The goal of all drilling programs should be to minimize the amount of impact the drilling process has on the geology outside the borehole. From the beginning of the hole to bottom, the minimal impact will create stable borehole conditions that allow easy product installation and efficient extraction of water, mineral, or energy out of the ground.
Water well production is 100-percent dependent on minimizing impact to the production zone. We use particular well development methods to repair our negative impact to a production zone by improving the zone’s water passage. In fact, the term “porosity” comes from the Latin term “poros,” meaning passage. Good-producing water wells are drilled and developed properly to ensure the most open pore spaces to effectively allow water into the screened interval.