Manage My Preferences

The Driller Newscast - The Exit Interview: The Battle of Bron vs. Brock

The Driller Newscast - The Exit Interview: The Battle of Bron vs. Brock

The Driller Newscast: Hard Hats, Hot Topics, and Dad Jokes

The Driller Newscast: Hard Hats, Hot Topics, and Dad Jokes

ClimateMaster’s “Geo Joe” Discusses Industry Growth Through State Organizations

ClimateMaster’s “Geo Joe” Discusses Industry Growth Through State Organizations

The Driller Newscast - The Big, Not-So-Beautiful Bill: How to Lose Clean Energy and Alienate the Planet

The Driller Newscast - The Big, Not-So-Beautiful Bill: How to Lose Clean Energy and Alienate the Planet

More Videos

Sponsored Content

Sponsored Content is a special paid section where industry companies provide high quality, objective, non-commercial content around topics of interest to the The Driller audience. All Sponsored Content is supplied by the advertising company and any opinions expressed in this article are those of the author and not necessarily reflect the views of The Driller or its parent company, BNP Media. Interested in participating in our Sponsored Content section? Contact your local rep!

close
  • demo of a DM450 drilling rig during a customer factory visit
    Sponsored byGeoprobe

    Built for You: Smarter Drill Rigs, Stronger Support, Bigger Opportunities

Popular Stories

The Driller Newscast episode 149: Hard Hats, Hot Topics, and Dad Jokes

Hard Hats, Hot Takes, and Dad Jokes: Drillers Talk Safety and Geothermal’s Future

A side profile of a coal mine

Interior Approves Bull Mountains Coal Mine Expansion

An image of a pair of boots

The Job Site Fit Check: Boots

The Driller Classifieds

COMPRESSORS

EAST WEST MACHINERY & DRILLING IS BUYING AND SELLING AIR COMPRESSORS, AIR BOOSTERS, AIR ENDS & PARTS
Company: East West Machinery

DRILL RIGS

LOOKING FOR LATE MODEL TOPHEADS & DRILLTECH D25'S
Company: Spikes’s Rig Sales

DRILL RIG PARTS

MEETING DRILLERS NEEDS AROUND THE WORLD
Company: East West Machinery

ELEVATORS

SEMCO INC. PIPE ELEVATORS
Company: Semco Inc.

GROUTERS

GROUTING EQUIPMENT - GROUT PUMPS & GROUT HOSE REELS
Company: Geo-Loop Inc.

PUMP HOISTS

SEMCO INC. - BASIC PUMP HOISTS
Company: Semco Inc.

WELL PACKERS

LANSAS PRODUCTS - INFLATABLE WELL PACKERS
Company: Vanderlans Lansas Products

WELL SCREENS

WELL SCREENS & SLOTTED PIPE
Company: Alloy Screen Works

Products

Water Quality Engineering: Physical / Chemical Treatment Processes

Water Quality Engineering: Physical / Chemical Treatment Processes

By carefully explaining both the underlying theory and the underlying mathematics, this text enables readers to fully grasp the fundamentals of physical and chemical treatment processes for water and wastewater.

See More Products

The Driller E.G.O. Award - Enter now!

Related Articles

  • Hardfacing of Conventional and Hollow-stem Augers -- Part 1

    See More
  • Hardfacing: Building Erosion-resistant Overlays - Part 2

    See More
  • Hollow-stem Auger Drilling of Monitoring Wells

    See More
×

Dig deeper into the drilling and water supply industry!

Build your knowledge with The Driller, covering the people, equipment and technologies across drilling markets.

SIGN UP NOW
  • RESOURCES
    • Advertise
    • Contact Us
    • Directories
    • Store
    • Want More
    • Classifieds
  • SIGN UP TODAY
    • Create Account
    • eNewsletters
    • Customer Service
    • Manage Preferences
  • SERVICES
    • Marketing Services
    • Reprints
    • Market Research
    • List Rental
    • Survey/Respondent Access
  • STAY CONNECTED
    • LinkedIn
    • Facebook
    • YouTube
    • X (Twitter)
  • PRIVACY
    • PRIVACY POLICY
    • TERMS & CONDITIONS
    • DO NOT SELL MY PERSONAL INFORMATION
    • PRIVACY REQUEST
    • ACCESSIBILITY

Copyright ©2025. All Rights Reserved BNP Media.

Design, CMS, Hosting & Web Development :: ePublishing

The Driller
search
cart
facebook twitter linkedin youtube
  • Sign In
  • Create Account
  • Sign Out
  • My Account
The Driller
  • NEWS
    • Water
    • Geothermal
    • Construction
    • Environmental
    • Mining
    • All Industry News
  • CLASSIFIEDS
  • EQUIPMENT
    • Rigs & Heavy Equipment
    • Consumables
    • Pumps
    • Featured Products
  • SAFETY
  • VIDEOS
    • Newscast
    • Drill Talks
    • Ask Brock
    • Emerging Drillers
  • EDUCATION
    • Drilling Business Insights
    • Reference Desk
    • Sponsored Insights
  • SOURCEBOOK
  • EVENTS
    • Conferences & Demo Days
    • Newscast LIVE
  • SUBMIT
    • Drillers @Work
  • ABOUT
    • Contact
    • Advertise
  • SIGN UP