The Driller
  • Sign In
  • Create Account
  • Sign Out
  • My Account
  • NEWS
  • CLASSIFIEDS
  • EQUIPMENT
  • SAFETY
  • VIDEOS
  • EDUCATION
  • SOURCEBOOK
  • EVENTS
  • SUBMIT
  • ABOUT
  • SIGN UP
cart
facebook twitter linkedin youtube
  • NEWS
  • Water
  • Geothermal
  • Construction
  • Environmental
  • Mining
  • All Industry News
  • EQUIPMENT
  • Rigs & Heavy Equipment
  • Consumables
  • Pumps
  • Featured Products
  • VIDEOS
  • Newscast
  • Drill Talks
  • Ask Brock
  • Emerging Drillers
  • EDUCATION
  • Drilling Business Insights
  • Reference Desk
  • Sponsored Insights
  • EVENTS
  • Conferences & Demo Days
  • Newscast LIVE
  • SUBMIT
  • Drillers @Work
  • ABOUT
  • Contact
  • Advertise
The Driller
search
cart
facebook twitter linkedin youtube
  • Sign In
  • Create Account
  • Sign Out
  • My Account
The Driller
  • NEWS
    • Water
    • Geothermal
    • Construction
    • Environmental
    • Mining
    • All Industry News
  • CLASSIFIEDS
  • EQUIPMENT
    • Rigs & Heavy Equipment
    • Consumables
    • Pumps
    • Featured Products
  • SAFETY
  • VIDEOS
    • Newscast
    • Drill Talks
    • Ask Brock
    • Emerging Drillers
  • EDUCATION
    • Drilling Business Insights
    • Reference Desk
    • Sponsored Insights
  • SOURCEBOOK
  • EVENTS
    • Conferences & Demo Days
    • Newscast LIVE
  • SUBMIT
    • Drillers @Work
  • ABOUT
    • Contact
    • Advertise
  • SIGN UP

Project Profile: Innovation Keys Sound Barrier Project

November 1, 2006
Syracuse Exploration Co. specializes in drilling bedrock shafts.


In order to construct a concrete sound barrier around Interstate 695 (the Baltimore beltway), JTE Inc. of Lorton, Va., was required to drill 300 pile holes 24 inches and 30 inches in diameter. To accomplish this, a two-step drilling procedure was employed using augers and down-hole hammers.

The first part of the procedure involved auger drilling a 30-inch diameter hole to a depth of 10 feet to 15 feet, or until hitting bedrock. The auger then was pulled out of the hole and casing was put down.

Auger drilling was abandoned, because trying to drill through bedrock with an auger has proven to be very labor-intensive and costly, due to its inability to efficiently fracture rock formations. Typically in these conditions, an auger has a tendency to break down and perform very slowly. To avoid this costly process, JTE contracted Syracuse Exploration Company (SEC), a drilling and consulting firm specializing in drilling bedrock shafts throughout the Eastern United States. The staff out of SEC's Mid-Atlantic office located in Hagerstown, Md., conducted the beltway project.

A unique drilling method was used on the sound barrier project.

The construction site in Maryland was situated along one of the busiest roadways in America. The continuous traffic, overhead power lines and difficult terrain of the area were very restricting, and drastically affected the use of certain construction equipment. To combat this, SEC utilized a track-mounted, hydraulic top-head drive drilling rig equipped with a 900/350 compressor. This rig provided the flexible maneuvering needed in the confined area. The bedrock in Maryland consists of many different formations of rock, ranging from limestone to marble. SEC utilized the Numa Champion 240 down-hole hammer with a 24-inch bit to efficiently drill through the hard rock.

“We chose the hammer not only for the product, but the support that we receive from Numa's staff. As a specialty drilling contractor, we often require special products and support, and Numa always is there for us,” says Jay DeLine, SEC president and CEO.

With the casing already down the hole, a Champion 240 hammer was lowered to the bedrock and drilled 24-inch diameter holes an additional 2 feet to 5 feet. Combining the rig's on-board air with an external 1,300/150 air compressor, the hammer was supplied with 1,800 cfm/150 psi of air and rotated at 12 rpm. This, coupled with injecting a mist of water to keep the dust down, enabled SEC to efficiently drill through the bedrock at a rate of 5 feet in 12 minutes - producing an average of 10 to 12 completed holes per day.

The job site was rather confined.

During another portion of the sound barrier project, SEC developed an innovative style of drilling to tackle demanding drilling conditions. The company designed, engineered and rebuilt an old oil rig mast for use in down-hole drilling. The drill mast, which was mobilized by a 60-ton American Crawler Crane, was reconstructed with a special top-head drive unit capable of putting out 30,000 foot pounds of torque at a maximum speed of 20 rpm. The drill mast was totally self-contained and did not require the crane to operate. As the crane suspended the mast over the borehole, the top-head drive was lowered and raised via twin hydraulic cylinders mounted within the drill mast. Power for the top-head drive originated from a self-contained hydraulic power unit that enabled operation of the drill anywhere within a 100-foot radius.

This breakthrough drilling technique involved the crane maneuvering and lowering the mast over each hole to be drilled. Once the mast was secured over the hole, the hammer was lowered down through the installed casing to drill into the bedrock. Supplied with 2,000 cfm/150 psi, the hammer was able to drill 7 feet in 15 minutes.

“We have tried others hammers for drilling bedrock shafts, but none could match the versatility and speed of the Numa down-hole hammer,” says Jay Deline.

The sound barrier project in Maryland has demonstrated how down-hole hammers can produce cost-effective results in the construction industry. There are endless drilling applications in the construction market for down-hole hammers whether it is shallow, deep, vertical or horizontal. But no matter what the product or conditions, a healthy bottom line always remains the benchmark of success. That is why the ability to reduce labor costs and increase profit margins is so important in the construction industry.
ND

Share This Story

Looking for a reprint of this article?
From high-res PDFs to custom plaques, order your copy today!

Recommended Content

JOIN TODAY
to unlock your recommendations.

Already have an account? Sign In

  • geotechnical drilling rig

    6 Onsite Phrases Environmental Drillers Hate

    Here are six phrases that highlight common frustrations...
    Markets
    By: Jeff Garby
  • Wayne Nash

    Pipe Stuck? Common Causes and Solutions for Drillers

    If you have drilled for any length of time, sooner or...
    Markets
    By: Wayne Nash
  • submersible pumps, water well pumps

    Selecting and Sizing Submersible Pump Cable

    This article helps pump installers and servicers decide...
    Water Wells
    By: Bob Pelikan
You must login or register in order to post a comment.

Report Abusive Comment

Subscribe For Free!
  • eNewsletters
  • Online Registration
  • Subscription Customer Service
  • Manage My Preferences

The Driller Newscast: Coiled Tubing Drilling and the Future of Geothermal

The Driller Newscast: Coiled Tubing Drilling and the Future of Geothermal

The Driller Newscast: New York Geo Talks 2025 Conference with Hands-on Driller Education

The Driller Newscast: New York Geo Talks 2025 Conference with Hands-on Driller Education

The Driller Newscast, Episode 147: Global Geothermal Collaboration at NY-GEO 2025

The Driller Newscast, Episode 147: Global Geothermal Collaboration at NY-GEO 2025

The Driller Newscast: 21st Century Drillers | Part 1 DEMAND

The Driller Newscast: 21st Century Drillers | Part 1 DEMAND

More Videos

Sponsored Content

Sponsored Content is a special paid section where industry companies provide high quality, objective, non-commercial content around topics of interest to the The Driller audience. All Sponsored Content is supplied by the advertising company and any opinions expressed in this article are those of the author and not necessarily reflect the views of The Driller or its parent company, BNP Media. Interested in participating in our Sponsored Content section? Contact your local rep!

close
  • demo of a DM450 drilling rig during a customer factory visit
    Sponsored byGeoprobe

    Built for You: Smarter Drill Rigs, Stronger Support, Bigger Opportunities

Popular Stories

MainPhotoTwoBrothers.jpg

Two Brothers' Journey Through the Drilling Industry

Tariffs

Tariffs Shake Up the Drilling Industry

AI and Drought Concerns

AI’s Growing Thirst for Water and Power

The Driller Classifieds

COMPRESSORS

EAST WEST MACHINERY & DRILLING IS BUYING AND SELLING AIR COMPRESSORS, AIR BOOSTERS, AIR ENDS & PARTS
Company: East West Machinery

DRILL RIGS

LOOKING FOR LATE MODEL TOPHEADS & DRILLTECH D25'S
Company: Spikes’s Rig Sales

DRILL RIG PARTS

MEETING DRILLERS NEEDS AROUND THE WORLD
Company: East West Machinery

ELEVATORS

SEMCO INC. PIPE ELEVATORS
Company: Semco Inc.

GROUTERS

GROUTING EQUIPMENT - GROUT PUMPS & GROUT HOSE REELS
Company: Geo-Loop Inc.

PUMP HOISTS

SEMCO INC. - BASIC PUMP HOISTS
Company: Semco Inc.

WELL PACKERS

LANSAS PRODUCTS - INFLATABLE WELL PACKERS
Company: Vanderlans Lansas Products

WELL SCREENS

WELL SCREENS & SLOTTED PIPE
Company: Alloy Screen Works

Products

Water Quality Engineering: Physical / Chemical Treatment Processes

Water Quality Engineering: Physical / Chemical Treatment Processes

By carefully explaining both the underlying theory and the underlying mathematics, this text enables readers to fully grasp the fundamentals of physical and chemical treatment processes for water and wastewater.

See More Products

Subscribe to The Driller Newscast

Related Articles

  • Project Profile: Sound Water Supply in Saipan

    See More
  • Project Profile: Geothermal on a Grand Scale

    See More
  • Project Profile: Dewatering Daytona National Speedway

    See More
×

Dig deeper into the drilling and water supply industry!

Build your knowledge with The Driller, covering the people, equipment and technologies across drilling markets.

SIGN UP NOW
  • RESOURCES
    • Advertise
    • Contact Us
    • Directories
    • Store
    • Want More
    • Classifieds
  • SIGN UP TODAY
    • Create Account
    • eNewsletters
    • Customer Service
    • Manage Preferences
  • SERVICES
    • Marketing Services
    • Reprints
    • Market Research
    • List Rental
    • Survey/Respondent Access
  • STAY CONNECTED
    • LinkedIn
    • Facebook
    • YouTube
    • X (Twitter)
  • PRIVACY
    • PRIVACY POLICY
    • TERMS & CONDITIONS
    • DO NOT SELL MY PERSONAL INFORMATION
    • PRIVACY REQUEST
    • ACCESSIBILITY

Copyright ©2025. All Rights Reserved BNP Media.

Design, CMS, Hosting & Web Development :: ePublishing

The Driller
search
cart
facebook twitter linkedin youtube
  • Sign In
  • Create Account
  • Sign Out
  • My Account
The Driller
  • NEWS
    • Water
    • Geothermal
    • Construction
    • Environmental
    • Mining
    • All Industry News
  • CLASSIFIEDS
  • EQUIPMENT
    • Rigs & Heavy Equipment
    • Consumables
    • Pumps
    • Featured Products
  • SAFETY
  • VIDEOS
    • Newscast
    • Drill Talks
    • Ask Brock
    • Emerging Drillers
  • EDUCATION
    • Drilling Business Insights
    • Reference Desk
    • Sponsored Insights
  • SOURCEBOOK
  • EVENTS
    • Conferences & Demo Days
    • Newscast LIVE
  • SUBMIT
    • Drillers @Work
  • ABOUT
    • Contact
    • Advertise
  • SIGN UP