The Driller
  • Sign In
  • Create Account
  • Sign Out
  • My Account
  • NEWS
  • CLASSIFIEDS
  • EQUIPMENT
  • SAFETY
  • VIDEOS
  • EDUCATION
  • SOURCEBOOK
  • EVENTS
  • SUBMIT
  • ABOUT
  • SIGN UP
cart
facebook twitter linkedin youtube
  • NEWS
  • Water
  • Geothermal
  • Construction
  • Environmental
  • Mining
  • All Industry News
  • EQUIPMENT
  • Rigs & Heavy Equipment
  • Consumables
  • Pumps
  • Featured Products
  • VIDEOS
  • Newscast
  • Drill Talks
  • Ask Brock
  • Emerging Drillers
  • EDUCATION
  • Drilling Business Insights
  • Reference Desk
  • Sponsored Insights
  • EVENTS
  • Conferences & Demo Days
  • Newscast LIVE
  • SUBMIT
  • Drillers @Work
  • ABOUT
  • Contact
  • Advertise
The Driller
search
cart
facebook twitter linkedin youtube
  • Sign In
  • Create Account
  • Sign Out
  • My Account
The Driller
  • NEWS
    • Water
    • Geothermal
    • Construction
    • Environmental
    • Mining
    • All Industry News
  • CLASSIFIEDS
  • EQUIPMENT
    • Rigs & Heavy Equipment
    • Consumables
    • Pumps
    • Featured Products
  • SAFETY
  • VIDEOS
    • Newscast
    • Drill Talks
    • Ask Brock
    • Emerging Drillers
  • EDUCATION
    • Drilling Business Insights
    • Reference Desk
    • Sponsored Insights
  • SOURCEBOOK
  • EVENTS
    • Conferences & Demo Days
    • Newscast LIVE
  • SUBMIT
    • Drillers @Work
  • ABOUT
    • Contact
    • Advertise
  • SIGN UP

Kimmes-Bauer's Customized Rig

By Greg Ettling
June 1, 2006
A Hastings, Minn.-based drilling contractor customizes a 1984 Ingersoll-Rand TH-60 rig from top to bottom. The project - start to finish - took 17 weeks, seven days a week.



If you're thinking about doing a complete rebuild on one of your drill rigs, Mike Miller has this to say: “It's extremely time-consuming; you probably will come across more headaches than you thought you would.”

Miller is a driller with Kimmes-Bauer Inc., of Hastings, Minn. In business since 1980, Miller has been with the firm for 22 years. Kimmes-Bauer, with approximately 20 employees, runs two rigs - both Ingersoll-Rand TH-60s (1981 and 1984 models). “Our bread and butter is water wells - house wells, city wells - and irrigation wells, which, primarily, are agricultural, but we've also done some ballfields.”

The Project Begins

“This was an extreme total rebuild - new everything. Last February, we took the 1984 rig down to the bare frame,” Miller explains. “To get started, we added 3 feet under the frame and put all new axles under it, making it a six-wheel drive. That alone caused some headaches, getting everything to fit between the rear-end and the mast. We had to cut 7 inches out of the cab - that's why it looks short. We had to make our own space, so it's got a low-rider cab on it now. There's probably 3 inches of clearance between the engine rear-end and the cab - not a lot of room to play with; it's pretty tight. Then we got the axles mounted on it - the front has air-ride suspension, the back is rubber-mount. It was a tandem-axle truck; now it's a quad-axle. After that, we mounted the engine, tranny and cab.

“The truck is a custom-built Peterbuilt 379 with an extender hood and a set-back front axle. Just about every part of it is custom-built. The cab is chopped and lowered. It has a 10-inch drop visor on it. The roof pan on top is wider than normal; that's so if you're working on the mast and mud drops, you're not getting it on your windshield or the side windows and mirrors.

“Then we did a bunch of upgrades on the drill rig itself,” he continues. “We rebuilt the mast, making it stronger. We added a custom-built swivel. That swivel is almost 10 years old and has the original bearings in it. We were going through swivels every two years. We now go through one-tenth the packing that we used to with the old swivel - it's definitely upgraded.”

Discussing some of the other modifications, Miller tells us, “We put hydraulic lift stands on it and a double retracting table. We had water-injection, but now it has foam-injection, too - all variable speed, so you can control it right from the panel. We also added oil-injection. We carry our foam right on the rig - we've got 70 gallons of foam and 70 gallons of rock oil - that saves a lot of refilling time. The tophead has been upgraded; the bearings in the top drive - that was done about a year after the swivel upgrade - have been performing for about eight years. We were getting 18 months or two years out of the old bearings.

“We modified the rod rack so it would hold more rods - 22. The rig has a lot more speed now. Winch speed, top head speed - everything has been increased. Our winch speed is 240 feet per minute; we can come out of the hole pretty fast.

“It's got a custom-built rod spinner on it. It's got a custom-built pipe clamp for welding joints - a single toggle switch runs the pipe clamp. I have yet to see a rod spinner that's easier to operate; it's like a second hand. It will go from 4-inch to 20-inch without doing anything. Actually, it will go down to 23⁄8-inch drill rod and up to 20-inch well casing without pulling pins, changing chucks or anything. It does it all. It's got remote control for the top-head, the air control and the winch. It's very user-friendly. The stands you stand on are nitrogen-filled, so they have some cushion to eliminate the jar to your body.”

The Small Details

“That's most of the major stuff,” Miller says. “There were a whole bunch of little things we did. Like the welded-on tape measure on the side of the mast - that comes in handy on a windy day when you're trying to hold the tape measure to set your casing at the right depth. We've got hammer holders wherever you might need a hammer. You don't have to look around - they're there. The rod spinner has two controls - one on the helper side and one on the operator side.

“The front jacks were moved from the front of the truck to the sides. They're right in front of the wheels, so we didn't gain too much in length. The jack stands have extra-wide pads, so we don't have to lay down blocks and then dig them out. The front outriggers have controllers up front on the rig. If we need to get the front end blocked up higher, we don't have to run back and forth from one end of the rig to the other. Stuff like that just makes your life easier.” It took a lot of hard work and engineering to make life easier.

“It's got custom exhaust - the truck engine exhaust and the deck engine exhaust run through the same system,” Miller continues. “The deck engine and hydraulics used to sit inside the frame rails. We raised up everything a foot and pulled it ahead 2 feet; now you can stand by the hydraulic pumps and work on them instead of having to lay on your stomach and have someone hold your feet while you try to replace a hose. It's much more user-friendly now. All the wires are in junction boxes.”

The project - start to finish - took 17 weeks, seven days a week. “The most time-consuming part was the drive train,” Miller explains. “We had to build our own front end. Nobody built a front end that was low enough for the suspension, so we decided to go with air-ride. That alone took two weeks. It took another week to mount the axles. Everything adds up when you do a total rebuild. The only thing we have left to do is add an air-greaser to grease the tool joints.” He estimates that the total bill for the customization came to about $200,000.

“She's very fast and very efficient,” Miller says with pride. “I started this morning at 9:30, and I'm down 460 feet. I'm developing it now, and I'll be done by 4:30 p.m. Other drillers who've seen it up close are in awe; they don't even know what to say. It's definitely a showpiece. We knew what we wanted for the finished product.” Miller says he called one of the manufacturers to come and check out the work done on the rig. “They were going to redesign some of their stuff. They said they'd call me back but they still haven't,” he laments.

Looking Ahead

Asked what advice he'd give to other drilling contractors thinking about doing a total rebuild, he pauses just a bit, laughs and says, “Have somebody else do it.” Pressed, he continues: “You've got to plan it out. I've built trucks before, so I wasn't surprised at some of the things we encountered. I knew it was going to be a project. The boss maybe didn't think it would be such a project; it took a little bit more time than he thought it would to get everything right. But when it is done, there's a lot of satisfaction.

“It's one thing building it in the shop; it's another thing putting it to the test. We've done about 200 wells since the rebuild was completed about a year ago. We've had no failures with anything we did, so it was done right. Production is what it's all about, and I'll put this rig up against anything else out there. I don't stand on the back of the rig thinking, 'I wish we did this or that differently.'”

That will serve Kimmes-Bauer well when it comes time to redo the 1981 rig. “That's our next project; it will go a lot faster,” Miller assures.

Share This Story

Looking for a reprint of this article?
From high-res PDFs to custom plaques, order your copy today!

Recommended Content

JOIN TODAY
to unlock your recommendations.

Already have an account? Sign In

  • geotechnical drilling rig

    6 Onsite Phrases Environmental Drillers Hate

    Here are six phrases that highlight common frustrations...
    Geotechnical Investigation
    By: Jeff Garby
  • Wayne Nash

    Pipe Stuck? Common Causes and Solutions for Drillers

    If you have drilled for any length of time, sooner or...
    Water Wells
    By: Wayne Nash
  • submersible pumps, water well pumps

    Selecting and Sizing Submersible Pump Cable

    This article helps pump installers and servicers decide...
    Opinions
    By: Bob Pelikan
You must login or register in order to post a comment.

Report Abusive Comment

Subscribe For Free!
  • eNewsletters
  • Online Registration
  • Subscription Customer Service
  • Manage My Preferences

The Driller Newscast, Episode 147: Global Geothermal Collaboration at NY-GEO 2025

The Driller Newscast, Episode 147: Global Geothermal Collaboration at NY-GEO 2025

The Driller Newscast: New York Geo Talks 2025 Conference with Hands-on Driller Education

The Driller Newscast: New York Geo Talks 2025 Conference with Hands-on Driller Education

The Driller Newscast: 21st Century Drillers | Part 1 DEMAND

The Driller Newscast: 21st Century Drillers | Part 1 DEMAND

The Driller Newscast: Coiled Tubing Drilling and the Future of Geothermal

The Driller Newscast: Coiled Tubing Drilling and the Future of Geothermal

More Videos

Sponsored Content

Sponsored Content is a special paid section where industry companies provide high quality, objective, non-commercial content around topics of interest to the The Driller audience. All Sponsored Content is supplied by the advertising company and any opinions expressed in this article are those of the author and not necessarily reflect the views of The Driller or its parent company, BNP Media. Interested in participating in our Sponsored Content section? Contact your local rep!

close
  • demo of a DM450 drilling rig during a customer factory visit
    Sponsored byGeoprobe

    Built for You: Smarter Drill Rigs, Stronger Support, Bigger Opportunities

Popular Stories

MainPhotoTwoBrothers.jpg

Two Brothers' Journey Through the Drilling Industry

Tariffs

Tariffs Shake Up the Drilling Industry

AI and Drought Concerns

AI’s Growing Thirst for Water and Power

The Driller Classifieds

COMPRESSORS

EAST WEST MACHINERY & DRILLING IS BUYING AND SELLING AIR COMPRESSORS, AIR BOOSTERS, AIR ENDS & PARTS
Company: East West Machinery

DRILL RIGS

LOOKING FOR LATE MODEL TOPHEADS & DRILLTECH D25'S
Company: Spikes’s Rig Sales

DRILL RIG PARTS

MEETING DRILLERS NEEDS AROUND THE WORLD
Company: East West Machinery

ELEVATORS

SEMCO INC. PIPE ELEVATORS
Company: Semco Inc.

GROUTERS

GROUTING EQUIPMENT - GROUT PUMPS & GROUT HOSE REELS
Company: Geo-Loop Inc.

PUMP HOISTS

SEMCO INC. - BASIC PUMP HOISTS
Company: Semco Inc.

WELL PACKERS

LANSAS PRODUCTS - INFLATABLE WELL PACKERS
Company: Vanderlans Lansas Products

WELL SCREENS

WELL SCREENS & SLOTTED PIPE
Company: Alloy Screen Works

Products

Water Quality Engineering: Physical / Chemical Treatment Processes

Water Quality Engineering: Physical / Chemical Treatment Processes

By carefully explaining both the underlying theory and the underlying mathematics, this text enables readers to fully grasp the fundamentals of physical and chemical treatment processes for water and wastewater.

See More Products

Subscribe to The Driller Newscast

Related Articles

  • Suppliers Discuss Used Rig Market

    See More
  • The Latest In Drill Rig Technology -- Part 1

    See More
  • Drill Rig Innovations - Part 2

    See More
×

Dig deeper into the drilling and water supply industry!

Build your knowledge with The Driller, covering the people, equipment and technologies across drilling markets.

SIGN UP NOW
  • RESOURCES
    • Advertise
    • Contact Us
    • Directories
    • Store
    • Want More
    • Classifieds
  • SIGN UP TODAY
    • Create Account
    • eNewsletters
    • Customer Service
    • Manage Preferences
  • SERVICES
    • Marketing Services
    • Reprints
    • Market Research
    • List Rental
    • Survey/Respondent Access
  • STAY CONNECTED
    • LinkedIn
    • Facebook
    • YouTube
    • X (Twitter)
  • PRIVACY
    • PRIVACY POLICY
    • TERMS & CONDITIONS
    • DO NOT SELL MY PERSONAL INFORMATION
    • PRIVACY REQUEST
    • ACCESSIBILITY

Copyright ©2025. All Rights Reserved BNP Media.

Design, CMS, Hosting & Web Development :: ePublishing

The Driller
search
cart
facebook twitter linkedin youtube
  • Sign In
  • Create Account
  • Sign Out
  • My Account
The Driller
  • NEWS
    • Water
    • Geothermal
    • Construction
    • Environmental
    • Mining
    • All Industry News
  • CLASSIFIEDS
  • EQUIPMENT
    • Rigs & Heavy Equipment
    • Consumables
    • Pumps
    • Featured Products
  • SAFETY
  • VIDEOS
    • Newscast
    • Drill Talks
    • Ask Brock
    • Emerging Drillers
  • EDUCATION
    • Drilling Business Insights
    • Reference Desk
    • Sponsored Insights
  • SOURCEBOOK
  • EVENTS
    • Conferences & Demo Days
    • Newscast LIVE
  • SUBMIT
    • Drillers @Work
  • ABOUT
    • Contact
    • Advertise
  • SIGN UP