Renovation Nation Highlights Green Building CollaborationThe Discovery Channel’s nationally televised show Planet Green Renovation Nation will highlight a uniquely green home in Boulder, Colo. The show’s host, Steve Thomas, visits
Last
month, we talked about full voltage-start pump control panels. This month, we will
cover the other two main components in a standard panel – the contactor or
starter, and overload-protection devices -- as well as single-phase and current-unbalance protection
offered by panels.
Recently,
we had an occasion to need a permit to discharge some produced ground water in
a swamp. There were a pile of tests and standards we had to meet to get the
permit. Since we were discharging pure, unpolluted ground water into swamp that
was so turbid you couldn’t see a 12-foot ‘gator at 1 foot, I figured we’d have
no problem.
There are two common types of ground water sampling equipment used in direct-push technology methods – tools for obtaining one-time grab samples, and wells installed using DPT for short-term or long-term sampling.
CETCO Oilfield Services, a pioneer in the treatment of oilfield wastewater, has developed NEMOH – a nomadic environmental media operated host – that acts as a hosting treatment vessel for
ViaLogy PLC, an innovator of network-centric, real-time processing platforms for sensor applications, recently announced that its QuantumRD oil exploration technology and service has been credited with locating with a major
Geology plays an important role in the success or failure of a core-drilling program. Many times, due to lack of geological information, the designed drilling system and operational parameters do not fulfill the desired objective, resulting in various geological and geotechnical problems. With proper understanding of the geology of the area under investigation, however, these problems can be avoided and minimized.
The closure of the former Ravenscraig Steelworks in Glasgow, Scotland, created one of the largest brownfield sites in Europe, measuring some 1,125 acres. Future plans for the site include a town center with zones comprising industrial, residential, retail, leisure and innovation.Raeburn Drilling and Geotechnical was appointed to undertake ground investigation within a 6-week timeframe.