Drilling contractors find themselves in the field far more often than most. Rig-up, rig-down, there are always memorable views worth sharing. Our Drillers @Work gallery for Fall 2019 showcases photos submitted by readers from September – November of 2019.
Drillers with Southeast Drilling start a well project with a freshly restored Bucyrus-Erie 22W in Artesia, New Mexico. The rig was restored by Mark Hammond in honor of original owner Michael Ray Campbell.
Source: Marvin Hammond / Southeast Drilling
A crew with Munoz Foundation Drilling Inc. tackles a Wal-Mart service station project in Round Rock, Texas.
Source: Jacky Munoz / Munoz Foundation Drilling Inc.
A crew with Toy Drilling conducts exploration drilling for limestone in Armstrong County, Pennsylvania.
Source: Brody Toy / Toy Drilling
A driller with Drill Masters Africa pulls rods.
Source: Michael Stanford / Drill Masters Africa
A crew with MW Electric mobilizes their rig for a cathodic project in Durango, Colorado.
Source: Kurt Neil / MW Electric Inc.
A crew with Hefty Drilling installs a fire protection well for a new health clinic in Tok, Alaska.
Source: Johnny Kay / Hefty Drilling Inc.
A restored Bucyrus-Erie 22W cable tool rig is ready to be put back in action in Artesia, N.M. Restoration efforts were done in honor of the memory of Michael Ray Campbell, the original owner of the drill rig.
Source: Marvin Hammond / Southeast Drilling
Copyright ©2025. All Rights Reserved BNP Media.
Design, CMS, Hosting & Web Development :: ePublishing