The Driller
  • Sign In
  • Create Account
  • Sign Out
  • My Account
  • NEWS
  • CLASSIFIEDS
  • EQUIPMENT
  • SAFETY
  • VIDEOS
  • EDUCATION
  • SOURCEBOOK
  • EVENTS
  • SUBMIT
  • ABOUT
  • SIGN UP
cart
facebook twitter linkedin youtube
  • NEWS
  • Water
  • Geothermal
  • Construction
  • Environmental
  • Mining
  • All Industry News
  • EQUIPMENT
  • Rigs & Heavy Equipment
  • Consumables
  • Pumps
  • Featured Products
  • VIDEOS
  • Newscast
  • Drill Talks
  • Ask Brock
  • Emerging Drillers
  • EDUCATION
  • Drilling Business Insights
  • Reference Desk
  • Sponsored Insights
  • EVENTS
  • Conferences & Demo Days
  • Newscast LIVE
  • SUBMIT
  • Drillers @Work
  • ABOUT
  • Contact
  • Advertise
The Driller
search
cart
facebook twitter linkedin youtube
  • Sign In
  • Create Account
  • Sign Out
  • My Account
The Driller
  • NEWS
    • Water
    • Geothermal
    • Construction
    • Environmental
    • Mining
    • All Industry News
  • CLASSIFIEDS
  • EQUIPMENT
    • Rigs & Heavy Equipment
    • Consumables
    • Pumps
    • Featured Products
  • SAFETY
  • VIDEOS
    • Newscast
    • Drill Talks
    • Ask Brock
    • Emerging Drillers
  • EDUCATION
    • Drilling Business Insights
    • Reference Desk
    • Sponsored Insights
  • SOURCEBOOK
  • EVENTS
    • Conferences & Demo Days
    • Newscast LIVE
  • SUBMIT
    • Drillers @Work
  • ABOUT
    • Contact
    • Advertise
  • SIGN UP

Heeter Proves Naysayers Wrong

May 1, 2003
Drilling contractor completes job others thought impossible.

Work currently is underway to repair a section of State Route 7 (SR7) near Powhatan Point in Belmont County, Ohio, that was damaged in 1998 by the flooding of the Ohio River. Since the flooding, the road has been slowly shifting from its bedrock and slipping toward the river. Over a mile of SR 7 will be relocated approximately 50 feet inland in order to place the highway on stable bedrock and stop the slide activity caused by the flooding in 1998.

But before the road work could commence on re-placing SR 7, one big obstacle had to be overcome – the mountain that runs north alongside of SR 7 had to be cut away to make room inland for the highway.

Getting the Job Done

The Ohio Department of Transportation (ODOT) mandated from the beginning that at least one lane of traffic had to be maintained at all times throughout the entire project, and that the majority of the project had to be constructed while maintaining two lanes of traffic. ODOT also promised travelers that SR 7 traffic would only be stopped for a maximum of 20 minutes during blasting operations to excavate the hillside.

Contractors thinking of bidding the SR 7 project knew that operating within the ODOT regulations would be the key to getting the job done right, but many believed it couldn’t be done without closing the road. ODOT identified the ground conditions on the project site as being freshwater limestone and shale.

The SR 7 contract was awarded to primary contractor Alan Stone Co. of Chesterhill, Ohio, which engaged Heeter Construction of Spencer, W. Va., for the management of drilling and excavating work. Alan Stone subcontracted the blasting work to Mt. State Bit Service Inc. of Morgantown, W. Va.

“Everyone told us that we’d never be able to do the project without closing the road,” says Dave Heeter Jr. of Heeter Construction. “We also had people tell us it was impossible to do a project of this size with our Ingersoll-Rand ECM-660 drills – that we needed larger drills with more power. We proved them wrong. For the last 18 months, our three IR drills have been outrunning our two 10-yard excavators.”

According to Heeter Jr., IR ECM-660s were chosen because the crew can pre-split from bench to bench – on the one-to-one pre-splits with 2,600 square feet, the Heeter Construction crew accomplished 70-foot slope, 50-foot vertical plus production drilling of 6,400 cubic yards. When the job is completed, there will be a total of nine benches. The 37-degree angle achieved on the pre-splits will provide erosion control.

“Our drills have been the most reliable pieces of equipment on the project. We bought these drills brand new just for this project,” explains Heeter Jr. “We keep a regular preventive maintenance service schedule – servicing every 250 hours, replacing all the fluids and filters, up to 1,000 hours, then we start over.

“We’ve only had to call our dealer, Anderson Equipment Co. in Charleston, W. Va., to come out seven times in 18 months to service our equipment. We’ve been very successful on this project, thanks to good management and good equipment.”

The Process

With a lineup of three drills, two excavators, several dozers and one grader, Heeter Construction went to work in August 2001. The crew began the process of drilling a series of 31⁄2-inch blast holes needed to remove a 6,000-foot-long section of the 500-foot mountain running along SR 7.

Burden-in-spacing, the distance between blast holes, is most often determined by the ground conditions of the project site. This time, other factors also were involved in the decision.

According to Heeter Jr., during the mid-1980s, the project had been pre-cut, and the contractor had shot hard, leaving lots of voids in the rock. So, the Heeter Construction crews proceeded with caution, choosing to drill smaller holes, with tighter spacing – 31⁄2-inch pre-split holes and 41⁄2-inch production holes with 10-foot spacing, which provides a more uniform break in the rock. The smaller-sized holes also help the crew control the outward blast.

Once the holes were drilled, the Mt. State Bit Service team came in and loaded the holes, using a combination of ammonium nitrate (fertilizer) and diesel fuel called ANFO, and blasted. As soon as the dust settled, the Heeter Construction team immediately moved in with excavators and began the cleanup process.

Mandating that Heeter Construction crews establish a “fall zone” behind the road to stop blasting debris, ODOT dictated that blasting could only occur during daylight hours – no blasting could take place within 20 minutes of sundown. Heeter Construction also maintained a clean “catch bench” at all times so that debris never would become an issue.

Moving Material

"During peak production, the crews shot up to three times a day,” Heeter Jr. notes. “Near the end of the project, we’ve only been blasting once a day – at noon, when there was the least amount of traffic. Our biggest shot was 800 holes that covered 50,000 yards.”

ODOT notified emergency response services in the area when blasting would occur and regulated the schedule to minimize disruption. ODOT had inspectors on-site at all times during the project.

In peak production, Heeter Construction was running two crew shifts, 50 employees, on six 10-hour days, moving 30,000 yards a day with two excavators and nine trucks (60-ton and 100-ton sizes). As the project nears completion, Heeter Construction has gone down to running two shifts four days a week, moving 12,000 yards a day with one excavator. According to Heeter Jr., the trucks were rated to remove 40 yards per load – an average load weighed approximately 112 tons.

The original bid was for Heeter Construction to remove 2,500 cubic yards, but the final amount of material to be removed came to approximately 6,500 cubic yards. The total project of moving the mountain took close to 21 months. The road building crews of Alan Stone Co. will start once Heeter Construction is finished with the excavation work.

The entire SR 7 project is expected to be completed by July 2003.

Right the First Time

Heeter Construction has been established in the earthmoving/heavy construction market for 34 years. The company is a family business, owned by David Heeter Sr., and provides a variety of services, including the construction of earthen dams, roller-compacted concrete dams, earth levees and land fills, highways and commercial site development as well as other miscellaneous projects.

With a well-deserved reputation for completing projects ahead of schedule, the majority of Heeter Construction projects are completed in less than 50 percent of the allocated contract time. The company prides itself in being able to determine the resources necessary to complete the job in an efficient manner and having all of those resources available at the start of the job.

Heeter Construction provides personal superintendence to the work on each project site – by being personally involved in the day-to-day work, crews are better able to anticipate and be prepared for any and all eventualities. And, Heeter Construction takes pride in its work. The company motto is “Do it right the first time!”



Project Profile

Contractor: Heeter Construction of Spencer, West Virginia

Client: Ohio Department of Transportation

Application: Drilling blast holes and excavating materials for SR 7 highway project along the Ohio River to remove a 6,000-foot long section of the 500-foot mountain running along SR 7.

Hole size: 31⁄2-inch pre-split and 41⁄2 -inch production holes

Depth: One-on-one pre-splits of 70-foot slope, 50-foot vertical plus production drilling of 6.4M cubic yards, at a 37-degree angle

Formation: Freshwater limestone and shale

Rig type: Three Ingersoll-Rand ECM-660 crawler drills

Length of project: 21 months (Started August 2001, completed April 2003)

Share This Story

Looking for a reprint of this article?
From high-res PDFs to custom plaques, order your copy today!

Recommended Content

JOIN TODAY
to unlock your recommendations.

Already have an account? Sign In

  • geotechnical drilling rig

    6 Onsite Phrases Environmental Drillers Hate

    Here are six phrases that highlight common frustrations...
    Environmental Monitoring
    By: Jeff Garby
  • Wayne Nash

    Pipe Stuck? Common Causes and Solutions for Drillers

    If you have drilled for any length of time, sooner or...
    World According to Wayne
    By: Wayne Nash
  • submersible pumps, water well pumps

    Selecting and Sizing Submersible Pump Cable

    This article helps pump installers and servicers decide...
    Markets
    By: Bob Pelikan
You must login or register in order to post a comment.

Report Abusive Comment

Subscribe For Free!
  • eNewsletters
  • Online Registration
  • Subscription Customer Service
  • Manage My Preferences

The Driller Newscast: Coiled Tubing Drilling and the Future of Geothermal

The Driller Newscast: Coiled Tubing Drilling and the Future of Geothermal

The Driller Newscast: New York Geo Talks 2025 Conference with Hands-on Driller Education

The Driller Newscast: New York Geo Talks 2025 Conference with Hands-on Driller Education

The Driller Newscast: 21st Century Drillers | Part 1 DEMAND

The Driller Newscast: 21st Century Drillers | Part 1 DEMAND

The Driller Newscast, Episode 147: Global Geothermal Collaboration at NY-GEO 2025

The Driller Newscast, Episode 147: Global Geothermal Collaboration at NY-GEO 2025

More Videos

Sponsored Content

Sponsored Content is a special paid section where industry companies provide high quality, objective, non-commercial content around topics of interest to the The Driller audience. All Sponsored Content is supplied by the advertising company and any opinions expressed in this article are those of the author and not necessarily reflect the views of The Driller or its parent company, BNP Media. Interested in participating in our Sponsored Content section? Contact your local rep!

close
  • demo of a DM450 drilling rig during a customer factory visit
    Sponsored byGeoprobe

    Built for You: Smarter Drill Rigs, Stronger Support, Bigger Opportunities

Popular Stories

MainPhotoTwoBrothers.jpg

Two Brothers' Journey Through the Drilling Industry

AI and Drought Concerns

AI’s Growing Thirst for Water and Power

demo of a DM450 drilling rig during a customer factory visit

Built for You: Smarter Drill Rigs, Stronger Support, Bigger Opportunities

The Driller Classifieds

COMPRESSORS

EAST WEST MACHINERY & DRILLING IS BUYING AND SELLING AIR COMPRESSORS, AIR BOOSTERS, AIR ENDS & PARTS
Company: East West Machinery

DRILL RIGS

LOOKING FOR LATE MODEL TOPHEADS & DRILLTECH D25'S
Company: Spikes’s Rig Sales

DRILL RIG PARTS

MEETING DRILLERS NEEDS AROUND THE WORLD
Company: East West Machinery

ELEVATORS

SEMCO INC. PIPE ELEVATORS
Company: Semco Inc.

GROUTERS

GROUTING EQUIPMENT - GROUT PUMPS & GROUT HOSE REELS
Company: Geo-Loop Inc.

PUMP HOISTS

SEMCO INC. - BASIC PUMP HOISTS
Company: Semco Inc.

WELL PACKERS

LANSAS PRODUCTS - INFLATABLE WELL PACKERS
Company: Vanderlans Lansas Products

WELL SCREENS

WELL SCREENS & SLOTTED PIPE
Company: Alloy Screen Works

Products

Water Quality Engineering: Physical / Chemical Treatment Processes

Water Quality Engineering: Physical / Chemical Treatment Processes

By carefully explaining both the underlying theory and the underlying mathematics, this text enables readers to fully grasp the fundamentals of physical and chemical treatment processes for water and wastewater.

See More Products

Subscribe to The Driller Newscast

Related Articles

  • Heeter Proves Naysayers Wrong

    See More
  • Can't Go Wrong at Jubilee

    See More
  • National Driller tries to reflect the industry while also serving as a public forum. Readers help us do that.

    Readers Remind National Driller of Water Well Driller Priorities

    See More
×

Dig deeper into the drilling and water supply industry!

Build your knowledge with The Driller, covering the people, equipment and technologies across drilling markets.

SIGN UP NOW
  • RESOURCES
    • Advertise
    • Contact Us
    • Directories
    • Store
    • Want More
    • Classifieds
  • SIGN UP TODAY
    • Create Account
    • eNewsletters
    • Customer Service
    • Manage Preferences
  • SERVICES
    • Marketing Services
    • Reprints
    • Market Research
    • List Rental
    • Survey/Respondent Access
  • STAY CONNECTED
    • LinkedIn
    • Facebook
    • YouTube
    • X (Twitter)
  • PRIVACY
    • PRIVACY POLICY
    • TERMS & CONDITIONS
    • DO NOT SELL MY PERSONAL INFORMATION
    • PRIVACY REQUEST
    • ACCESSIBILITY

Copyright ©2025. All Rights Reserved BNP Media.

Design, CMS, Hosting & Web Development :: ePublishing

The Driller
search
cart
facebook twitter linkedin youtube
  • Sign In
  • Create Account
  • Sign Out
  • My Account
The Driller
  • NEWS
    • Water
    • Geothermal
    • Construction
    • Environmental
    • Mining
    • All Industry News
  • CLASSIFIEDS
  • EQUIPMENT
    • Rigs & Heavy Equipment
    • Consumables
    • Pumps
    • Featured Products
  • SAFETY
  • VIDEOS
    • Newscast
    • Drill Talks
    • Ask Brock
    • Emerging Drillers
  • EDUCATION
    • Drilling Business Insights
    • Reference Desk
    • Sponsored Insights
  • SOURCEBOOK
  • EVENTS
    • Conferences & Demo Days
    • Newscast LIVE
  • SUBMIT
    • Drillers @Work
  • ABOUT
    • Contact
    • Advertise
  • SIGN UP