The Driller
  • Sign In
  • Create Account
  • Sign Out
  • My Account
  • NEWS
  • CLASSIFIEDS
  • EQUIPMENT
  • SAFETY
  • VIDEOS
  • EDUCATION
  • SOURCEBOOK
  • EVENTS
  • SUBMIT
  • ABOUT
  • SIGN UP
cart
facebook twitter linkedin youtube
  • NEWS
  • Water
  • Geothermal
  • Construction
  • Environmental
  • Mining
  • All Industry News
  • EQUIPMENT
  • Rigs & Heavy Equipment
  • Consumables
  • Pumps
  • Featured Products
  • VIDEOS
  • Newscast
  • Drill Talks
  • Ask Brock
  • Emerging Drillers
  • EDUCATION
  • Drilling Business Insights
  • Reference Desk
  • Sponsored Insights
  • EVENTS
  • Conferences & Demo Days
  • Newscast LIVE
  • SUBMIT
  • Drillers @Work
  • ABOUT
  • Contact
  • Advertise
The Driller
search
cart
facebook twitter linkedin youtube
  • Sign In
  • Create Account
  • Sign Out
  • My Account
The Driller
  • NEWS
    • Water
    • Geothermal
    • Construction
    • Environmental
    • Mining
    • All Industry News
  • CLASSIFIEDS
  • EQUIPMENT
    • Rigs & Heavy Equipment
    • Consumables
    • Pumps
    • Featured Products
  • SAFETY
  • VIDEOS
    • Newscast
    • Drill Talks
    • Ask Brock
    • Emerging Drillers
  • EDUCATION
    • Drilling Business Insights
    • Reference Desk
    • Sponsored Insights
  • SOURCEBOOK
  • EVENTS
    • Conferences & Demo Days
    • Newscast LIVE
  • SUBMIT
    • Drillers @Work
  • ABOUT
    • Contact
    • Advertise
  • SIGN UP

Underwater Drilled Shafts

August 1, 2007


Because they can be installed in virtually any soil type, can support large axial and lateral loads on a single member, and provide the most economical foundation type for most situations, drilled shafts are the most commonly utilized bridge foundation.

On some projects, excavation of drilled shafts encounters no soft soils or ground water. In these shafts, concrete is placed “in the dry” – that is, without the need to displace water or drilling slurry. Placing concrete in this type of shaft is similar to placing concrete in a column form, and it does not require specialized methods or equipment.

However, a considerable number of drilled shafts require either drilling slurry to stabilize the excavation or encounter enough ground water that the shaft excavation cannot be dewatered. For these shafts, the concrete is placed using slurry displacement or underwater placement. These shafts do require specific methods and equipment.

Stabilizng Slurry

Drilling slurry stabilizes the drilled shaft excavation in soft soils or when ground water is present. The most common drilling slurry is mineral slurry consisting of commercial bentonite clay mixed with water. Mineral slurry offers a combination of higher-than-water specific gravity to offset hydrostatic pressure, and it deposits clay particles on the excavation walls (filter cake) to help stabilize them. During excavation, the main function of the slurry is to maintain hole stability. During placement of the concrete, however, the slurry must displace cleanly from the hole and not leave the reinforcing steel or sides of the hole coated. Before placement of the concrete, slurry should be sampled from the bottom of the hole with a device known as a “thief.” Then the slurry is tested for specific gravity, viscosity and sand content. These three tests show the amount of suspended soil particles in the slurry, and how easily the slurry will be displaced during the concrete pour. Determining the amount of suspended solids is important, as these materials will thicken the slurry and actually may settle out of it before and during the concrete pour. Excessive amounts of particles, especially sand, can leave deposits against the sides and bottom of the shaft and along the reinforcing steel.

If slurry sampled from the bottom of the hole does not meet specific requirements, pump slurry from the bottom of the hole, replacing it with fresh slurry introduced at the top, until the slurry meets the necessary requirements.

Polymer Slurry

The use of polymer slurry has increased in recent years. Although it offers advantages over mineral slurry in specific situations, it does not offer the same stabilizing properties in many others. For instance, polymer slurry has a slightly lower specific gravity than water and, therefore, does not have the same ability to offset hydrostatic pressure as mineral slurry. After allowing polymer slurry for several years, the Texas Department of Transportation reported examples of settlement of several bridge structures founded on drilled shafts that used polymer slurry. On these projects, polymer slurry was used in conditions incompatible with the slurry, leading to severe soil disturbance and defects within the shafts.

Concrete Placement

Three issues are critical to the placement of concrete under water or slurry:

  • A delivery method must be used that keeps the concrete separated from the water or slurry and prevents intermixing.

  • The concrete must maintain a high slump to completely fill the shaft and flow easily around the reinforcing steel.

  • The top of the shaft must be thoroughly flushed at completion of the pour.
The Delivery – Concrete placed under water or slurry must be placed through a closed, sealed tremie or with a pump. At the start of the pour, some means must be provided to separate the concrete from the water or slurry. Most commonly, the open tremie is inserted to the bottom of the excavation and allowed to fill with water or slurry. A foam rubber plug, usually called a “pig,” is placed in the top of the tremie pipe before the hopper is filled with concrete. As concrete enters the tremie pipe, the pig slides down, separating the concrete from the water or slurry. Once the tremie pipe and hopper are full of concrete, lifting the tremie pipe slightly allows the pig to be expelled, and concrete begins flowing into the shaft. Concrete with the correct slump often will flow up the sides of the tremie a considerable distance (10-20 ft.) while the hopper is recharged with concrete as needed. Once the flow slows or stops, the tremie is lifted to restart the flow. It is critically important that the trremie remain well embedded in the concrete. Five feet of embedment should be maintained as a minimum at all times. This can be checked using a weighted tape to determine the level of concrete within the shaft, and then calculating tremie embedment based on the measured length of the tremie. Failure to maintain tremie embedment will trap the soil cuttings, sediment and washed-out concrete in the shaft. In a correct pour, these materials remain on top of the concrete, and are flushed off at the top of the shaft at the end of the pour.

Pumped concrete is placed in a similar manner. The concrete and water must be prevented from mixing at the start of the pour, and a foam rubber plug often is used in the pump line as a separator. Additionally, embedment of the pump line into the concrete is critical throughout the pour.

Concrete Slump – Using a high-slump concrete and maintaining slump during the pour are keys to a quality drilled shaft. For underwater placement of drilled shafts, the slump should be too high rather than too low. Low-slump concrete will not flow out through the tremie and around reinforcing steel in the manner necessary to achieve a quality shaft. Many exposed shafts poured with low-slump concrete have honeycombing outside the reinforcing steel cage, or, in some cases, they have no concrete at all. Drilled shaft concrete should have a slump of 8 inches, with a maximum of 9 inches allowed.

Retention of slump throughout the concrete pour also is important. Adequate retarder must be included in the concrete to retain workable slump throughout the duration of the pour. Inadequate retardation can cause the upper portion of the concrete to stiffen as it begins to set during the pour. If this occurs, the tremie must be raised very near the surface (or out) of the concrete to restore flow. When this happens, the concrete actually flows up alongside the tremie and over the top of the stiffened concrete, including cuttings, sediment and diluted concrete. This may happen several times during a lengthy pour if slump is not maintained. Concrete used for underwater pours should maintain a 4-inch slump for the duration of concrete placement, including extraction of casing if it used.

Completing the Pour – During an underwater pour, cuttings, sediments and diluted concrete are carried to the top of the concrete column as it is being placed. As the pour is completed, all loose material and contaminated concrete should be flushed off the top of the shaft. In some cases a cubic yard or more of concrete will be wasted to assure that all contaminated material is removed. The top of the shaft should be strongly flushed while concrete is being placed through the tremie or pump at the same rate as the rest of the pour. Attempting to dip or shovel this material off the shaft often leaves behind inclusions and low-quality concrete.
ND



This article is provided through the courtesy of the Texas Department of Transportation.

Share This Story

Looking for a reprint of this article?
From high-res PDFs to custom plaques, order your copy today!

Recommended Content

JOIN TODAY
to unlock your recommendations.

Already have an account? Sign In

  • geotechnical drilling rig

    6 Onsite Phrases Environmental Drillers Hate

    Here are six phrases that highlight common frustrations...
    Geotechnical Investigation
    By: Jeff Garby
  • Wayne Nash

    Pipe Stuck? Common Causes and Solutions for Drillers

    If you have drilled for any length of time, sooner or...
    World According to Wayne
    By: Wayne Nash
  • submersible pumps, water well pumps

    Selecting and Sizing Submersible Pump Cable

    This article helps pump installers and servicers decide...
    Opinions
    By: Bob Pelikan
You must login or register in order to post a comment.

Report Abusive Comment

Subscribe For Free!
  • eNewsletters
  • Online Registration
  • Subscription Customer Service
  • Manage My Preferences

The Driller Newscast, Episode 147: Global Geothermal Collaboration at NY-GEO 2025

The Driller Newscast, Episode 147: Global Geothermal Collaboration at NY-GEO 2025

The Driller Newscast: 21st Century Drillers | Part 1 DEMAND

The Driller Newscast: 21st Century Drillers | Part 1 DEMAND

The Driller Newscast: New York Geo Talks 2025 Conference with Hands-on Driller Education

The Driller Newscast: New York Geo Talks 2025 Conference with Hands-on Driller Education

The Driller Newscast: Coiled Tubing Drilling and the Future of Geothermal

The Driller Newscast: Coiled Tubing Drilling and the Future of Geothermal

More Videos

Sponsored Content

Sponsored Content is a special paid section where industry companies provide high quality, objective, non-commercial content around topics of interest to the The Driller audience. All Sponsored Content is supplied by the advertising company and any opinions expressed in this article are those of the author and not necessarily reflect the views of The Driller or its parent company, BNP Media. Interested in participating in our Sponsored Content section? Contact your local rep!

close
  • demo of a DM450 drilling rig during a customer factory visit
    Sponsored byGeoprobe

    Built for You: Smarter Drill Rigs, Stronger Support, Bigger Opportunities

Popular Stories

MainPhotoTwoBrothers.jpg

Two Brothers' Journey Through the Drilling Industry

demo of a DM450 drilling rig during a customer factory visit

Built for You: Smarter Drill Rigs, Stronger Support, Bigger Opportunities

AI and Drought Concerns

AI’s Growing Thirst for Water and Power

The Driller Classifieds

COMPRESSORS

EAST WEST MACHINERY & DRILLING IS BUYING AND SELLING AIR COMPRESSORS, AIR BOOSTERS, AIR ENDS & PARTS
Company: East West Machinery

DRILL RIGS

LOOKING FOR LATE MODEL TOPHEADS & DRILLTECH D25'S
Company: Spikes’s Rig Sales

DRILL RIG PARTS

MEETING DRILLERS NEEDS AROUND THE WORLD
Company: East West Machinery

ELEVATORS

SEMCO INC. PIPE ELEVATORS
Company: Semco Inc.

GROUTERS

GROUTING EQUIPMENT - GROUT PUMPS & GROUT HOSE REELS
Company: Geo-Loop Inc.

PUMP HOISTS

SEMCO INC. - BASIC PUMP HOISTS
Company: Semco Inc.

WELL PACKERS

LANSAS PRODUCTS - INFLATABLE WELL PACKERS
Company: Vanderlans Lansas Products

WELL SCREENS

WELL SCREENS & SLOTTED PIPE
Company: Alloy Screen Works

Products

Water Quality Engineering: Physical / Chemical Treatment Processes

Water Quality Engineering: Physical / Chemical Treatment Processes

By carefully explaining both the underlying theory and the underlying mathematics, this text enables readers to fully grasp the fundamentals of physical and chemical treatment processes for water and wastewater.

See More Products

Subscribe to The Driller Newscast

Related Articles

  • Drilled Shafts 101

    See More
  • Non-residential Projects: 500 Drilled Shafts

    See More
  • Remediation of Drilled Shafts - Part 2: Grouting

    See More
×

Dig deeper into the drilling and water supply industry!

Build your knowledge with The Driller, covering the people, equipment and technologies across drilling markets.

SIGN UP NOW
  • RESOURCES
    • Advertise
    • Contact Us
    • Directories
    • Store
    • Want More
    • Classifieds
  • SIGN UP TODAY
    • Create Account
    • eNewsletters
    • Customer Service
    • Manage Preferences
  • SERVICES
    • Marketing Services
    • Reprints
    • Market Research
    • List Rental
    • Survey/Respondent Access
  • STAY CONNECTED
    • LinkedIn
    • Facebook
    • YouTube
    • X (Twitter)
  • PRIVACY
    • PRIVACY POLICY
    • TERMS & CONDITIONS
    • DO NOT SELL MY PERSONAL INFORMATION
    • PRIVACY REQUEST
    • ACCESSIBILITY

Copyright ©2025. All Rights Reserved BNP Media.

Design, CMS, Hosting & Web Development :: ePublishing

The Driller
search
cart
facebook twitter linkedin youtube
  • Sign In
  • Create Account
  • Sign Out
  • My Account
The Driller
  • NEWS
    • Water
    • Geothermal
    • Construction
    • Environmental
    • Mining
    • All Industry News
  • CLASSIFIEDS
  • EQUIPMENT
    • Rigs & Heavy Equipment
    • Consumables
    • Pumps
    • Featured Products
  • SAFETY
  • VIDEOS
    • Newscast
    • Drill Talks
    • Ask Brock
    • Emerging Drillers
  • EDUCATION
    • Drilling Business Insights
    • Reference Desk
    • Sponsored Insights
  • SOURCEBOOK
  • EVENTS
    • Conferences & Demo Days
    • Newscast LIVE
  • SUBMIT
    • Drillers @Work
  • ABOUT
    • Contact
    • Advertise
  • SIGN UP