The Driller
  • Sign In
  • Create Account
  • Sign Out
  • My Account
  • NEWS
  • CLASSIFIEDS
  • EQUIPMENT
  • SAFETY
  • VIDEOS
  • EDUCATION
  • SOURCEBOOK
  • EVENTS
  • SUBMIT
  • ABOUT
  • SIGN UP
cart
facebook twitter linkedin youtube
  • NEWS
  • Water
  • Geothermal
  • Construction
  • Environmental
  • Mining
  • All Industry News
  • EQUIPMENT
  • Rigs & Heavy Equipment
  • Consumables
  • Pumps
  • Featured Products
  • VIDEOS
  • Newscast
  • Drill Talks
  • Ask Brock
  • Emerging Drillers
  • EDUCATION
  • Drilling Business Insights
  • Reference Desk
  • Sponsored Insights
  • EVENTS
  • Conferences & Demo Days
  • Newscast LIVE
  • SUBMIT
  • Drillers @Work
  • ABOUT
  • Contact
  • Advertise
The Driller
search
cart
facebook twitter linkedin youtube
  • Sign In
  • Create Account
  • Sign Out
  • My Account
The Driller
  • NEWS
    • Water
    • Geothermal
    • Construction
    • Environmental
    • Mining
    • All Industry News
  • CLASSIFIEDS
  • EQUIPMENT
    • Rigs & Heavy Equipment
    • Consumables
    • Pumps
    • Featured Products
  • SAFETY
  • VIDEOS
    • Newscast
    • Drill Talks
    • Ask Brock
    • Emerging Drillers
  • EDUCATION
    • Drilling Business Insights
    • Reference Desk
    • Sponsored Insights
  • SOURCEBOOK
  • EVENTS
    • Conferences & Demo Days
    • Newscast LIVE
  • SUBMIT
    • Drillers @Work
  • ABOUT
    • Contact
    • Advertise
  • SIGN UP

Monitoring Well Design Components

December 1, 2006
The installation of ground water monitoring wells at wastewater treatment facilities may be essential when such facilities have the potential for degrading the area’s ground water quality.


Wastewater treatment plants can pose a significant threat to local ground water.


The installation of ground water monitoring wells at wastewater treatment facilities may be essential when such facilities have the potential for degrading the area’s ground water quality. Discharge to ground water at these facilities is caused by seepage or direct discharge of effluent through the soil profile. The necessity for monitoring wells and/or ground water discharge plans is based on a number of factors, including the soil type, depth to ground water, strength of the waste, mobility of the waste, and general quality of the ground water. If the potential for ground water degradation is high, monitoring wells are necessary to ensure that these discharges are not degrading the ground water quality beyond the ground water quality standards, especially when they are in close proximity to water supplies and other facilities that can be impacted by ground water contamination.


Location and Number

A minimum of three monitoring wells must be installed to determine ground water flow direction. One well should be located in an area upgradient of the facility, with two located downgradient. However, the number of monitoring wells also will depend on the size of the facility. The downgradient wells should not be spaced more than 500 feet apart, and should not be located more than 200 feet outside of the site perimeter.


Diameter

Monitoring wells can be constructed of casing and screen materials that are a minimum of 2 inches inside diameter. The borehole into which the monitoring well is to be installed should be a minimum of 4 inches greater in diameter than the casing (i.e., a 2-inch well must be installed in a 6-inch borehole).


Casing and Screen Material

If PVC is selected for well construction, only those materials that meet or exceed the National Sanitation Foundation (NSF) Standard 14 must be used. Rigid PVC materials used for casing and well screen that meet or exceed NSF Standard 14 essentially are free of plasticizers. All casing and screen must be supplied with threaded flush joints or threaded couplers, PVC casing and screen must not have glue joints. The well casing should extend 2 feet above the ground surface when the well is completed.


There are various methods of well development.

Length, Depth and Packing

The monitoring well(s) must be drilled to a depth that will monitor the first water encountered. The well screen should extend 5 feet to 15 feet into the water table, with sufficient screen above the water table to detect any substances less dense than water. The well screen length should be based on water table fluctuations and other site conditions (such as confining layers). The well screen must be installed into a stable borehole. If the borehole tends to cave in or “blowout,” steps must be taken to stabilize the hole prior to screen installation.

The screen gravel-pack must be composed of pre-washed, uniform (graded) quartz sand. The size of the gravel-pack chosen must be compatible with the slot size of the well screen. For natural-packed wells (no gravel-pack), where relatively homogeneous, coarse materials predominate, the screen slot size must be compatible with the formation.

Placement of the gravel-pack should be done carefully to avoid bridging in the borehole and to allow uniform settling around the screen. A tremie pipe can be used to guide the sand to the bottom of the hole and around the screen. If the well is shallow, the sand can be poured from the surface. The gravel pack must extend a minimum of 1 foot to 2 feet above the top of the screen. Field measurements should be taken to confirm the gravel-pack has reached this level prior to grouting.


Monitoring wells are key to subsurface environmental sampling to determine the presence and extent of any contamination.

Sealing Procedures

The seal used directly above the gravel-pack should be of bentonite – in the pelletized form. Enough pelletized bentonite should be added so that a seal 2 feet thick is formed directly above the gravel-pack. If no water is present in the borehole where the pellets were installed, water from a potable source must be added to fully expand the pellets. If it is not possible to install the bentonite seal as described above, an alternate procedure of installing the seal via tremie pipe may be used. The seal must be composed of pure bentonite and mixed with potable water. The bentonite mixture should be thick enough to provide an adequate seal while remaining pliable enough to be pumped.

The annular space remaining above the seal must be grouted. The grout mixture should be composed of Portland cement and powdered bentonite. The grout mixture proportions must be 6 gallons of water to one 94-pound sack of cement. Two pounds of powdered bentonite should be added per sack of cement to control grout shrinkage. The grout must be thoroughly mixed until a consistent slurry is reached throughout. Under no circumstances should the grout be added to the well annulus dry.

Grout must be injected via tremie pipe immediately above the bentonite seal that was placed above the well screen. All hoses, pipes, tubes, water swivels, drill rods or passageways through which the grout is to be pumped should have an inside diameter of at least 0.5 inches. Grout injection must continue until clean grout reaches the ground surface. The well must not be disturbed for at least 48 hours after grouting to allow the grout time to set up.


Downgradient wells should not be spaced more than 500 feet apart.

Well Development

All monitoring wells must be developed to produce representative formation water. Representative formation water is assumed to have been obtained when pH, temperature and conductivity readings are stable, the water is turbid-free, and the minimum periods of development have been reached.

Submersible pumps include centrifugal or positive displacement-type pumps, which are operated under submergence. If a submersible pump is utilized for well development, it must be of a type and capacity such that it can pump water from the well continuously for a period of at least five minutes without shutting off. Backpressure or other methods may be utilized to accomplish the desired pumping rate. The pump must be capable of being turned off and on instantaneously to create a surge in the well. When using a submersible pump, it is recommended the well be developed for a minimum of four hours.

A bladder or diaphragm pump is the type of pump that operates under the cycling of compressed air. The compressed air cycling inflates and deflates a diaphragm, which creates a pumping action. Bladder pumps capable of well development must pump a minimum of 2 gallons per minute continuously when installed in the well. Development with a bladder pump should be done for a minimum of eight hours.


A jet pump utilizes the Venturi principle to create sub-atmospheric pressure, which allows a suction pump to be utilized below a depth at which suction alone would not normally lift water. Jet pumps capable of well development must pump a minimum of 3 gallons per minute continuously when installed in the well. The recommended development time with a jet pump is four hours.

Suction pumps cannot be used in deeper than 25 feet. Suction pumps used to develop wells less than 25 feet deep must be capable of pumping at least 5 gallons per minute continuously without pumping the well dry in less than five minutes. The recommended minimum development time with a suction pump is four hours.

Bailers used in well development must be constructed of Teflon, stainless steel or PVC. Bailers must have a lower check valve, and be lowered into the well with non-water-absorbing cable. Wells developed using a bailer must be bailed until a turbid-free discharge is attained. If the well has insufficient recharge to permit continuous bailing, then the well should be bailed dry and allowed to fully recharge. This cycle should be repeated five times or until a turbid-free discharge is attained.

Compressed air supplied by an engine-driven compressor equipped with an oil trap may be used, provided the source of compressed air is capable of evacuating 50 percent of the water column from the well once every minute. The recommended well development time for compressed air is four hours, with cycling at two-minute intervals.




Security

All monitoring wells must be fitted with an outer protective casing. This protective casing must be constructed of steel, and be supplied with a steel locking cap. The steel casing must be securely set in cement and should extend a minimum of 2 inches above the top of the monitoring well casing. As additional protection, it is recommended that three posts be installed around each monitoring well. The posts should be constructed of 5-inch steel casing, and extend a minimum of 2 feet into the ground with 3 feet above ground. Each post should be filled and grouted in place with concrete.

ND

This article is provided through the courtesy of the South Dakota Department of Environment & Natural Resources.

Share This Story

Looking for a reprint of this article?
From high-res PDFs to custom plaques, order your copy today!

Recommended Content

JOIN TODAY
to unlock your recommendations.

Already have an account? Sign In

  • geotechnical drilling rig

    6 Onsite Phrases Environmental Drillers Hate

    Here are six phrases that highlight common frustrations...
    Geotechnical Investigation
    By: Jeff Garby
  • Wayne Nash

    Pipe Stuck? Common Causes and Solutions for Drillers

    If you have drilled for any length of time, sooner or...
    Water Wells
    By: Wayne Nash
  • submersible pumps, water well pumps

    Selecting and Sizing Submersible Pump Cable

    This article helps pump installers and servicers decide...
    Pumps
    By: Bob Pelikan
You must login or register in order to post a comment.

Report Abusive Comment

Subscribe For Free!
  • eNewsletters
  • Online Registration
  • Subscription Customer Service
  • Manage My Preferences

The Driller Newscast: New York Geo Talks 2025 Conference with Hands-on Driller Education

The Driller Newscast: New York Geo Talks 2025 Conference with Hands-on Driller Education

The Driller Newscast: Coiled Tubing Drilling and the Future of Geothermal

The Driller Newscast: Coiled Tubing Drilling and the Future of Geothermal

The Driller Newscast, Episode 147: Global Geothermal Collaboration at NY-GEO 2025

The Driller Newscast, Episode 147: Global Geothermal Collaboration at NY-GEO 2025

The Driller Newscast: 21st Century Drillers | Part 1 DEMAND

The Driller Newscast: 21st Century Drillers | Part 1 DEMAND

More Videos

Sponsored Content

Sponsored Content is a special paid section where industry companies provide high quality, objective, non-commercial content around topics of interest to the The Driller audience. All Sponsored Content is supplied by the advertising company and any opinions expressed in this article are those of the author and not necessarily reflect the views of The Driller or its parent company, BNP Media. Interested in participating in our Sponsored Content section? Contact your local rep!

close
  • demo of a DM450 drilling rig during a customer factory visit
    Sponsored byGeoprobe

    Built for You: Smarter Drill Rigs, Stronger Support, Bigger Opportunities

Popular Stories

MainPhotoTwoBrothers.jpg

Two Brothers' Journey Through the Drilling Industry

Tariffs

Tariffs Shake Up the Drilling Industry

AI and Drought Concerns

AI’s Growing Thirst for Water and Power

The Driller Classifieds

COMPRESSORS

EAST WEST MACHINERY & DRILLING IS BUYING AND SELLING AIR COMPRESSORS, AIR BOOSTERS, AIR ENDS & PARTS
Company: East West Machinery

DRILL RIGS

LOOKING FOR LATE MODEL TOPHEADS & DRILLTECH D25'S
Company: Spikes’s Rig Sales

DRILL RIG PARTS

MEETING DRILLERS NEEDS AROUND THE WORLD
Company: East West Machinery

ELEVATORS

SEMCO INC. PIPE ELEVATORS
Company: Semco Inc.

GROUTERS

GROUTING EQUIPMENT - GROUT PUMPS & GROUT HOSE REELS
Company: Geo-Loop Inc.

PUMP HOISTS

SEMCO INC. - BASIC PUMP HOISTS
Company: Semco Inc.

WELL PACKERS

LANSAS PRODUCTS - INFLATABLE WELL PACKERS
Company: Vanderlans Lansas Products

WELL SCREENS

WELL SCREENS & SLOTTED PIPE
Company: Alloy Screen Works

Products

Water Quality Engineering: Physical / Chemical Treatment Processes

Water Quality Engineering: Physical / Chemical Treatment Processes

By carefully explaining both the underlying theory and the underlying mathematics, this text enables readers to fully grasp the fundamentals of physical and chemical treatment processes for water and wastewater.

See More Products

Subscribe to The Driller Newscast

Related Articles

  • Monitoring Well Intake Design

    See More
  • Monitoring Well Network

    See More
  • Do Monitoring Wells Monitor Well? - Part II

    See More
×

Dig deeper into the drilling and water supply industry!

Build your knowledge with The Driller, covering the people, equipment and technologies across drilling markets.

SIGN UP NOW
  • RESOURCES
    • Advertise
    • Contact Us
    • Directories
    • Store
    • Want More
    • Classifieds
  • SIGN UP TODAY
    • Create Account
    • eNewsletters
    • Customer Service
    • Manage Preferences
  • SERVICES
    • Marketing Services
    • Reprints
    • Market Research
    • List Rental
    • Survey/Respondent Access
  • STAY CONNECTED
    • LinkedIn
    • Facebook
    • YouTube
    • X (Twitter)
  • PRIVACY
    • PRIVACY POLICY
    • TERMS & CONDITIONS
    • DO NOT SELL MY PERSONAL INFORMATION
    • PRIVACY REQUEST
    • ACCESSIBILITY

Copyright ©2025. All Rights Reserved BNP Media.

Design, CMS, Hosting & Web Development :: ePublishing

The Driller
search
cart
facebook twitter linkedin youtube
  • Sign In
  • Create Account
  • Sign Out
  • My Account
The Driller
  • NEWS
    • Water
    • Geothermal
    • Construction
    • Environmental
    • Mining
    • All Industry News
  • CLASSIFIEDS
  • EQUIPMENT
    • Rigs & Heavy Equipment
    • Consumables
    • Pumps
    • Featured Products
  • SAFETY
  • VIDEOS
    • Newscast
    • Drill Talks
    • Ask Brock
    • Emerging Drillers
  • EDUCATION
    • Drilling Business Insights
    • Reference Desk
    • Sponsored Insights
  • SOURCEBOOK
  • EVENTS
    • Conferences & Demo Days
    • Newscast LIVE
  • SUBMIT
    • Drillers @Work
  • ABOUT
    • Contact
    • Advertise
  • SIGN UP