Singapore Power Co. awarded Siemens/Samsung Engineering & Construction JV a $400 million project to build a 740-megawatt power station extension. A temporary cofferdam sheetpile wall and two permanent sheetpile lines
Each day, more than 14,000 cars and trucks travel the steep and winding approach roads to Hoover Dam. There, they cross the Colorado River by driving across the dam on
The reverse-air rotary drilling method operates by the same general principles as direct-mud rotary, except that compressed air is pumped down the drill rods and returns with the drill cuttings up through the annulus.
My father, Porky Sr., was a tool pusher – a drill supervisor – when I was young, and I went with him almost everywhere. Where you saw him, usually you would see me ...
There are a lot of formally educated people who achieve very little on or off the job. They know what to do, and they know how to do it. The problem is they’re not motivated enough to do much about it.