The Driller
  • Sign In
  • Create Account
  • Sign Out
  • My Account
  • NEWS
  • CLASSIFIEDS
  • EQUIPMENT
  • SAFETY
  • VIDEOS
  • EDUCATION
  • SOURCEBOOK
  • EVENTS
  • SUBMIT
  • ABOUT
  • SIGN UP
cart
facebook twitter linkedin youtube
  • NEWS
  • Water
  • Geothermal
  • Construction
  • Environmental
  • Mining
  • All Industry News
  • EQUIPMENT
  • Rigs & Heavy Equipment
  • Consumables
  • Pumps
  • Featured Products
  • VIDEOS
  • Newscast
  • Drill Talks
  • Ask Brock
  • Emerging Drillers
  • EDUCATION
  • Drilling Business Insights
  • Reference Desk
  • Sponsored Insights
  • EVENTS
  • Conferences & Demo Days
  • Newscast LIVE
  • SUBMIT
  • Drillers @Work
  • Driller E.G.O. Award
  • ABOUT
  • Contact
  • Advertise
The Driller
search
cart
facebook twitter linkedin youtube
  • Sign In
  • Create Account
  • Sign Out
  • My Account
The Driller
  • NEWS
    • Water
    • Geothermal
    • Construction
    • Environmental
    • Mining
    • All Industry News
  • CLASSIFIEDS
  • EQUIPMENT
    • Rigs & Heavy Equipment
    • Consumables
    • Pumps
    • Featured Products
  • SAFETY
  • VIDEOS
    • Newscast
    • Drill Talks
    • Ask Brock
    • Emerging Drillers
  • EDUCATION
    • Drilling Business Insights
    • Reference Desk
    • Sponsored Insights
  • SOURCEBOOK
  • EVENTS
    • Conferences & Demo Days
    • Newscast LIVE
  • SUBMIT
    • Drillers @Work
    • Driller E.G.O. Award
  • ABOUT
    • Contact
    • Advertise
  • SIGN UP

Rainwater Harvesting System

March 7, 2006
A project designed and built byClemson University students; they designed and installed a rainwater harvesting system that will allow for the collection of a maximum of 1,500 gallons of water at a time.

The rainwater harvesting system and cooler.


A concrete pad form with reinforcement was laid and the flume was installed before the rainwater system installed.

Nic Koontz is a Biosystems Engineering undergraduate, who has worked at Clemson University's Calhoun Field Laboratory (CFL) Sustainable Farming Project for more than two years. For his Senior Capstone Design class, he decided that he wanted to build a rainwater harvesting system for the Calhoun Fields Learning Laboratory (CFLL). He and two classmates, Hunter Hicks and Bryan Kohart, approached Dr. Geoff Zehnder with their ideas, and, shortly thereafter, began work.

Because the first water collected usually is unsuitable for the system, this first-flush device “washes” the roof by sending the first 30 gallons of water straight to the drain.

For the project, these students designed and installed a rainwater harvesting system for the CFLL building that will allow for the collection of a maximum of 1,500 gallons of water at a time. The collected water is intended to be used for the produce washtable and the irrigation of the landscape around the building. Approximately 80,000 gallons of water will come through the system in an average year. The 1,500-gallon tank is conservatively sized and can meet the intended irrigation needs through a three-week drought when utilizing drip or point irrigation.

The system has a small pump outfitted with a pressure tank, pressure switch and float switch to effectively and economically distribute the collected water to where it will be used/needed. This rainwater harvesting system helps to make the CFL more sustainable and demonstrate rainwater collection and utilization techniques for small farmers and homeowners.

For further details on the project, including complete operating instructions and a parts manual, visit www.clemson.edu/scg/sust/project_rainwater.html. ND

Side view of the 1,550-gallon polyethylene cistern.

Rainwater System Maintenance

The following is excerpted from the “Operating Instructions & Parts Manual” that the Clemson University students prepared as part of their rainwater harvesting system project at the university's Calhoun Field Laboratory:

Pump and Accessories

  1. The pump and pressure switch must be protected from wet weather. Some type of cover is suggested for these items.
  2. The water entering the pump should not exceed 90 degrees F and should not drop below 32 degrees F. A roof over the tank may need to be erected to prevent direct sunlight from raising the tank temperature drastically during the summer months.
  3. Do not run pump with the manual cistern drain valve open.
  4. When draining the tank and pressure lines for winter, the pump also must be drained through the two plugs on pump housing.
  5. The pressure switch should turn the pump on at 40 psi and off at 60 psi (use mounted pressure gauge for reference). If it fails to meet these requirements, unscrew the pressure switch cover and adjust the two nuts according to the instructions found on the underside of the switch cover.
  6. The pump, pressure switch and float switch should be hardwired as soon as possible.
  7. Periodically check diaphragm tank pre-charge pressure with a standard tire pressure gauge. The pressure should read approximately 38 psi.


Blue water well tank that reduces pumping cycles in the rainwater system.

The Cistern
  1. The tank should be cleaned regularly (skim surface with a fine mesh net to remove debris that may collect). The bottom of the tank may also need to be cleaned periodically. A regular visual inspection through the access port will determine the amount of cleaning that needs to be done.
  2. Periodically, visually inspect the float switches located on the bottom of the tank near the outlet to make sure they are secured to the cement block. If they are not secured, tie them down in a way that will turn off the pump before the water level reaches the outlet port. This is accomplished by entering the tank after it has been drained. Secure the float cords to the cement block so that the floats will float at the same level. Next hold them both vertical and mimic the action of a falling water level. There will be an audible click at roughly 20 degrees below horizontal. Adjust the height of the floats such that the click is heard before the bottom of the floats reaches the tank outlet port.
PVC Pipe
  1. Visually inspect and repair any leaks weekly.
  2. The system must be drained during freezing weather. First disconnect the power from the pump and accessories. Unscrew the drain plug located just off of the pad in the pressure line and open the hose line valve. Drain the vertical section of pipe from the pump outlet by draining the pump. The drainage lines will drain themselves.
  3. If water in bottom of flume elbow begins to alter water quality, drill small hole in bottom of flume elbow to drain out onto ground.
ND

Share This Story

Looking for a reprint of this article?
From high-res PDFs to custom plaques, order your copy today!

Recommended Content

JOIN TODAY
to unlock your recommendations.

Already have an account? Sign In

  • geotechnical drilling rig

    6 Onsite Phrases Environmental Drillers Hate

    Here are six phrases that highlight common frustrations...
    Environmental Monitoring
    By: Jeff Garby
  • Wayne Nash

    Pipe Stuck? Common Causes and Solutions for Drillers

    If you have drilled for any length of time, sooner or...
    Markets
    By: Wayne Nash
  • deep water well

    Selecting and Sizing Submersible Pump Cable

    This article helps pump installers and servicers decide...
    Equipment
    By: Bob Pelikan
You must login or register in order to post a comment.

Report Abusive Comment

Manage My Account
  • eNewsletters
  • Online Registration
  • Subscription Customer Service
  • Manage My Preferences

Environmental Works - 3135GT Testimonial

Environmental Works - 3135GT Testimonial

The Driller Newscast - The Exit Interview: The Battle of Bron vs. Brock

The Driller Newscast - The Exit Interview: The Battle of Bron vs. Brock

The Driller Newscast: Extreme Heatwaves, Drought Battles, and What the Driller's Been Up To

The Driller Newscast: Extreme Heatwaves, Drought Battles, and What the Driller's Been Up To

The Driller Newscast: Hard Hats, Hot Topics, and Dad Jokes

The Driller Newscast: Hard Hats, Hot Topics, and Dad Jokes

More Videos

Sponsored Content

Sponsored Content is a special paid section where industry companies provide high quality, objective, non-commercial content around topics of interest to the The Driller audience. All Sponsored Content is supplied by the advertising company and any opinions expressed in this article are those of the author and not necessarily reflect the views of The Driller or its parent company, BNP Media. Interested in participating in our Sponsored Content section? Contact your local rep!

close
  • Star Iron Works  sales team
    Sponsored byStar Iron Works, Inc.

    Using the Experience of Long-Term Employees to pass on Dedication, Tradition, and Legacy

  • demo of a DM450 drilling rig during a customer factory visit
    Sponsored byGeoprobe

    Built for You: Smarter Drill Rigs, Stronger Support, Bigger Opportunities

Popular Stories

self scouring plow blade

The Art of Drilling: Mastering the Unknown Below

Thermal Energy Networks

What Drillers Need to Know about Thermal Energy Network Policy in 2025

Coal Mining

Mass Layoffs Rock West Virginia Coal Industry

The Driller Classifieds

COMPRESSORS

EAST WEST MACHINERY & DRILLING IS BUYING AND SELLING AIR COMPRESSORS, AIR BOOSTERS, AIR ENDS & PARTS
Company: East West Machinery

DRILL RIGS

LOOKING FOR LATE MODEL TOPHEADS & DRILLTECH D25'S
Company: Spikes’s Rig Sales

DRILL RIG PARTS

MEETING DRILLERS NEEDS AROUND THE WORLD
Company: East West Machinery

ELEVATORS

SEMCO INC. PIPE ELEVATORS
Company: Semco Inc.

GROUTERS

GROUTING EQUIPMENT - GROUT PUMPS & GROUT HOSE REELS
Company: Geo-Loop Inc.

PUMP HOISTS

SEMCO INC. - BASIC PUMP HOISTS
Company: Semco Inc.

WELL PACKERS

LANSAS PRODUCTS - INFLATABLE WELL PACKERS
Company: Vanderlans Lansas Products

WELL SCREENS

WELL SCREENS & SLOTTED PIPE
Company: Alloy Screen Works

Products

Water Quality Engineering: Physical / Chemical Treatment Processes

Water Quality Engineering: Physical / Chemical Treatment Processes

By carefully explaining both the underlying theory and the underlying mathematics, this text enables readers to fully grasp the fundamentals of physical and chemical treatment processes for water and wastewater.

See More Products

The Driller E.G.O. Award - Enter now!

Related Articles

  • Nature Vision Creates Well Camera System

    See More
  • How Safe Is Your Water System?

    See More
  • Looking at the Whole System

    See More
×

Dig deeper into the drilling and water supply industry!

Build your knowledge with The Driller, covering the people, equipment and technologies across drilling markets.

SIGN UP NOW
  • RESOURCES
    • Advertise
    • Contact Us
    • Directories
    • Store
    • Want More
    • Classifieds
  • SIGN UP TODAY
    • Create Account
    • eNewsletters
    • Customer Service
    • Manage Preferences
  • SERVICES
    • Marketing Services
    • Reprints
    • Market Research
    • List Rental
    • Survey/Respondent Access
  • STAY CONNECTED
    • LinkedIn
    • Facebook
    • YouTube
    • X (Twitter)
  • PRIVACY
    • PRIVACY POLICY
    • TERMS & CONDITIONS
    • DO NOT SELL MY PERSONAL INFORMATION
    • PRIVACY REQUEST
    • ACCESSIBILITY

Copyright ©2025. All Rights Reserved BNP Media.

Design, CMS, Hosting & Web Development :: ePublishing

The Driller
search
cart
facebook twitter linkedin youtube
  • Sign In
  • Create Account
  • Sign Out
  • My Account
The Driller
  • NEWS
    • Water
    • Geothermal
    • Construction
    • Environmental
    • Mining
    • All Industry News
  • CLASSIFIEDS
  • EQUIPMENT
    • Rigs & Heavy Equipment
    • Consumables
    • Pumps
    • Featured Products
  • SAFETY
  • VIDEOS
    • Newscast
    • Drill Talks
    • Ask Brock
    • Emerging Drillers
  • EDUCATION
    • Drilling Business Insights
    • Reference Desk
    • Sponsored Insights
  • SOURCEBOOK
  • EVENTS
    • Conferences & Demo Days
    • Newscast LIVE
  • SUBMIT
    • Drillers @Work
    • Driller E.G.O. Award
  • ABOUT
    • Contact
    • Advertise
  • SIGN UP