The Driller
  • Sign In
  • Create Account
  • Sign Out
  • My Account
  • NEWS
  • CLASSIFIEDS
  • EQUIPMENT
  • SAFETY
  • VIDEOS
  • EDUCATION
  • SOURCEBOOK
  • EVENTS
  • SUBMIT
  • ABOUT
  • SIGN UP
cart
facebook twitter linkedin youtube
  • NEWS
  • Water
  • Geothermal
  • Construction
  • Environmental
  • Mining
  • All Industry News
  • EQUIPMENT
  • Rigs & Heavy Equipment
  • Consumables
  • Pumps
  • Featured Products
  • VIDEOS
  • Newscast
  • Drill Talks
  • Ask Brock
  • Emerging Drillers
  • EDUCATION
  • Drilling Business Insights
  • Reference Desk
  • Sponsored Insights
  • EVENTS
  • Conferences & Demo Days
  • Newscast LIVE
  • SUBMIT
  • Drillers @Work
  • ABOUT
  • Contact
  • Advertise
The Driller
search
cart
facebook twitter linkedin youtube
  • Sign In
  • Create Account
  • Sign Out
  • My Account
The Driller
  • NEWS
    • Water
    • Geothermal
    • Construction
    • Environmental
    • Mining
    • All Industry News
  • CLASSIFIEDS
  • EQUIPMENT
    • Rigs & Heavy Equipment
    • Consumables
    • Pumps
    • Featured Products
  • SAFETY
  • VIDEOS
    • Newscast
    • Drill Talks
    • Ask Brock
    • Emerging Drillers
  • EDUCATION
    • Drilling Business Insights
    • Reference Desk
    • Sponsored Insights
  • SOURCEBOOK
  • EVENTS
    • Conferences & Demo Days
    • Newscast LIVE
  • SUBMIT
    • Drillers @Work
  • ABOUT
    • Contact
    • Advertise
  • SIGN UP

Grouting Geothermal Heat Loops At US Naval Observatory

By John H. Berry P.G.
January 4, 2001
This geothermal system provides comfortable heating and cooling at an estimated 40% less coat than the conventional heating and cooling system previously installed.

Heating and cooling the US Naval Observatory building in Washington, DC was an important decision, and selection of a closed loop, ground-source heat pump system demonstrated strong confidence in geothermal technology by the US Navy and the Department of Defense.

The 108-year-old US Naval Observatory was built in 1893 at Observatory Circle on Massachusetts Avenue next to the Vice President's residence. Land that encircles the observatory protects and guards delicate astronomical instruments against smoke and heated air and absorbs vibrations from traffic of public thoroughfares.

Equally important is a reliable heating and cooling system to protect sensitive nautical charts and air almanacs stored in vaults. Despite progress and invention of more advanced navigation techniques, celestial navigation via chronometer and sextant is still an important secondary method of navigation because it cannot be jammed.

The geothermal well field consists of 50 boreholes, six-inches in diameter and 405 feet deep; each borehole has two one-inch loops. The soil encountered was 63-80 feet of saprolite overburden underlain by bedrock of the Potomac group, and the water table was 40 feet below ground surface. Boreholes were drilled and grouted by Mike Barlow of Thermal Loop Corporation and Geothermal Company of Joppa, MD.

Barlow selected a two-step bentonite grout manufactured by CETCO Drilling Products. This two-step grouting system offers a uniform grout from top to bottom of the borehole. The grout is referred to as two-step because Insta-Pac liquid polymer is added separate from Volclay Crumbles granular bentonite. This Insta-Pac/Crumbles bentonite grout blends a granular bentonite with a quick activating liquid polymer to form a slurry that provides a basic economical way to seal boreholes. Once set, this bentonite slurry forms a thick complete grout seal with low permeability.

Barlow said, "The Insta-Pac/Crumbles grout yields 33-gallons of grout per batch, and this allows us to mix double batches of 66-gallons and complete grouting each geothermal borehole with seven batches in one hour." A Geo-Loop 50-500 grout mixer with a piston positive displacement pump was used to pump grout through a one-inch flexible reeled plastic tremie pipe placed into the bottom of the borehole. "You have to be quick," Barlow said, "and make sure all your grouting equipment is ready to go."

The mixing procedure for the grout is to add eight oz. liquid polymer to each 33-gallons of fresh water and mix within the tub of the paddle mixer. Next quickly add one 50 lb. bag of Volclay Crumbles to the water slurry while mixing gently. Start pumping when the Volclay Crumbles have been completely dispensed into the water/polymer mixture. After the batch is pumped, flush pump hoses and tremie pipe with fresh water.

Swelling of granular bentonite (Volclay Crumbles), is delayed by liquid polymer (Insta-Pac), long enough to deliver the bentonite down hole to expand Insitu. The end product is a sturdy grout that bonds to casing and formation with a density of 9.3 lb/gal, yielding 4.01 ft3. The thermal conductivity is 0.45 BTU/hourFt°F and the permeability is 1.0 x 10-8 cm/sec.

Tom Allen of Geothermal Loop Services, Bel Air, MD, tied the circuit piping into the observatory basement from the geothermal well field. He also installed the geothermal exchanger units in the close quarters of the observatory basement.

The geothermal heating and cooling system was designed at 100 tons total, or two tons per borehole, consisting of five circuits with ten wells on each circuit. Two duplex recirculating pumps - each with a manifold and balancing tank to maintain pressure - are housed in the basement of the observatory. This geothermal system provides comfortable heating and cooling at an estimated 40% less cost than the conventional heating and cooling system previously installed.

Share This Story

Looking for a reprint of this article?
From high-res PDFs to custom plaques, order your copy today!

John H. Berry, P.G., is regional manager of drilling products for CETCO, Arlington Heights, Ill., and a regular contributor to The Driller.

Recommended Content

JOIN TODAY
to unlock your recommendations.

Already have an account? Sign In

  • geotechnical drilling rig

    6 Onsite Phrases Environmental Drillers Hate

    Here are six phrases that highlight common frustrations...
    The Underground Network
    By: Jeff Garby
  • Wayne Nash

    Pipe Stuck? Common Causes and Solutions for Drillers

    If you have drilled for any length of time, sooner or...
    Water Wells
    By: Wayne Nash
  • submersible pumps, water well pumps

    Selecting and Sizing Submersible Pump Cable

    This article helps pump installers and servicers decide...
    Opinions
    By: Bob Pelikan
You must login or register in order to post a comment.

Report Abusive Comment

Subscribe For Free!
  • eNewsletters
  • Online Registration
  • Subscription Customer Service
  • Manage My Preferences

More Videos

Sponsored Content

Sponsored Content is a special paid section where industry companies provide high quality, objective, non-commercial content around topics of interest to the The Driller audience. All Sponsored Content is supplied by the advertising company and any opinions expressed in this article are those of the author and not necessarily reflect the views of The Driller or its parent company, BNP Media. Interested in participating in our Sponsored Content section? Contact your local rep!

close
  • demo of a DM450 drilling rig during a customer factory visit
    Sponsored byGeoprobe

    Built for You: Smarter Drill Rigs, Stronger Support, Bigger Opportunities

Popular Stories

MainPhotoTwoBrothers.jpg

Two Brothers' Journey Through the Drilling Industry

AI and Drought Concerns

AI’s Growing Thirst for Water and Power

demo of a DM450 drilling rig during a customer factory visit

Built for You: Smarter Drill Rigs, Stronger Support, Bigger Opportunities

The Driller Classifieds

COMPRESSORS

EAST WEST MACHINERY & DRILLING IS BUYING AND SELLING AIR COMPRESSORS, AIR BOOSTERS, AIR ENDS & PARTS
Company: East West Machinery

DRILL RIGS

LOOKING FOR LATE MODEL TOPHEADS & DRILLTECH D25'S
Company: Spikes’s Rig Sales

DRILL RIG PARTS

MEETING DRILLERS NEEDS AROUND THE WORLD
Company: East West Machinery

ELEVATORS

SEMCO INC. PIPE ELEVATORS
Company: Semco Inc.

GROUTERS

GROUTING EQUIPMENT - GROUT PUMPS & GROUT HOSE REELS
Company: Geo-Loop Inc.

PUMP HOISTS

SEMCO INC. - BASIC PUMP HOISTS
Company: Semco Inc.

WELL PACKERS

LANSAS PRODUCTS - INFLATABLE WELL PACKERS
Company: Vanderlans Lansas Products

WELL SCREENS

WELL SCREENS & SLOTTED PIPE
Company: Alloy Screen Works

Products

Water Quality Engineering: Physical / Chemical Treatment Processes

Water Quality Engineering: Physical / Chemical Treatment Processes

By carefully explaining both the underlying theory and the underlying mathematics, this text enables readers to fully grasp the fundamentals of physical and chemical treatment processes for water and wastewater.

See More Products

Subscribe to The Driller Newscast

Related Articles

  • Ask Brock video series

    Looking at a Geothermal Grouting System? Hear Us Out

    See More
  • Ask Brock video series

    Tips for Installing, Grouting 600-Foot Geothermal Loops

    See More
  • The World According To Wayne: The Difference Between Geothermal Grouting and Well Grouting

    See More

Related Products

See More Products
  • 1119819962.jpg

    Stantec's Water Treatment: Principles and Design, Updated, 3rd Edition

See More Products

Events

View AllSubmit An Event
  • October 23, 2013

    Geothermal Heat Pump Innovations: Design, Finance, Regulations

     The AGWT is in favor of developing energy resources provided water resources are not jeopadized.
  • November 6, 2013

    AGWT Geothermal Heat Pump Innovations: Design, Finance, Regulations

     The AGWT is in favor of developing energy resources provided water resources are not jeopadized.
View AllSubmit An Event

Related Directories

  • Geo-Loop Inc.

    We are an employee-owned company in NW Iowa. We have been in the water well and geothermal fields for over 28 years and build a full line of grout pumps, hose reels, loop reels, and other related equipment as well as custom units. Let us help you build your next machine!
×

Dig deeper into the drilling and water supply industry!

Build your knowledge with The Driller, covering the people, equipment and technologies across drilling markets.

SIGN UP NOW
  • RESOURCES
    • Advertise
    • Contact Us
    • Directories
    • Store
    • Want More
    • Classifieds
  • SIGN UP TODAY
    • Create Account
    • eNewsletters
    • Customer Service
    • Manage Preferences
  • SERVICES
    • Marketing Services
    • Reprints
    • Market Research
    • List Rental
    • Survey/Respondent Access
  • STAY CONNECTED
    • LinkedIn
    • Facebook
    • YouTube
    • X (Twitter)
  • PRIVACY
    • PRIVACY POLICY
    • TERMS & CONDITIONS
    • DO NOT SELL MY PERSONAL INFORMATION
    • PRIVACY REQUEST
    • ACCESSIBILITY

Copyright ©2025. All Rights Reserved BNP Media.

Design, CMS, Hosting & Web Development :: ePublishing

The Driller
search
cart
facebook twitter linkedin youtube
  • Sign In
  • Create Account
  • Sign Out
  • My Account
The Driller
  • NEWS
    • Water
    • Geothermal
    • Construction
    • Environmental
    • Mining
    • All Industry News
  • CLASSIFIEDS
  • EQUIPMENT
    • Rigs & Heavy Equipment
    • Consumables
    • Pumps
    • Featured Products
  • SAFETY
  • VIDEOS
    • Newscast
    • Drill Talks
    • Ask Brock
    • Emerging Drillers
  • EDUCATION
    • Drilling Business Insights
    • Reference Desk
    • Sponsored Insights
  • SOURCEBOOK
  • EVENTS
    • Conferences & Demo Days
    • Newscast LIVE
  • SUBMIT
    • Drillers @Work
  • ABOUT
    • Contact
    • Advertise
  • SIGN UP