search
cart
facebook twitter linkedin youtube
  • Sign In
  • Join Today
  • Sign Out
  • My Account
  • NEWS
  • WATER
  • ENERGY
    • Geothermal
    • Mining
    • Petroleum
  • CONSTRUCTION
    • Horizontal Directional Driling
    • Infrastructure
  • SAFETY
  • DRILLER STUDIOS
    • The Driller Newscast
    • Videos
    • Podcasts
      • The Newscast
      • The DRILLERcast
    • Driller or Digger?
  • VOICES
  • PRODUCTS
    • Featured Products
    • Sponsored Insights
  • CLASSIFIEDS
  • SOURCEBOOK
  • EVENTS
    • Ground2Grid
    • Conferences & Demo Days
    • Webinars
  • ABOUT
    • Contact
    • Advertise
  • JOIN

Ground Water Contamination Agreement Reached for Paducah

August 31, 2005
Special Web feature

National Driller August 2005 e-Newsletter

The environmental cleanup of hazardous waste at the Paducah Gaseous Diffusion Plant (PGDP) continues with an agreement for the U.S. Department of Energy (DOE) to install a system to remove a degreasing solvent causing ground water pollution at the plant.

The state of Kentucky, DOE and the U.S. Environmental Protection Agency (EPA) signed the Interim Record of Decision (ROD) today. While DOE is responsible for the cleanup of the site, Kentucky and EPA have oversight of the remediation of the plant.

The ROD requires DOE to install a full-scale electrical resistance heating system near the C-400 building, used for decades as the plant's primary parts cleaning facility. Large volumes of Trichloroethylene (TCE), a degreasing solvent, leaked underground and were concentrated near the southeast and southwest corners of the C-400 building.

"With the three parties reaching agreement on the C-400 Interim ROD, cleanup of one of the most contaminated areas of the plant can begin in earnest," says Lloyd Cress, commissioner of the state Department for Environmental Protection. "The approval process has taken time, but it is critical that the proposed cleanup action adequately address not only the present situation, but also provide protective measures for future uses of the property. We believe this Interim ROD lays the groundwork for that. "

Design of the system will take 15 months. The system is expected to become operational in the fall of 2006 and will be active for several years. An excavation near the C-400 building in 1986 identified TCE as having leaked from a storm sewer line into shallow subsurface soils.

Share This Story

Looking for a reprint of this article?
From high-res PDFs to custom plaques, order your copy today!

Recommended Content

JOIN TODAY
to unlock your recommendations.

Already have an account? Sign In

  • Brock Yordy speaks with a group of Geothermal Drillers

    The Road to 2050

    The geothermal exchange industry is an expanding,...
    Geothermal
    By: Brock Yordy
  • A drilling rig hitched to a pickup truck

    Stories From the Site: Some of the Wildest Things Hit While Drilling

    There are many zany things drillers encounter everyday...
    Infrastructure
    By: John Truesdale
  • Western Kansas

    EPA Turns Attention to Rural Water Challenges in Western Kansas

    Rural water systems rarely make national headlines, but...
    Water
    By: John Oldani
You must login or register in order to post a comment.

Report Abusive Comment

Manage My Account
  • Join The Driller
  • Manage My Preferences
  • Customer Service

More Videos

Sponsored Content

Sponsored Content is a special paid section where industry companies provide high quality, objective, non-commercial content around topics of interest to the The Driller audience. All Sponsored Content is supplied by the advertising company and any opinions expressed in this article are those of the author and not necessarily reflect the views of The Driller or its parent company, BNP Media. Interested in participating in our Sponsored Content section? Contact your local rep!

close
  • ClimateMaster installation in on-base housing
    Sponsored byClimateMaster

    A Driller and HVAC Professional Have a Cup of Coffee

  • 2 men with a piece of machinery
    Sponsored byGeoprobe

    One Rig Service Partner. All Brands. Less Downtime.

  • 3135GT drilling rig
    Sponsored byGeoprobe

    Driller Feedback Drives Innovation in Geotechnical & Environmental Drilling

Popular Stories

spears for drilling tool fishing

Star Iron Works, Inc. Manufactures Fishing Tools including Spears and Overshots

Jim Beath: A Driller's Life

The Well From Hell — A Halloween Tale from the Rig Floor (Part 1)

Jim Beath: A Driller's Life

The Well From Hell — A Halloween Tale from the Rig Floor (Part 2)

The DRILLER logo CLASSIFIEDS

COMPRESSORS

EAST WEST MACHINERY & DRILLING IS BUYING AND SELLING AIR COMPRESSORS, AIR BOOSTERS, AIR ENDS & PARTS
Company: East West Machinery

DRILL RIGS

LOOKING FOR LATE MODEL TOPHEADS & DRILLTECH D25'S
Company: Spikes’s Rig Sales

DRILL RIG PARTS

MEETING DRILLERS NEEDS AROUND THE WORLD
Company: East West Machinery

ELEVATORS

SEMCO INC. PIPE ELEVATORS
Company: Semco Inc.

GROUTERS

GROUTING EQUIPMENT - GROUT PUMPS & GROUT HOSE REELS
Company: Geo-Loop Inc.

PUMP HOISTS

SEMCO INC. - BASIC PUMP HOISTS
Company: Semco Inc.

WELL PACKERS

LANSAS PRODUCTS - INFLATABLE WELL PACKERS
Company: Vanderlans Lansas Products

WELL SCREENS

WELL SCREENS & SLOTTED PIPE
Company: Alloy Screen Works

Events

June 15, 2027

Ground2Grid Thermal Energy Summit

Ground2Grid logoGround2Grid is a new, national event hosted by The Driller where the full lifecycle of Thermal Energy Resources comes together. From the subsurface to the final system connection, this summit brings builders, policymakers, engineers, and investors into one collaborative space to accelerate the future of carbon-neutral heating and cooling.
View All Submit An Event

Products

Water Quality Engineering: Physical / Chemical Treatment Processes

By carefully explaining both the underlying theory and the underlying mathematics, this text enables readers to fully grasp the fundamentals of physical and chemical treatment processes for water and wastewater.

See More Products

Related Articles

  • Early Results from Hydraulic Fracturing Study Show No Direct Link to Ground Water Contamination

    See More
  • New Study Shows No Evidence of Ground Water Contamination from Hydraulic Fracturing

    See More
  • Does Pasture Irrigation Increase Ground Water Contamination?

    See More
×

Dig deeper into the drilling and water supply industry!

Build your knowledge with The Driller, covering the people, equipment and technologies across drilling markets.

JOIN NOW
  • RESOURCES
    • Advertise
    • Contact Us
    • Directories
    • Store
    • Want More
    • Classifieds
  • JOIN TODAY
    • Create Account
    • Newsletters
    • Customer Service
    • Manage Preferences
  • SERVICES
    • Marketing Services
    • Reprints
    • Market Research
    • List Rental
    • Survey/Respondent Access
  • STAY CONNECTED
    • LinkedIn
    • Facebook
    • YouTube
    • X (Twitter)
  • PRIVACY
    • PRIVACY POLICY
    • TERMS & CONDITIONS
    • DO NOT SELL MY PERSONAL INFORMATION
    • PRIVACY REQUEST
    • ACCESSIBILITY

Copyright ©2026. All Rights Reserved BNP Media, Inc. and BNP Media II, LLC.

Design, CMS, Hosting & Web Development :: ePublishing