The standard operating procedures are outlined here.
A monitoring well must be investigated before it is destroyed or abandoned to determine both its condition and the details of its construction. The well will be sounded (its depth measured with a weighted line or appropriate method) immediately before it is destroyed to make sure that it contains no obstructions that could interfere with filling and sealing.