search
cart
facebook twitter linkedin youtube
  • Sign In
  • Join Today
  • Sign Out
  • My Account
  • NEWS
  • WATER
  • ENERGY
    • Geothermal
    • Mining
    • Petroleum
  • CONSTRUCTION
    • Horizontal Directional Driling
    • Infrastructure
  • SAFETY
  • DRILLER STUDIOS
    • The Driller Newscast
    • Videos
    • Podcasts
      • The Newscast
      • The DRILLERcast
    • Driller or Digger?
  • VOICES
  • PRODUCTS
    • Featured Products
    • Sponsored Insights
  • CLASSIFIEDS
  • SOURCEBOOK
  • EVENTS
    • Ground2Grid
    • Conferences & Demo Days
  • ABOUT
    • Contact
    • Advertise
  • JOIN

Horrors! A Lesson Learned About Change Orders

By Gary Parent
June 1, 2006


Contractor: Shore Drilling Inc., Oceanport, N.J.

Project: Install one 40-foot,4-inch well down-gradient of contaminated gas station

Location: Northern New Jersey

Conditions: 94 degrees F, 94 percent humidity

Drilling method: Hollow-stem auger/Air-rotary DHD

We knew this would be a challenging job. We were drilling offsite in a residential neighborhood, but we had to keep as much equipment as possible 300 feet away from the gas station. We were going to drill through an unknown thickness of fill before we encountered the native cobbles and boulders. Our plan was to drill with our hollow-stem augers until we got refusal, switch to rotary (using the augers as casing), and drill to our final depth of 40 feet to set the well. Our client asked us to do this job because we had adapted our mid-size Ingersoll-Rand (now Atlas Copco) A300 to run air rotary. The rig is mounted on a Ford F700, and is small enough to tuck into the tight, wooded area where the well was to be located.

We traversed a nicely manicured lawn with plywood, pulled out some shrubs, trimmed some trees, then set up the rig carefully and drilled with our augers to 14 feet where we got refusal. We then switched to air rotary (dragging 300 feet of 2-inch air hose from the compressor to our rig) and quickly drilled to 40 feet. Everyone was excited that the job was going to work just like we planned - maybe we would even be home early. However, that was not to be.

When we tried to install the well, we discovered that the borehole had collapsed and filled in just 1 foot below our augers. We went back in through the augers with our air-rotary tools to clean out the borehole, only this time it was filled with water and mud (so now we were making a mess, too). When we stripped out of the hole the third time, we found that it had filled again (just a quick note to tell you that we use 5-foot rods on this truck, so pulling out of a 40-foot hole requires breaking eight tool joints and carrying each rod to the racks on the side of the truck (which means walking 15 feet back and forth through the mud that we just spread all over the place). We set the air-rotary tools aside and proceeded to grind, bump and smash our way down to 25 feet with our augers (this is the fourth time in the hole). We switched back to air-rotary, drilled to 40 feet and finally were able to set the well (fifth time in hole).

With the air-rotary tools and 6 inches of mud spread all over the place, we started pulling the augers and cleaning up. We put five augers in the hole and only three came back out (my augers are “Truspins,” which are about as rare and popular as Ford's Edsel, so every one lost is lost for good). At this point, I didn't care about the augers, so we simply grouted $2,500 worth of tools right in the borehole. We then began the cleanup - we still had to power-wash all the tools, creep back across the lawn on plywood, sweep, push around, slop in and hide the mud we made. Then we had to load the plywood on our support truck, roll up 300 feet of air-hose, move the compressor so it did not interfere with traffic or parking, develop the well and complete the flush mount before we left the site. Generally, once the well is set, we all relax, however, it was summertime in New Jersey - it gets dark at 9 p.m., and it had been dark for at least an hour.

The final blow was when my customer waited 45 days to call me and discuss the bill. He wanted to see if I could find a way to reduce the final cost! I was so angry, I tried to reach through the phone and grab him by the neck. Luckily, my wife was in the office, saw my face turn red and intervened before I bit off his head. I agreed to look into the invoice and see what I could do. I'm very reluctant to add additional charges to my final invoices. I generally bid jobs by including every imaginable cost and, most of the time, the final invoice is less than the initial proposal; I had done the same on this job despite its problems. However, the gloves were off now. I added the additional costs for the compressor, charged him for the lost augers, added my time, included the extra helper and overtime for the rig and crew, and a per diem, considering we all missed dinner that day. The revised invoice was bout $8,000 higher, and I included a note thanking him for the opportunity to review this invoice because I had a chance to include items I had previously missed.

My customer did authorize payment of the initial (lower) invoice. The lesson I learned from this experience was all about change orders. I should have hit the pause button and advised the customer that, after a certain point, any additional equipment, including broken tools, additional material or time would be charged over and above the proposal. This would give him the option to pull the plug and either cut his losses or authorize more money. Finally, even though I lost some equipment and money on the job, we did impress the customer with our willingness to stick with the job, no matter how difficult. And more important than that is the fact that we all went home safely at the end of the day.

Share This Story

Looking for a reprint of this article?
From high-res PDFs to custom plaques, order your copy today!

Recommended Content

JOIN TODAY
to unlock your recommendations.

Already have an account? Sign In

  • Brock Yordy speaks with a group of Geothermal Drillers

    The Road to 2050

    The geothermal exchange industry is an expanding,...
    Geothermal
    By: Brock Yordy
  • A drilling rig hitched to a pickup truck

    Stories From the Site: Some of the Wildest Things Hit While Drilling

    There are many zany things drillers encounter everyday...
    Infrastructure
    By: John Truesdale
  • Western Kansas

    EPA Turns Attention to Rural Water Challenges in Western Kansas

    Rural water systems rarely make national headlines, but...
    Water
    By: John Oldani
You must login or register in order to post a comment.

Report Abusive Comment

Manage My Account
  • Join The Driller
  • Manage My Preferences
  • Customer Service

More Videos

Sponsored Content

Sponsored Content is a special paid section where industry companies provide high quality, objective, non-commercial content around topics of interest to the The Driller audience. All Sponsored Content is supplied by the advertising company and any opinions expressed in this article are those of the author and not necessarily reflect the views of The Driller or its parent company, BNP Media. Interested in participating in our Sponsored Content section? Contact your local rep!

close
  • ClimateMaster installation in on-base housing
    Sponsored byClimateMaster

    A Driller and HVAC Professional Have a Cup of Coffee

  • 2 men with a piece of machinery
    Sponsored byGeoprobe

    One Rig Service Partner. All Brands. Less Downtime.

  • 3135GT drilling rig
    Sponsored byGeoprobe

    Driller Feedback Drives Innovation in Geotechnical & Environmental Drilling

Popular Stories

Jim Beath: A Driller's Life

The Well From Hell — A Halloween Tale from the Rig Floor

Jim Beath: A Driller's Life

The Well From Hell — A Halloween Tale from the Rig Floor

A broken gas pipeline surrounded by traffic cones

Are We Developing Thermal Energy Infrastructure While the Grid Dies? The Case for Immediate Deployment

The DRILLER logo CLASSIFIEDS

COMPRESSORS

EAST WEST MACHINERY & DRILLING IS BUYING AND SELLING AIR COMPRESSORS, AIR BOOSTERS, AIR ENDS & PARTS
Company: East West Machinery

DRILL RIGS

LOOKING FOR LATE MODEL TOPHEADS & DRILLTECH D25'S
Company: Spikes’s Rig Sales

DRILL RIG PARTS

MEETING DRILLERS NEEDS AROUND THE WORLD
Company: East West Machinery

ELEVATORS

SEMCO INC. PIPE ELEVATORS
Company: Semco Inc.

GROUTERS

GROUTING EQUIPMENT - GROUT PUMPS & GROUT HOSE REELS
Company: Geo-Loop Inc.

PUMP HOISTS

SEMCO INC. - BASIC PUMP HOISTS
Company: Semco Inc.

WELL PACKERS

LANSAS PRODUCTS - INFLATABLE WELL PACKERS
Company: Vanderlans Lansas Products

WELL SCREENS

WELL SCREENS & SLOTTED PIPE
Company: Alloy Screen Works

Events

June 15, 2027

Ground2Grid Thermal Energy Summit

Ground2Grid logoGround2Grid is a new, national event hosted by The Driller where the full lifecycle of Thermal Energy Resources comes together. From the subsurface to the final system connection, this summit brings builders, policymakers, engineers, and investors into one collaborative space to accelerate the future of carbon-neutral heating and cooling.
View All Submit An Event

Products

Water Quality Engineering: Physical / Chemical Treatment Processes

By carefully explaining both the underlying theory and the underlying mathematics, this text enables readers to fully grasp the fundamentals of physical and chemical treatment processes for water and wastewater.

See More Products
×

Dig deeper into the drilling and water supply industry!

Build your knowledge with The Driller, covering the people, equipment and technologies across drilling markets.

JOIN NOW
  • RESOURCES
    • Advertise
    • Contact Us
    • Directories
    • Store
    • Want More
    • Classifieds
  • JOIN TODAY
    • Create Account
    • Newsletters
    • Customer Service
    • Manage Preferences
  • SERVICES
    • Marketing Services
    • Reprints
    • Market Research
    • List Rental
    • Survey/Respondent Access
  • STAY CONNECTED
    • LinkedIn
    • Facebook
    • YouTube
    • X (Twitter)
  • PRIVACY
    • PRIVACY POLICY
    • TERMS & CONDITIONS
    • DO NOT SELL MY PERSONAL INFORMATION
    • PRIVACY REQUEST
    • ACCESSIBILITY

Copyright ©2026. All Rights Reserved BNP Media, Inc. and BNP Media II, LLC.

Design, CMS, Hosting & Web Development :: ePublishing