The Driller
  • Sign In
  • Create Account
  • Sign Out
  • My Account
  • NEWS
  • CLASSIFIEDS
  • EQUIPMENT
  • SAFETY
  • VIDEOS
  • EDUCATION
  • SOURCEBOOK
  • EVENTS
  • SUBMIT
  • ABOUT
  • SIGN UP
cart
facebook twitter linkedin youtube
  • NEWS
  • Water
  • Geothermal
  • Construction
  • Environmental
  • Mining
  • All Industry News
  • EQUIPMENT
  • Rigs & Heavy Equipment
  • Consumables
  • Pumps
  • Featured Products
  • VIDEOS
  • Newscast
  • Drill Talks
  • Ask Brock
  • Emerging Drillers
  • EDUCATION
  • Drilling Business Insights
  • Reference Desk
  • Sponsored Insights
  • EVENTS
  • Conferences & Demo Days
  • Newscast LIVE
  • SUBMIT
  • Drillers @Work
  • ABOUT
  • Contact
  • Advertise
The Driller
search
cart
facebook twitter linkedin youtube
  • Sign In
  • Create Account
  • Sign Out
  • My Account
The Driller
  • NEWS
    • Water
    • Geothermal
    • Construction
    • Environmental
    • Mining
    • All Industry News
  • CLASSIFIEDS
  • EQUIPMENT
    • Rigs & Heavy Equipment
    • Consumables
    • Pumps
    • Featured Products
  • SAFETY
  • VIDEOS
    • Newscast
    • Drill Talks
    • Ask Brock
    • Emerging Drillers
  • EDUCATION
    • Drilling Business Insights
    • Reference Desk
    • Sponsored Insights
  • SOURCEBOOK
  • EVENTS
    • Conferences & Demo Days
    • Newscast LIVE
  • SUBMIT
    • Drillers @Work
  • ABOUT
    • Contact
    • Advertise
  • SIGN UP

The Geothermal Industry Beckons - Part 3

August 1, 2005
This steadily rising market is a solid opportunity for contractors.

There are a couple key recommendations to follow when drilling or excavating for a direct-exchange (DX) geothermal field. Before the soil is disturbed, of course, the site must be inspected to ensure the absence of electric, gas, water, sewer, irrigation and telephone lines. Excavations are subject to OSHA regulations and earth loop installations are not to be within:

  • 10 feet of a water line

  • 50 feet of a water well, septic system, drainage zone of a building downspout, or below the collection basin of de-icing salts or barnyard runoff

  • One-half the branch extremities of a tree or shrub.

Both manufacturers of DX systems - ECR Technologies Inc. and American Geothermal DX - recommend that soils be checked for high concentrations of acids, chlorides, hydrogen sulfide, sulfates or ammonia; they're to be avoided because of the potential for copper corrosion. ECR offers a cathodic protection system that emits a small, self-adjusting electric current that prohibits corrosion. To determine whether or not this is an issue, soil samples can be taken at a depth of 3 feet where the manifold pit would be placed.

An ECR manual states that soil samples are to be taken with a coring tube; they specifically recommend the LaMotte Model 1016. (Go to www.lamotte.com and type “1016” into its embedded search engine.) Soil samples then are tested for pH with a reliable pH-testing device. The one recommended by ECR is the LaMotte Model 1741.

Locations with a pH higher than 11 or lower than 6, or coastal areas with brackish water marshes, saltwater intrusion or acidic peat bogs are to be avoided unless cathodic protection is provided with an impressed electrical current. ECR's installation manual shows the general layout of the CPS system. Essentially, the anode location should be 50 feet from the nearest earth loop refrigerant line for pit or trench loop configurations. And, there must be no underground metallic lines between the anode and the earth loop system.

Once the earth loop (or geo field) is in, installation of a ground source heat pump is very similar to an air source installation. Geothermal condensing units (the enclosure with the compressor) don't require air circulation, as do typical air source systems, so they may be installed in a basement or utility room. System ducting and the setting of equipment are comparable.

There's one thing that direct-exchange geothermal drilling contractors fully agree on, and that's the need for training. Not only do they readily agree on the need for training before entering the field, they all place it as the first priority. “The training we got at both TEI Rock Drills and ECR made it possible for us to get into the business successfully, and thrive,” explains one driller. “Without it, all bets are off.”

Adds another: “We eagerly encourage drillers to consider the direct-exchange drilling. But, without the training, it would be futile. The training saved us so much time, prepared us for the work, made it possible for us to be profitable, and gave us the time to enjoy life, too. It's a move we'll never regret.”
ND

John Vastyan is a Manhein, Pa.-based journalist and communications professional whose work focuses on the geothermal, plumbing and mechanical and radiant heat industries. He can be reached at 717-664-0535, or by email: cground@ptd.net.



Sidebar: After the Drilling, Grouting Takes Center Stage

by David Harris

Installation of an earth loop system normally requires the need for drilling permits from the local oversight agency.

The permitting fees and grout seal depth requirements for the boreholes often vary, depending on the stated expectations of the city or county agency. Borehole grouting often is observed and documented by local oversight inspectors for approval and acceptance.

After the boreholes are drilled and the copper loops installed, the boreholes are sealed by pressure grouting with an approved grout slurry mix.

A 1-inch tremie pipe is installed into the borehole to within 3 feet to 5 feet of the bottom.

A grout mixture consisting of Type 2 cement, #30 fine silica sand, sodium bentonite, Superplastisizer and water is mixed using a chem-grout piston pressure pump or something similar. As the mix is pumped into the borehole, the tremie pipe gradually is removed.

If the boreholes are stable and can remain open, several can be grouted at one time. If they're unstable or caving conditions occur, each borehole must be grouted individually. The mix must have the proper amount of water to pump smoothly without clogging hoses and related piping. One of the things we always look for is an adequate supply of water at the jobsite. We need it not only for the grouting, but for cleanup of equipment without delays, too.

David Harris is the owner of Consolidated Testing Laboratories Inc., Porterville, Calif.

Share This Story

Looking for a reprint of this article?
From high-res PDFs to custom plaques, order your copy today!

Recommended Content

JOIN TODAY
to unlock your recommendations.

Already have an account? Sign In

  • geotechnical drilling rig

    6 Onsite Phrases Environmental Drillers Hate

    Here are six phrases that highlight common frustrations...
    Markets
    By: Jeff Garby
  • Wayne Nash

    Pipe Stuck? Common Causes and Solutions for Drillers

    If you have drilled for any length of time, sooner or...
    Markets
    By: Wayne Nash
  • submersible pumps, water well pumps

    Selecting and Sizing Submersible Pump Cable

    This article helps pump installers and servicers decide...
    Equipment
    By: Bob Pelikan
You must login or register in order to post a comment.

Report Abusive Comment

Subscribe For Free!
  • eNewsletters
  • Online Registration
  • Subscription Customer Service
  • Manage My Preferences

The Driller Newscast: 21st Century Drillers | Part 1 DEMAND

The Driller Newscast: 21st Century Drillers | Part 1 DEMAND

The Driller Newscast: New York Geo Talks 2025 Conference with Hands-on Driller Education

The Driller Newscast: New York Geo Talks 2025 Conference with Hands-on Driller Education

The Driller Newscast, Episode 147: Global Geothermal Collaboration at NY-GEO 2025

The Driller Newscast, Episode 147: Global Geothermal Collaboration at NY-GEO 2025

The Driller Newscast: Coiled Tubing Drilling and the Future of Geothermal

The Driller Newscast: Coiled Tubing Drilling and the Future of Geothermal

More Videos

Sponsored Content

Sponsored Content is a special paid section where industry companies provide high quality, objective, non-commercial content around topics of interest to the The Driller audience. All Sponsored Content is supplied by the advertising company and any opinions expressed in this article are those of the author and not necessarily reflect the views of The Driller or its parent company, BNP Media. Interested in participating in our Sponsored Content section? Contact your local rep!

close
  • demo of a DM450 drilling rig during a customer factory visit
    Sponsored byGeoprobe

    Built for You: Smarter Drill Rigs, Stronger Support, Bigger Opportunities

Popular Stories

MainPhotoTwoBrothers.jpg

Two Brothers' Journey Through the Drilling Industry

demo of a DM450 drilling rig during a customer factory visit

Built for You: Smarter Drill Rigs, Stronger Support, Bigger Opportunities

AI and Drought Concerns

AI’s Growing Thirst for Water and Power

The Driller Classifieds

COMPRESSORS

EAST WEST MACHINERY & DRILLING IS BUYING AND SELLING AIR COMPRESSORS, AIR BOOSTERS, AIR ENDS & PARTS
Company: East West Machinery

DRILL RIGS

LOOKING FOR LATE MODEL TOPHEADS & DRILLTECH D25'S
Company: Spikes’s Rig Sales

DRILL RIG PARTS

MEETING DRILLERS NEEDS AROUND THE WORLD
Company: East West Machinery

ELEVATORS

SEMCO INC. PIPE ELEVATORS
Company: Semco Inc.

GROUTERS

GROUTING EQUIPMENT - GROUT PUMPS & GROUT HOSE REELS
Company: Geo-Loop Inc.

PUMP HOISTS

SEMCO INC. - BASIC PUMP HOISTS
Company: Semco Inc.

WELL PACKERS

LANSAS PRODUCTS - INFLATABLE WELL PACKERS
Company: Vanderlans Lansas Products

WELL SCREENS

WELL SCREENS & SLOTTED PIPE
Company: Alloy Screen Works

Products

Water Quality Engineering: Physical / Chemical Treatment Processes

Water Quality Engineering: Physical / Chemical Treatment Processes

By carefully explaining both the underlying theory and the underlying mathematics, this text enables readers to fully grasp the fundamentals of physical and chemical treatment processes for water and wastewater.

See More Products

Subscribe to The Driller Newscast

Related Articles

  • The Geothermal Industry Beckons - Part 1

    See More
  • The Geothermal Industry Beckons - Part 2

    See More
  • What’s Up in The World of Drill Rigs — Part 3

    See More
×

Dig deeper into the drilling and water supply industry!

Build your knowledge with The Driller, covering the people, equipment and technologies across drilling markets.

SIGN UP NOW
  • RESOURCES
    • Advertise
    • Contact Us
    • Directories
    • Store
    • Want More
    • Classifieds
  • SIGN UP TODAY
    • Create Account
    • eNewsletters
    • Customer Service
    • Manage Preferences
  • SERVICES
    • Marketing Services
    • Reprints
    • Market Research
    • List Rental
    • Survey/Respondent Access
  • STAY CONNECTED
    • LinkedIn
    • Facebook
    • YouTube
    • X (Twitter)
  • PRIVACY
    • PRIVACY POLICY
    • TERMS & CONDITIONS
    • DO NOT SELL MY PERSONAL INFORMATION
    • PRIVACY REQUEST
    • ACCESSIBILITY

Copyright ©2025. All Rights Reserved BNP Media.

Design, CMS, Hosting & Web Development :: ePublishing

The Driller
search
cart
facebook twitter linkedin youtube
  • Sign In
  • Create Account
  • Sign Out
  • My Account
The Driller
  • NEWS
    • Water
    • Geothermal
    • Construction
    • Environmental
    • Mining
    • All Industry News
  • CLASSIFIEDS
  • EQUIPMENT
    • Rigs & Heavy Equipment
    • Consumables
    • Pumps
    • Featured Products
  • SAFETY
  • VIDEOS
    • Newscast
    • Drill Talks
    • Ask Brock
    • Emerging Drillers
  • EDUCATION
    • Drilling Business Insights
    • Reference Desk
    • Sponsored Insights
  • SOURCEBOOK
  • EVENTS
    • Conferences & Demo Days
    • Newscast LIVE
  • SUBMIT
    • Drillers @Work
  • ABOUT
    • Contact
    • Advertise
  • SIGN UP