The Driller
  • Sign In
  • Create Account
  • Sign Out
  • My Account
  • NEWS
  • CLASSIFIEDS
  • EQUIPMENT
  • SAFETY
  • VIDEOS
  • EDUCATION
  • SOURCEBOOK
  • EVENTS
  • SUBMIT
  • ABOUT
  • SIGN UP
cart
facebook twitter linkedin youtube
  • NEWS
  • Water
  • Geothermal
  • Construction
  • Environmental
  • Mining
  • All Industry News
  • EQUIPMENT
  • Rigs & Heavy Equipment
  • Consumables
  • Pumps
  • Featured Products
  • VIDEOS
  • Newscast
  • Drill Talks
  • Ask Brock
  • Emerging Drillers
  • EDUCATION
  • Drilling Business Insights
  • Reference Desk
  • Sponsored Insights
  • EVENTS
  • Conferences & Demo Days
  • Newscast LIVE
  • SUBMIT
  • Drillers @Work
  • ABOUT
  • Contact
  • Advertise
The Driller
search
cart
facebook twitter linkedin youtube
  • Sign In
  • Create Account
  • Sign Out
  • My Account
The Driller
  • NEWS
    • Water
    • Geothermal
    • Construction
    • Environmental
    • Mining
    • All Industry News
  • CLASSIFIEDS
  • EQUIPMENT
    • Rigs & Heavy Equipment
    • Consumables
    • Pumps
    • Featured Products
  • SAFETY
  • VIDEOS
    • Newscast
    • Drill Talks
    • Ask Brock
    • Emerging Drillers
  • EDUCATION
    • Drilling Business Insights
    • Reference Desk
    • Sponsored Insights
  • SOURCEBOOK
  • EVENTS
    • Conferences & Demo Days
    • Newscast LIVE
  • SUBMIT
    • Drillers @Work
  • ABOUT
    • Contact
    • Advertise
  • SIGN UP

On Land and at Sea

June 1, 2004
This project profile involves drilling piles for a sea-wall to protect a coastline.

For thousands of years, the North Sea has pounded the coastline of Scarborough, England, to carve out some of the most dramatic seashore in the world. The constant battering requires these areas to have extensive sea walls in order to prevent major erosion and loss of existing infrastructure. Such is the case in Scarborough, where the sea walls protecting the Castle Headlands and Harbour are coming to the end of their useful life and are in need of repair to ensure protection for years to come.

The Scarborough Borough Council recently approved the completion of a $40 million sea wall rebuilding campaign in order to protect its important coastline. The project will safeguard a 11⁄4-mile stretch of coastline along the The Holms, Castle Headlands and East Pier region, and is scheduled to take up to two years to complete. The contract for this task was awarded to Edmund Nuttall Limited and consultant High Point Rendell who have assigned all drilling for the project to Ritchies Equipment Ltd.

The project calls for installation of up to 308,560 tons of granite rocks from Norway, weighing up to 22 tons each, to build rock armor protection around The Holms, Castle Headland and East Pier. Pre-cast interlocking concrete blocks called Acropodes will also be used on Castle Headland and East Pier. These installations will require the drilling of 605 34-inch piles into the seabed to a depth of 9 feet to 15 feet in medium sandstone and mudstone. Of these 605 holes, 240 will be drilled on the beach at low tide with the remaining 355 completed at sea.

Numa's distributor, H&F Drilling, and Numa regional manager, Chris Beare, have been instrumental with the support of this drilling project by providing great insight into the products and methods being used. Both have played a critical role in designing complete drill strings for the land- and water-based drilling operations. Similar in both set-ups is the use of Numa Champion 240 hammers and 34-inch bits in order to provide the necessary combination of speed and performance.

The Champion 240 hammer is shrouded with a split sleeve to facilitate hammer disassembly with a large Scorpion unit available on site. The remaining drill string consists of a 10-foot joint of 12-inch pipe sleeved to achieve correct hole-cleaning characteristics. The total weight on bit is approximately 8 tons.

All beach drilling is carried out at low tide with a Casagrande B125 drilling rig, which tracks along a temporary beach road. Two 1,500-cfm/150-psi compressors are used to generate up to 3,000 cfm of air with the hammer typically running at 125 psi. All lubrication is provided by an ASL venturi type system supplying a marine and environmentally sensitive lubricant. To conduct drilling, the rig is accurately positioned over the pile location where care is taken to collar the hole and then drill to required depth. When the drilling is finished, the rig is moved off the hole and a precast 301⁄2-inch pile is located and grouted into position.

A Casagrande RM21 rig is conducting all drilling out at sea and contains the same compressor, lubrication and the basic drill string set-up that is used on the beach, but with a longer upper string due platform height from sea level. The RM21 is mounted on a base that slides along the platform “bull bar” to each hole position.

Each hole requires a 36-inch temporary casing to be socketed into the seabed; when the casing is positioned, a crane drops the hammer assembly and drill string into the hole. The rig is slid over the hole and connected to the drill string. Care is taken to collar the hole before drilling the socket 9 feet to 15 feet into the sea floor. Upon completion, the drill string is removed for use on the next hole. A precast concrete and steel pile then is dropped into the drilled hole and grouted through built-in tremie lines. The temporary casing is removed and reused on the next hole.

The larvic granite is transported from Norway by large ocean-going barges that anchor approximately 2,625 feet offshore, and the rock is lightered to smaller barges for delivery to the project location. For the sea defenses around North Bay, the rock was dropped on the sea bed/beach at high tide as close to the site as possible. At low tide, heavy earth-moving equipment adapted for handling large boulders maneuvered them into position against the existing sea wall. In the final stages, the Acropodes are set in position.

Any project calling for the installation of 605 piles in two different environments requires proper planning and selection of the right drilling solutions to yield consistent, reliable results. In the early stages of this project, it is clear that the foresight of Ritchies to utilize both the experience and products offered by H&F Drilling and Numa has paid off. Ritchies has realized an average penetration rate of 16 feet per hour and has been able to meet its projected plan for pile installation. With these results, the Scarborough coastline along The Holms, Castle Headland and East Pier will be protected for generations to come.
ND

Share This Story

Looking for a reprint of this article?
From high-res PDFs to custom plaques, order your copy today!

Recommended Content

JOIN TODAY
to unlock your recommendations.

Already have an account? Sign In

  • geotechnical drilling rig

    6 Onsite Phrases Environmental Drillers Hate

    Here are six phrases that highlight common frustrations...
    Opinions
    By: Jeff Garby
  • Wayne Nash

    Pipe Stuck? Common Causes and Solutions for Drillers

    If you have drilled for any length of time, sooner or...
    Opinions
    By: Wayne Nash
  • submersible pumps, water well pumps

    Selecting and Sizing Submersible Pump Cable

    This article helps pump installers and servicers decide...
    Markets
    By: Bob Pelikan
You must login or register in order to post a comment.

Report Abusive Comment

Subscribe For Free!
  • eNewsletters
  • Online Registration
  • Subscription Customer Service
  • Manage My Preferences

The Driller Newscast, Episode 147: Global Geothermal Collaboration at NY-GEO 2025

The Driller Newscast, Episode 147: Global Geothermal Collaboration at NY-GEO 2025

The Driller Newscast: Coiled Tubing Drilling and the Future of Geothermal

The Driller Newscast: Coiled Tubing Drilling and the Future of Geothermal

The Driller Newscast: 21st Century Drillers | Part 1 DEMAND

The Driller Newscast: 21st Century Drillers | Part 1 DEMAND

The Driller Newscast: New York Geo Talks 2025 Conference with Hands-on Driller Education

The Driller Newscast: New York Geo Talks 2025 Conference with Hands-on Driller Education

More Videos

Sponsored Content

Sponsored Content is a special paid section where industry companies provide high quality, objective, non-commercial content around topics of interest to the The Driller audience. All Sponsored Content is supplied by the advertising company and any opinions expressed in this article are those of the author and not necessarily reflect the views of The Driller or its parent company, BNP Media. Interested in participating in our Sponsored Content section? Contact your local rep!

close
  • demo of a DM450 drilling rig during a customer factory visit
    Sponsored byGeoprobe

    Built for You: Smarter Drill Rigs, Stronger Support, Bigger Opportunities

Popular Stories

MainPhotoTwoBrothers.jpg

Two Brothers' Journey Through the Drilling Industry

demo of a DM450 drilling rig during a customer factory visit

Built for You: Smarter Drill Rigs, Stronger Support, Bigger Opportunities

AI and Drought Concerns

AI’s Growing Thirst for Water and Power

The Driller Classifieds

COMPRESSORS

EAST WEST MACHINERY & DRILLING IS BUYING AND SELLING AIR COMPRESSORS, AIR BOOSTERS, AIR ENDS & PARTS
Company: East West Machinery

DRILL RIGS

LOOKING FOR LATE MODEL TOPHEADS & DRILLTECH D25'S
Company: Spikes’s Rig Sales

DRILL RIG PARTS

MEETING DRILLERS NEEDS AROUND THE WORLD
Company: East West Machinery

ELEVATORS

SEMCO INC. PIPE ELEVATORS
Company: Semco Inc.

GROUTERS

GROUTING EQUIPMENT - GROUT PUMPS & GROUT HOSE REELS
Company: Geo-Loop Inc.

PUMP HOISTS

SEMCO INC. - BASIC PUMP HOISTS
Company: Semco Inc.

WELL PACKERS

LANSAS PRODUCTS - INFLATABLE WELL PACKERS
Company: Vanderlans Lansas Products

WELL SCREENS

WELL SCREENS & SLOTTED PIPE
Company: Alloy Screen Works

Products

Water Quality Engineering: Physical / Chemical Treatment Processes

Water Quality Engineering: Physical / Chemical Treatment Processes

By carefully explaining both the underlying theory and the underlying mathematics, this text enables readers to fully grasp the fundamentals of physical and chemical treatment processes for water and wastewater.

See More Products

Subscribe to The Driller Newscast

Related Articles

  • The Reverse Oklahoma Land Rush

    See More
  • For Openers: News and Notes at Press Time

    See More
  • For Openers: News and Notes at Press Time

    See More
×

Dig deeper into the drilling and water supply industry!

Build your knowledge with The Driller, covering the people, equipment and technologies across drilling markets.

SIGN UP NOW
  • RESOURCES
    • Advertise
    • Contact Us
    • Directories
    • Store
    • Want More
    • Classifieds
  • SIGN UP TODAY
    • Create Account
    • eNewsletters
    • Customer Service
    • Manage Preferences
  • SERVICES
    • Marketing Services
    • Reprints
    • Market Research
    • List Rental
    • Survey/Respondent Access
  • STAY CONNECTED
    • LinkedIn
    • Facebook
    • YouTube
    • X (Twitter)
  • PRIVACY
    • PRIVACY POLICY
    • TERMS & CONDITIONS
    • DO NOT SELL MY PERSONAL INFORMATION
    • PRIVACY REQUEST
    • ACCESSIBILITY

Copyright ©2025. All Rights Reserved BNP Media.

Design, CMS, Hosting & Web Development :: ePublishing

The Driller
search
cart
facebook twitter linkedin youtube
  • Sign In
  • Create Account
  • Sign Out
  • My Account
The Driller
  • NEWS
    • Water
    • Geothermal
    • Construction
    • Environmental
    • Mining
    • All Industry News
  • CLASSIFIEDS
  • EQUIPMENT
    • Rigs & Heavy Equipment
    • Consumables
    • Pumps
    • Featured Products
  • SAFETY
  • VIDEOS
    • Newscast
    • Drill Talks
    • Ask Brock
    • Emerging Drillers
  • EDUCATION
    • Drilling Business Insights
    • Reference Desk
    • Sponsored Insights
  • SOURCEBOOK
  • EVENTS
    • Conferences & Demo Days
    • Newscast LIVE
  • SUBMIT
    • Drillers @Work
  • ABOUT
    • Contact
    • Advertise
  • SIGN UP